A Study on Estimating Construction Cost of Apartment Housing Projects Using Genetic Algorithm-Support Vector Regression (유전 알고리즘 - 서포트 벡터 회귀를 활용한 공동주택 공사비 예측에 관한 연구)

  • Nan, Jun;Choi, Jae-Woong;Choi, Hyemi;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.68-76
    • /
    • 2014
  • The accurate estimation of construction cost is important to a successful development in construction projects. In previous studies, the construction cost are estimated by statistical methods. Among the statistical methods, support vector regression (SVR) has attracted a lot of attentions because of the generalization ability in the field of cost estimation. However, despite the simplicity of the parameter to be adjusted, it is not easy to find optimal parameters. Therefore, to build an effective SVR model, SVR's parameters must be set properly without additional data handling loads. So this study proposes a novel approach, known as genetic algorithm (GA), which searches SVR's optimal parameters, then adopt the parameters to the SVR model for estimating cost in the early stage of apartment housing projects. The aim of this study is to propose a GA-SVR model and examine the feasibility in cost estimation by comparing with multiple regression analysis (MRA). The experimental results demonstrate the estimating performance based on the percentage of estimations within 25% and find it can effectively do the accurate estimation without through the trial and error process.

The Economic Analysis of Underground Parking Lot Frames adopting 8-Bay Parking Modules (8-Bay 주차모듈을 적용한 아파트 지하주차장 구조의 경제성 분석)

  • Yu, Yongsin;Yoon, Bohyung;Kim, Minsu;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.52-61
    • /
    • 2019
  • On 30 June, 2017, the Ministry of Land, Infrastructure, and Transport announced the minimum size of parking section will be expanded in parking lots. The expansion of parking section could lead to increase in apartment prices because of increase in total area of the parking lots. It is necessary to adjust the column spacing and number in the parking lots and to apply the 8-Bay long-span parking module with good parking efficiency. According to the study, the construction cost of the 6-Bay module and 8-Bay module was almost the same. But The 8-Bay module was more economical than the 6-Bay module because of the reduction in total area of 8-Bay multi-moduel. The Result of construction cost of 8-Bay modules, Removal Deck-plate RC system was most economical. While the construction cost of PC system was higher due to increase in volume of the member, it would ensure sufficient economy by reducing the girder height to apply a pre-stress method. Also, the construction cost of hollow slab system was the highest. But it could be used as the underground parking lots for apartment, because it had the lowest cost per square meter. This Study has a academic significance by proving the applicability of the 8-Bay Module to underground parking lot of apartment. And it is expected that this study will be used as basic data to derive optimal construction method that applies 8-Bay Module.

Constructability Assessment Model for International Construction Projects Using Structural Equation (구조방정식을 활용한 해외건설 프로젝트 시공성 평가 모델)

  • Lee, Yong Wook;Lee, Sang-Ku;Jang, Woosik;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.941-951
    • /
    • 2015
  • In the recent years, Korean construction companies have been awarded 680 billion USD in the oversea projects which lead to a successful quantitative growth. However, due to the lack of capability in the core technology and project management compared to the leading companies, in addition to low-price bidding, massive deficit projects have caused problems to the companies. In order to overcome the limitations of the lack of capabilities, the term constructability has been researched recently by developed countries to apply in the practical use. The concept of constructability must be applied for Korean companies to compete in the EPC construction projects. The term constructability is defined as the factor that affect the overall construction process of a project which is defined by the ease of construction and to secure the project quality. Therefore, this study aims to develop a constructability assessment model using the structural equation to assess the factors that affect the constructability in the design and construction stage. The purpose of using the structural equation is to analyze the direct and indirect correlation between each factor that affects the international construction projects. Total of 8 latent variables and 34 measured variables are derived through literature review, corporate reports, experts' interview and surveys. The result of the model suggests the constructability factors that are to be managed the most efficiently to reduce cost, time and improve the quality as well as a countermeasure strategy to successfully execute the target international construction projects.

Curing Method Designation System in Mat Foundation Construction (매트기초 건설을 위한 양생방법 선정시스템)

  • Lee, Tae-Gyu
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.366-372
    • /
    • 2012
  • In most of construction work, especially mat foundation construction, it is very important that accidents be prevented at early aged construction stage. To reduce the risk of accidents, it is necessary to choose the curing method to provide instructions for safety forming work by proper curing of concrete after placing. Therefore, this paper has proposed a designation algorithm of curing method for representing curing type and period by analyzing the transient hydration heat solution, focusing on mat foundation construction. This has been implemented, moreover, using an object oriented programming language to develop structural analysis system taking account crack index. In addition, we present in this paper a safety curing management system developed to assess risk during forming work.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method (사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축)

  • Kim, Min-Ji;Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.42-52
    • /
    • 2013
  • The aim of this study is to present a prediction model of construction cost for a bridge that has a high reliability using historical data from the planning phase based on a CBR (Case-Based Reasoning) method in order to overcome limitations of existing construction cost prediction methods, which is linearly estimated. To do this, a reasoning model of bridge construction cost by a spreadsheet template was suggested using complexly both CBR and GA (Genetic Algorithm). Besides, this study performed a case study to verify the suggested cost reasoning model for bridge construction projects. Measuring efficiency for a result of the case study was 8.69% on average. Since accuracy of the suggested prediction cost is relatively high compared to the other analysis methods for a prediction of construction cost, reliability of the suggested model was secured. In the case that information for detailed specifications of each bridge type in an initial design phase is difficult to be collected, the suggested model is able to predict the bridge construction cost within the minimized measuring efficiency with only the representative specifications for bridges as an improved correction method. Therefore, it is expected that the model will be used to estimate a reasonable construction cost for a bridge project.

Study of Cost-effectiveness analyses of polluted-river sediments dredging (하천 오니토 준설에 대한 편익산정 방법 연구)

  • Kwon, Yoon Jeong;Lee, Yealin;Lee, Kangwook;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.460-460
    • /
    • 2021
  • 각종 오염물질이 수계로 유입되어 침강하면 하상에 퇴적되는데 이 오염된 퇴적물 중 질퍽한 콜로이드상의 물질을 오니토라 일컫는다. 이 오염물은 저장소 및 물환경의 변화에 따라 수질 악화의 직접적인 원인이 될 수 있는 인, 질소 등의 영양염류를 수중으로 재용출시킬 수 있는 비점오염원 종류 중 하나이다. 하천 준설은 하천에서 저수용량 확보와 하상 유지관리 및 골재확보, 수질 개선을 위해 토사를 제거하고 그 토사를 운반선에 의하여 운반하여 지정된 투기장에 투기하는 일련의 공사를 말하며, 이를 통하여 비점오염원인 오니토를 직접적으로 제거할 수 있다. 준설의 필요성 판단 및 수질개선 효과를 모니터하기 위해서는 하천의 수질과 유량을 조사해야 한다. 이때 대상구간이 요구하는 수질 기준에 부합하지 않으면 오염퇴적물 준설 기준을 통해 준설이 필요한 구간 및 사업량을 결정한다. 준설 사업량의 경제적 타당성을 정량적으로 검증하기 위해 대상 구간을 준설을 하지 않을 시 오니토가 상시 용출된다는 가정하에 물재생시설로 이 오염물을 정화했을 때의 비용을 준설 사업비와 비교하였다. 본 연구에서는 하천공사 표준시방서(2007)에 제시된 오염퇴적물 준설 기준을 만족하는 서낙동강수계의 준설 계획 지구에 대한 계획 사업비와 해당 지구 하류에 위치한 물재생시설의 정화능력 및 운영비를 비교해 하천 준설 사업비에 대한 편익을 산정하였다.

  • PDF

공동주택에 있어서 중앙식과 개별식 가스난방의 경제적 특성에 관한 연구

  • 홍도유
    • 월간 기계설비
    • /
    • s.41
    • /
    • pp.64-79
    • /
    • 1993
  • 본 논문에서는 도시공해 방지를 위해 도시가스를 연료로 사용하는 경우 거주자의 생활수준이나 단지의 밀도 및 난방부하 설정등에 다소 차이는 있으나 소규모 고층 아파트(공동주택)의 난방방식중 중앙난방 방식과 개별난방 방식의 초기시설비, 연료비, 시설관리비의 경제성을 검토하고 난방 시스템의 지침을 제시하였다. 전체 공사비(초기투자비)는 개별난방 방식이 중앙난방 방식보다 약 2$\%$정도 절감되었다. 난방비와 시설관리에 따른 인건비 면에서도 난방의 경우 개별난방 방식이 중앙난방 방식에 비하여 난방과 하절기 온수만을 별도로 사용하는 경우 개별난방 방식이 중앙난방 방식보다 난방비가 9$\%$정도 더 들었으며, 시설관리 인건비 면에서는 중앙난방 방식보다 개별난방 방식이 66.7$\%$ 적게 들었다. 전체적으로 중앙난방 방식보다 개별난방 방식이 초기투자비 및 유지관리 면에서 경제성이 우수함이 확인되었다.

  • PDF

An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective (장기적 관점에서의 모듈러 주택 공사비 절감기회 분석)

  • Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.124-134
    • /
    • 2018
  • Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.