Korean Journal of Construction Engineering and Management
/
v.21
no.1
/
pp.32-39
/
2020
The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.
Korean Journal of Construction Engineering and Management
/
v.16
no.2
/
pp.54-64
/
2015
It is required to be enhancement of competitiveness for specialty contractors' employees due to specialty contractors are in charge of the actual construction work. The effective educational program for specialty contractors' employees is essential to improve the work performance of them. Therefore, the purpose of this study is to analyze level of work performance and find factors of core competence for specialty contractors' employees that can be utilized for development of effective educational program. The survey is based on CEO, Engineer and Manager in specialty contractors, and a questionnaire survey was performed to investigate the importance of job task, work load and degree of work difficulty as well as their core competence needs. The analysis result of this study can be utilized for development of effective educational program which is reflected the characteristics of specialty contractor's employees.
Korean Journal of Construction Engineering and Management
/
v.18
no.1
/
pp.48-57
/
2017
The construction of the first nuclear power plant (Kori #1) in Korea started in 1971, Korea operates 24 nuclear power plants and is constructing 4 in 2015. During about 45 years of construction experience, insufficient studies have been investigated for the identification of critical success factors(CSFs) for nuclear power plant construction. Based on literature reviews and focus group interviews, this study presented a list of CSFs for construction of nuclear power plants. A survey for validating the results of CSFs was conducted with 164 experts. This study indicates that attentions should be placed upon the lowest price-based contract awarding policy, the need for reasonable pricing standard implementation, database development, and deployment for experienced nuclear power plant construction workers, identification and nurturing of competitive subcontractors, and minimization of lag times in construction activities.
Shin, Jae Young;Lee, Su In;Jang, Jung Ryeol;Ju, So Hee;Choi, Joong Dae
Proceedings of the Korea Water Resources Association Conference
/
2016.05a
/
pp.565-565
/
2016
농림부는 농업지역에서 발생하는 비점오염원을 관리하기 위해 다양한 최적관리기법(BMP)에 대해 연구를 수행하여 효과를 검증하였으나 이를 광역 단위로 보급하여 실제 영농지역에서 BMP의 효과를 측정한 연구는 부족한 실정이다. 따라서 본 연구에서는 논 지역을 대상으로 물관리기술(물꼬)과 시비관리기술(완효성 비료) BMP를 보급하고 광역 단위로 BMP의 효과를 측정하고자 하였다. 연구대상지구는 새만금 지역에 위치한 전라북도 부안군 용계리 일대에 위치하고 있으며, 벼농사가 활발하게 이루어지고 있는 지역을 선정하였다. 논에 보급된 BMP의 효과를 측정하기 위해 BMP 참여 농가를 선정하여 물꼬와 완효성 비료를 보급하였으며, 용수로와 배출구 3지점을 선정하여 관개량을 측정하고 유출량을 측정하였다. 또한 관개수와 대조구, 처리구별(대조구, 물꼬, 완효성, 물꼬+완효성) 수질을 분석하여 배출구 별로 단위면적당 오염부하량을 산정하고 이를 통해 대조구 대비 처리구의 저감율을 분석하였다. 분석 결과, 대조구 대비 처리구의 단위면적당 오염부하량의 저감율은 SS 63.6%, BOD 45.5%, $COD_{Mn}$ 26.5%, $COD_{Cr}$ 40.1%, T-N 16.0%, T-P 12.9%, TOC 11.4%로 나타났다. 또한 연구대상지구를 SO#1(완효성 비료 95%, 비참여 농가 5%), SO#2(완효성 비료 2%, 물꼬 8%, 완효성 비료+물꼬 40%, 비참여 농가 40%), SO#M(완효성 비료 96%, 비참여 농가 4%) 3개의 배출구로 구분하여 BMP 보급 효과를 측정한 결과, 대조구 대비 SO#1에서는 수질항목별로 10.6 ~ 85.5%, SO#2는 8.1 ~ 45.9%, SO#M은 10.7 ~ 86.2%의 범위로 저감된 것으로 분석되었으며, 특히 SS의 단위면적당 오염부하 저감율이 가장 큰 것으로 나타났다. 하지만 본 연구는 7월부터 10월까지 측정된 데이터를 활용하여 산정하였기 때문에 써레질, 이앙기간에 발생한 단위면적당 오염부하량은 포함되지 않은 결과이며, 각 배수구역별 유입량의 경우 정확한 측정에 어려움이 있어 전체 관개량 대비 관개 면적을 이용하여 단위면적당 유입량을 산정하였기 때문에 추가적인 연구를 통해 효과를 검증할 필요가 있을 것으로 판단된다.
The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.101-109
/
2004
The construction engineering field is less than $3\~5\%$ of the gross construction cost but engineering's role is very important because the performance of final facility is decided in the engineering stage. Nevertheless, before now government and private compares are more concentrated on construction works than making strategy to strengthen the competitiveness and technical development of investment in construction engineering sectors. Therefore this research have compared and analyzed the competitiveness of domestic construction engineering companies throughout analytic method 'SWOT' to those developing countries, which are potential big market objects, such as Russia Libya and Indonesia Such research was obtained through business trip & consultation with related specialists for the difficulties of domestic companies in advancing into overseas market. Moreover this research have analyzed the technical improvement of construction engineering companies and reason for competitiveness weaken by various aspects, it provides governmental and private plans to advance into overseas market Especially, to strengthen domestic companies into advancing overseas market it has suggested that tax & subsidy privileges, supporting plans for obtaining information of overseas and strategies cooperation with other organizations.
Korean Journal of Construction Engineering and Management
/
v.8
no.6
/
pp.188-196
/
2007
Because the construction is becoming bigger and the construction environment is rapidly changing, IT/IS(Information Technology and Information System) of the construction is recently suggested with the alternative proposal. So not only is a study progressed in the area of the BIM(Buidilng Information Modeling), VC(Virtual Construction) and CIC (Computer-Integrated Construction) but also of the information database of the construction for building the information infrastructure of the construction in the domestic construction. Because object-oriented 3D CAD improves the efficiency of a design work and includes the object information which can use with the base of the information database of the construction, it has the high value not only in the design level but also in the construction life cycle. But compared with the effect, the use of 3D CAD is sluggish in the construction. In this study, after surveying about lowly using 3D CAD on the point of AEC (Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using 3D CAD.
Korean Journal of Construction Engineering and Management
/
v.18
no.2
/
pp.12-20
/
2017
The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.
Project management in the Construction field inherently has more uncertainty and more risks relative to ones from other area. This is the very reason for why project management is recognized as the important task to construction companies. For getting better performance in the project management, we need a system that keeps the consistencies in a automatic or semi-automatic manner through the project management stages like as project definition stage, project planning stage, project design and implementation stage. But since the early stages such as definition and planning stages has many unstructured features and also are dependent to unique expertise or experience of a specific company, we have difficulty providing systematic support for the task of these stages. This kind of problem becomes harder to solve especially in the plant construction domain that is our target domain. Therefore, in this paper, we propose and also implement a systematic approach to resolve the problem mentioned for the early project management stages in the plant construction domain. The results of our approach can be used not only for the purpose of the early project management stages but also can be used automatically as an input to commercial project management tools for the middle project management stages. Because of doing in this way, the construction project can be consistently managed from the definition to implementation stage in a seamless manner. For achieving this purpose, we adopt knowledge based inference, CBR, and neural network as major methodologies and we also applied our approach to two real world cases, power plant and drainage treatment plant cases from a leading construction company in Korea. Since these two application cases showed us very successful results, we can say our approach was validated successfully to the plant construction area. Finally, we believe our approach will contribute to many project management problems from more broader construction area.
Kim, Ho-Jun;Nguyen, Thi Huong;Kang, Dongwon;Kwon, Hyun-Han
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.96-96
/
2021
수문기상인자 중 하나인 증발산량은 수자원 계획 및 관리 시 고려되며, 특히 물수지 모형 등의 입력자료로 활용된다. 우리나라를 포함한 각국 기상청 및 국제기구에서는 직접 관측이 아닌 FAO56 Penman-Monteith(PM)을 통해 증발산량을 산출하고 있다. FAO56 PM 방법은 복사(radiation), 대기온도(air temperature), 습도(humidity), 풍속(wind speed) 등의 기상인자로부터 기준증발산량(reference evapotransipiration)을 추정하며, 상대적으로 높은 정확성을 보여준다. 그러나 FAO56 PM 방법은 많은 기상인자를 요구하므로 미계측 유역을 포함한 일부지역에 대한 증발산량 자료 구축이 어려운 실정이다. 또한, 기준증발산량의 특성이 시간에 따라 변화하므로 비정상성(nonstationary)을 고려한 분석이 요구된다. 본 연구에서는 온도인자 기반의 대체모형(surrogate model)을 개발하여 기준증발산량의 비정상성을 고려하고자 한다. 한강유역에 위치한 관측소를 대상으로 모형을 개발하였으며, 시간에 따라 변동하는 기준증발산량의 특성을 고려하기 위해 Bayesian 추론기법을 통해 매개변수를 시간에 따라 추정하였다. 또한, 본 연구에서는 대체모형으로 산정된 증발산량을 활용해 가뭄지수인 EDDI(evaporative demand drought index)를 제시하였다. 가뭄 모니터링 및 조기 경보 안내를 위해 개발된 EDDI를 활용하여 기존 가뭄보다 빠르게 진행되는 초단기 가뭄(flash drought)를 평가하였다. 본 연구에서 개발된 모형은 미계측 지역에서도 적용이 가능하므로 수자원분야에서 활용성이 높을 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.