  • 서울특별시회는 지난 4월 13일 서울시 도시기반시설본부와 합동으로 (주)동보엔지니어링이 시공 중인 '마포석유비축기지 재생 및 공원조성 기계설비공사' 현장을 방문하여 안전 및 품질점검을 실시했다. 이날 품질점검에는 발주처인 서울시 도시기반시설본부 관계자를 비롯하여 감리단장, 기계감리 등이 참석하여 시공현황을 체크했다. 서울시회 김수철 상임부회장은 (주)동보엔지니어링 정광일 대표와 김원근 현장소장에게 "다른 현장보다도 더욱 우수한 공사품질과 체계적인 현장관리, 타 공중간의 소통에 의한 긴밀한 업무협조로 준공까지 공사 진행에 차질이 없도록 솔선수범하여 우수 시공사례 현장이 될 수 있도록 심혈을 기울여 달라"고 부탁했다.

  • PDF

Adjustment of Contract Price according to Introduction of Pay Adjustment (건설공사 지불규정제도 도입에 따른 공사비조정방안)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.175-180
    • /
    • 2010
  • Despite continuous efforts by the construction industry to achieve better quality, it doesn't seem that much has been improved. This is mainly because current specifications do not satisfy a change in the market environment, which is that a higher level of quality is now demanded by users. Quality improvement efforts have been satisfied merely to meet specifications. On the other hand, advanced countries have been experienced great success in their construction techniques and have reduced costs by introducing apay adjustment system to the construction industry, in which compensation is based on performance. Following their example, Koreashould introduce such a pay adjustment system in order to motivate the members of our construction industry to achieve better quality and a higher level of construction techniques. However, there has been a lack of a rational approach to the development of a system for cost coordination, as well as performance and quality inspection. Thus, in this study a legal and logical plan was developed that can be used to adjust the construction cost, along with the performance inspection of quality results, in order to introduce a pay adjustment system that is appropriate for domestic regulations.

An Analysis of the Conditions for Construction Supervision Fee (책임감리 용역 대가의 실태 분석 연구)

  • Choi, Sun-Hee;Choi, Hye-Mi;Lee, Jae-Young;Kim, Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.283-288
    • /
    • 2007
  • As constructions are changing variously from the size and efficiency, the role of supervision services tend to reach beyond mere monitoring or supervision to prevent fraudulence, but tend to extend toward a system that manages all the stages of the construction industry. There are growing demand to improve government operated corporation systems to secure high quality public facilities, and reviews on construction supervision system and supervision services roles, function, responsibility and obligations have been the topics among advanced researchers. However, the circumstance is that researches on the construction supervision service compensation and supervision services assignment criteria that serve as basis of such construction supervision system improvement are insufficient, and for practical development of construction supervision system, researches on construction supervision service compensation and supervision services assignment criteria will need to precede. Hence, this research purports to propose improvement directions of construction supervision system by deducing problems through condition survey on the construction supervision services ordered by public organizations.

  • PDF

레디믹스트콘크리트 현장배치플랜트 설치 및 관리에 관한 지침

  • 한국주택협회
    • 주택과사람들
    • /
    • no.47 s.64
    • /
    • pp.83-90
    • /
    • 1995
  • 건설기술관리법 제24조의 2 및 동법시행령 제47조의 3의 규정에 의한 품질시험 실시 대상 건설자재인 레디믹스트콘크리트에 대하여 당해건설공사의 품질을 철저하게 확보함과 동시에 적기공급을 도모하기 위해서 시공자가 현장배치플랜트를 설치하여 직접 생산${\cdot}$사용하는 경우 당해시공자 및 레디믹스트콘크리트 전문제조업자가 준수하여야 할 지침을 다음과 같이 고시합니다.

  • PDF

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects (공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.12-20
    • /
    • 2021
  • In order to secure construction quality and safety and prevent cost disputes, the importance of calculating 'the appropriate construction period' has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction period. However, many experts are raising questions about the use of past data due to changes in the construction business environment, such as shortening working hours, reinforcing quality regulations, and changing climate conditions. In addition, the possibility of errors increases when calculating a uniform construction period using historical statistics because the work order and productivity are very diverse according to construction conditions. Therefore, through this study, a new solution to change from the method of analyzing past data to the method of reviewing current production data through an active 'transformation of thoughts' was proposed through this study. In other words, the process of reviewing and calculating 'the appropriate construction period' was institutionalized by introducing 'process management experts' and 'construction experts by type of construction' in the design stage.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

The State of Art of RFID Technology for Construction Project in Korea (RFID 기술의 국내적용 실태)

  • Chang, Sang-Hyeok;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.819-822
    • /
    • 2007
  • Recently, U-Construction is a topic word of construction industry. U-construction is construction with IT technology that is ubiquitous. That will help that domestic construction industry which is lower technology than developed countries overcomes the competition. RFID technology which can be transmission of massage and the receipt of a massage with non touch is core of U-construction. The RFID technology has a big range of application. Man ${\cdot}$ Quality ${\cdot}$ Process ${\cdot}$ Safety ${\cdot}$ Distribution management is already applied to construction industry and especially, The Man ${\cdot}$ Safety management are spreaded widely. This thesis analyzes that the State of Art of RFID Technology to Construction in Korea through the survey and RFID Technology becoming wider by construction scale and period. Process' Distribution management show the trend which becomes wider by construction scale and period.

  • PDF

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.