A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction  

Kang, Hyunwook (The Chartered Research Institute of Construction Costs)
Lee, Wonbae (Department of Architectural Engineering, Chung-Ang University)
Kim, Minjung (Department of Architectural Engineering, Chung-Ang University)
Kim, Yongsu (Department of Architectural Engineering, Chung-Ang University)
Publication Information
Korean Journal of Construction Engineering and Management / v.21, no.1, 2020 , pp. 32-39 More about this Journal
Abstract
The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.
Keywords
Aircraft Runway Construction Project; Actual Construction Data; Risk; Loss Cost; Case Study;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Han, S.H., Park, H.K., Yeom, S.M., Chae, M.J., and Kim, U.Y. (2014). "Risk-Integrated Cash Forecasting for Overseas Construction Projects." KSCE Journal of Civil Engineering, 18(4), pp. 875-886.   DOI
2 Cha, H.S., and Shin, K.Y. (2011). "Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea." Journal of Asian Architecture and Building Engineering, 10(2), pp. 437-444.   DOI
3 Kang, H.W., and Kim, Y.S. (2018). "A Model for Risk Cost and Bidding Price Prediction Based on Risk Information in Plant Construction Projects." KSCE Journal of Civil Engineering, 22(11), pp. 4215-4229.   DOI
4 Kang, H.W., and Kim, Y.S. (2016). "Analysis of the Probabilistic Cost Variation Ranges According to the Effect of Core Quantitative Risk Factors for an Overseas Plant Project." KSCE Journal of Civil Engineering, 20(2), pp. 509-518.   DOI
5 Kim, Y.S., and Kang, H.W. (2017). "Development of a Model for Risk and Cost Analysis in Overseas Plant Construction Projects." KSCE Journal of Civil Engineering, 20(5), pp. 1549-1562.
6 Kim, J.H. (2010). "Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site." Journal of the Korea Institute of Building Construction, 10(4), pp. 83-93.   DOI
7 Ahn, S. (2015). "A Case Study of the Risk Identification in Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 15-23.   DOI