• Title/Summary/Keyword: 갱구부

Search Result 60, Processing Time 0.02 seconds

Seismic Analysis of Tunnel in Transverse Direction Part II: Evaluation of Seismic Tunnel Response via Dynamic Analysis (터널 횡방향 지진해석 Part II: 동적해석을 통한 터널의 지진응답 예측)

  • Park, Du-Hee;Shin, Jong-Ho;Yun, Se-Ung
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.6
    • /
    • pp.71-85
    • /
    • 2010
  • Dynamic analyses of tunnels are widely performed in practice in Korea. Accurate performance of a dynamic analysis is very difficult, requiring appropriate application of lower and lateral boundary conditions, deconvolution, constitutive model, and selection of dynamic soil properties etc. Lack of a systematic guideline on how to perform the dynamic analysis makes it even more difficult to perform an analysis. In addition, dynamic analyses are not needed in most cases and pseudo-static analyses are more than adequate. However, they are performed without a clear understanding on the need for the dynamic analysis and differences between the two methods. In this study, firstly, a guideline for correctly performing a 2D dynamic analysis is developed. Secondly, the differences in the tunnel responses using dynamic and pseudo-static analyses are discussed and compared. The results show that the discrepancies between the dynamic and static analyses are not significant for most cases. It is therefore recommended that the dynamic analyses be performed at tunnel portal, very soft ground, or in cases where spatial variation of the ground motion needs to be considered in the seismic analysis of tunnels in transverse direction.

Application of Geophysical Survey for Detecting the Skarn Ore Deposit (스카른광체를 탐지하기 위한 물리탐사 적용)

  • Park, Chung-Hwa;Jung, Yeon-Ho;Lee, Yong-Dong;Park, Jong-Oh
    • The Journal of Engineering Geology
    • /
    • v.20 no.1
    • /
    • pp.71-78
    • /
    • 2010
  • The Gagok mine is a contact metasomatic deposit, located at Gagok-myeon, Samcheok city and Cheoram-dong, Taebaek city, Gangwon province. The deposit lies within the limestone of Myobong and Pungchon formations, and exists the contact of intrusive granite porphyry. In order to determine the direction and extension of mineralization in the gallery and around the entrance of the ore deposit, we used the ground magnetic survey, the direct current (dc) resistivity survey using dipole-dipole array, and resistivity tomography survey. The ground magnetic survey did not detect the anomalous zone due to ore deposit, while the dc resistivity survey and resistivity tomography survey were successful in delineating the anomalous zone related to the extension of fault toward $N50^{\circ}W$.

국내 가행광산 채굴적 활용 방안

  • 윤철헌
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.11a
    • /
    • pp.213-234
    • /
    • 2002
  • 우리 나라는 70년대까지 광업은 부흥하였으나, 그 이후 급속히 위축되면서 80년대 이후 거의 대부분 광산들이 폐광 또는 휴광된 실정이다. 그 결과 현재 전국 각지에 다수의 폐갱도가 존재하게 되었으며, 이제는 지반침하 및 각종 침출수의 원인자로 간주될 정도이다. 최근 지자체에서는 이런 폐갱도를 지역 자원으로서 가치를 인정하고 지역 활성화를 위해 재 이용하려는 움직임이 보이고 있는데, 구체적으로는 관광시설, 연구시설, 농업생산시설, 저장시설, 폐기물처리시설 등이다. 일본은 폐광된 금속광산 재활용을 위해 입지여건과 주변지역, 입갱 가능성 등 기초조사를 하였다. 조사결과 폐갱도의 문제점으로 입갱이 가능한 광산이 적다는 점을 들 수 있다. 대부분의 광산은 갱구가 함몰되었거나, 갱내에 지하수가 차 있어 접근이 불가능한 경우가 대부분이다. 비교적 양호한 암반 경우는 서브 레벨 스토핑, 잔주, 주방식 등의 채굴법에 의해 대규모 공동이 잔존하고 있는 경우도 있지만 그리 많지 않았다. 폐광된 광산 재활용 여건은 우리 나라와 일본이 대동소이 경우로 현실적으로 활용이 가능한 폐광은 많지 않으며 활용코자 할 때에는 기존갱도를 활용하면서 암반이 견고한 곳에 새로운 갱도를 설치하여야 한다. 그러나 몇몇 곳에서는 매우 유용하게 잘 활용되고 있는 곳도 있고, 연구 검토하면 충분한 활용성이 있다고 생각되는 곳도 있다. 그러므로 현재의 상황을 보고 판단할 것이 아니라, 활용기술과 접목해서 활용성을 검토함으로써 불용 자산의 유용화 방안이 검토되어야 할 것이다. 현재 가행중인 광산은 입지여건 및 암반이 양호하고, 대형갱도를 굴착하는 석회석광산 등을 선택하여 폐광 후 활용이 가능토록 채광기술 발전시켜 나가야 하며, 인간 중심적인 시설 또는 산물 중심적인 시설로 구분하여 폐광 후 복구비용을 우선 지원하는 방식 등을 통하여 시추, 탐광굴진, 현대화, 수갱굴착, 자금융자 등을 지원하는 우리 공사와 산업자원부가 지자체, 산림청, 건교부, 농림부 등과 연계하여 종합적인 지원육성책을 마련하여야 할 것이다. 결과적으로, 지방자치단체 등에서 관심을 갖고 있는 저장시설, 폐기물처리시설, 관광시설, 농업생산시설, 연구시설 등을 중심으로 '광산 채굴적을 미래에 어떻게 활용한 것인가'를 선진외국 사례를 벤치마킹하고, 연구ㆍ검토하여 친환경적인 광산개발이 되도록 기본적인 방향과 개념을 갖도록 하여 관련 정책을 계획적이고, 체계적으로 수립 일관성 있게 추진해 나가야 할 것이다.

  • PDF

A Case Study of Soil-Cement Fill for Tunneling (소일시멘트 복토후 터널굴착에 대한 사례 연구)

  • Shin Il-Jae;Kang Jun-Ho;Suh Young-Ho
    • Tunnel and Underground Space
    • /
    • v.15 no.5 s.58
    • /
    • pp.359-368
    • /
    • 2005
  • In case the overburden of a tunnel is too low to adopt NATM, cut and cover method generally can be chosen as alternative. However, in tunneling some area with very low or no overburden between two mountains, the cut and cover method requires additional construction of a couple of tunnel portals and the maintenance of portal slopes until backfilling is completed. As a solution for this problem, increasing the tunnel overburden by raising the ground level can be effective. This paper presents the case study for tunneling at C240 site in Taiwan High Speed Railway(THSR) in which soil-cement filling method was used for pre-banking before tunnel excavation. Cement content of filling material was $2\~4\%$ and thickness of filling a round was $130\~250\;mm$. The stability evaluation for the soil-cement slope and concrete lining of low cover tunnel was conducted by numerical analysis.

The Lateral Earth Pressure Distribution of the Earth Retaining Structure Installed in Colluvial Soil (붕적토에 설치된 흙막이구조물의 측방토압분포)

  • Hong, Won-Pyo;Yea, Geu-Guwen
    • The Journal of Engineering Geology
    • /
    • v.18 no.4
    • /
    • pp.433-437
    • /
    • 2008
  • It's essential to build an earth retaining structure at the beginning and end point of a tunnel constructed in a colluvium area. A large scale of colluvial soil may cause a problem to the stability of the excavation ground. An excavation in colluvium has different behavior characteristics from those in a sandy soil due to unstable elements and needs counter measures for it. There are few systematic research efforts on the behavior characteristics of an earth retaining structure installed in colluvial soil. Thus this study set out to collect measuring data from an excavation site at the tunnel pit mouth in colluvium and set quantitative criteria for the safety of an earth retaining structure. After comparing and analyzing the theoretical and empirical earth pressure from the measuring data, the lateral earth pressure distribution acted on the earth retaining wall was suggested.

The High-speed train model for reducing the micro-pressure wave in railway tunnel (고속철도 터널에서의 미기압파 저감을 위한 모형실험)

  • Jang, Yong-Jun;Park, Won-Hee;Kim, Seung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1330-1336
    • /
    • 2007
  • The purpose of the study was to verify deduction of each coefficient necessary to analysis on micro-pressure waves and reliability of the analysis result. The tunnel running train model testing device used in the test was manufactured by scale of 1:60 and the study used a train model with ten cars long according to specifications of KTX model. The study applied tunnels with cross sections of $107.9m^3\;and\;95.1m^3$ and applied tunnel extensions with 1km, 0.75km and 0.5km. Also, the study tested train speed by changing it into 275, 300, 325 and 350km/h. The test device was a hydraulic launch system composed of a train model, a hydraulic launcher, a tunnel model and a brake. The study measured speed of a model trainby a speed sensor installed in the point of each 1.2m from the front of tunnel entrance and a pithead of tunnel exit and measured pressure change of internal tunnel continuously by installing pressure sensors in the entrance part of tunnel, in the middle part of tunnel and in the exit part of tunnel. As the result of the measurement, it was known that pressure slope of pressure wave happened in the entrance part of tunnel was increased by a nonlinear effect while spreading the tunnel or its pressure slope was reduced by diffusion. Also, the study compared and analyzed micro-pressure waves happened in the exit part of the tunnel by installing each kind of hoods in the entrance part of the tunnel to prevent reduction of micro-pressure waves.

  • PDF

A study on the state of the art on the construction and the new technology of the underground structure(underpass, underground passageways) (지하구조물(지하차도, 지하통로)건설 현황 및 관련 신기술 개발동향 연구)

  • Kim, Hyung-Tae;Han, Man-Yop;Son, Yeun-Jin;Han, Rok-Hee;Jeong, Ji-Man
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.891-894
    • /
    • 2008
  • This study was performed to investigate how to design, where to construct, why to degrade, what plan to use systematically the underground structures such as underpass, underground passageways. About 50% of the underground structures are located on Seoul, Kyungi-Do. In design of the underground structures such as underpass, underground passageways, the required conditions are defined. And also in construction stage, the conditions of soil, required structure depth, site characteristics, reasonable construction method, are investigated. In the selection of details for underground structure, the items mainly considered, are the wall and column type, the sidewalk type, anchoring-system type, the water-proofing method, entranc shape. The reason and the adequate measures for the degradation of concrete structure are also investigated. The initial cracking properties due to the thermal characteristic are considered. The state of the art report on the new technologies are reviewed. The recent project for the systematically application to the underground structures is reviewed.

  • PDF

Geochemical and Mineralogical Characterization of Arsenic-Contaminated Soil at Chonam Gold Mine, Gwangyang (광양 초남 금 광산 비소오염 토양의 지화학적 및 광물학적 특성)

  • Kong, Mi-Hye;Kim, Yu-Mi;Roh, Yul
    • Economic and Environmental Geology
    • /
    • v.44 no.3
    • /
    • pp.203-215
    • /
    • 2011
  • Geochemical and mineralogical properties of a contamited soil should be taken into account to decide a remediation strategy for a given contaminant because development and optimization of soil remedial technologies are based on geochemical and mineralogical separation techniques. The objective of this study was to investigate the geochemical and mineralogical characteristics of arsenic-contaminated soils. The arsenic-contaminated soil samples were obtained from Chonam gold mine, Gwangyang, Chonnam, Particle size analysis, sequential extraction, and mineralogical analyses were used to characterize geochemical and mineralogical characteristics of the As-contaminated soils. Particle size analyses of the As-contaminated soils showed the soils contained 17-36% sand, 25-54% silt, 9-28% clay and the soil texture were sandy loam, loam, and silt loam. The soil pH ranged from 4.5 to 6.6. The amount of arsenic concentrations from the sequential soil leaching is mainly associated with iron oxides (1 to 75%) and residuals (12 to 91%). Major minerals of sand and silt fractions in the soils were feldspar, kaolinite, mica, and quartz and minor mineral of which is an iron oxide. Major minerals of clay fraction were composed of illite, kaolinite, quartz, and vermiculite. And minor minerals are iron oxide and rutile. The geochemical and mineralogical analyses indicated the arsenic is adsorbed or coprecipitated with iron oxides or phyllosilicate minerals. The results may provide understanding of geochemical and mineralogical characteristics for the site remediation of arsenic-contaminated soils.

Reinforcing Effects around Face of Soil-Tunnel by Crown & Face-Reinforcing - Large Scale Model Testing (천단 및 막장면 수평보강에 의한 토사터널 보강효과 - 실대형실험)

  • Kwon Oh-Yeob;Choi Yong-Ki;Woo Sang-Baik;Shin Jong-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.6
    • /
    • pp.71-82
    • /
    • 2006
  • One of the most popular pre-reinforcement methods of tunnel heading in cohesionless soils would be the fore-polling of grouted pipes, known as RPUM (reinforced protective umbrella method) or UAM (umbrella arch method). This technique allows safe excavation even in poor ground conditions by creating longitudinal arch parallel to the tunnel axis as the tunnel advances. Some previous studies on the reinforcing effects have been performed using numerical methods and/or laboratory-based small scale model tests. The complexity of boundary conditions imposes difficulties in representing the tunnelling procedure in laboratory tests and theoretical approaches. Full-scale study to identify reinforcing effects of the tunnel heading has rarely been carried out so far. In this study, a large scale model testing for a tunnel in granular soils was performed. Reinforcing patterns considered are four cases, Non-Reinforced, Crown-Reinforced, Crown & Face-Reinforced, and Face-Reinforced. The behavior of ground and pipes as reinforcing member were fully measured as the surcharge pressure applied. The influences of reinforcing pattern, pipe length, and face reinforcement were investigated in terms of stress and displacement. It is revealed that only the Face-Reinforced has decreased sufficiently both vertical settlement in tunnel heading and horizontal displacement on the face. Vertical stresses along the tunnel axis were concentrated in tunnel heading from the test results, so the heading should be reinforced before tunnel advancing. Most of maximum axial forces and bending moments for Crown-reinforced were measured at 0.75D from the face. Also it should be recommended that the minimum length of the pipe is more than l.0D for crown reinforcement.

"동의보감(東醫寶鑑)"의 양명병(陽明病) 개념(槪念)에 대한 소고(小考) -천석(淺析)"동의보감(東醫寶鑑)"당중유관양명병적개념(當中有關陽明病的槪念)-

  • Lee, Ju-Hye;Lee, Seon-Ran;Lee, Yong-Beom
    • Journal of Korean Medical classics
    • /
    • v.18 no.1 s.28
    • /
    • pp.67-72
    • /
    • 2005
  • 통과분석(通過分析)${\ulcorner}$동의보감(東醫寶鑑)${\lrcorner}$양명형증용약여포괄중경적(陽明形證用藥?包括仲景的)${\ulcorner}$상한론(傷寒論)${\lrcorner}$재내적주요의학가대양명병적개념(在內的主要醫學家對陽明病的槪念), 득출여하결론(得出如下結論): 1.${\ulcorner}$동의보감(東醫寶鑑)${\lrcorner}$적양명형증용약당중이대편비결위중심, 미사용가이낭괄양명병증재내적위가실저개개념, 상세나열출양명병적구체증상 내급양명병하료정의(來給陽明病下了定義). 병미장대편비결작위대표성증상(幷未將大便秘結作爲代表性症狀), 이시근거표본관계분성경병여부병진행설명. 이기육작위표(以肌肉作爲表), 위작위리적표리개염분석기증상(胃作爲裏的表裏槪念分析其症狀). 2. 기찰급양명병하정의적의서(畿察給陽明病下定義的醫書), 발현제료중경적(發現除了仲景的)${\ulcorner}$상한론(傷寒論)${\lrcorner}$여기주석본성무이적${\ulcorner}$주해상한론(注解傷寒論)${\lrcorner}$이외(以外), 도장목동(都將目疼), 비건(鼻乾), 불득면부간주양명병대표증상(不得眠部看做陽明病代表症狀). 저충정의방식시종송도명대적보편관점 3. 재(在)${\ulcorner}$동의보감(東醫寶鑑)${\lrcorner}$당중작위인용서목적${\lrcorner}$의학입문(醫學入門)${\ulcorner}$, 근거표본(根据標本), 표리개염대증상진행료분류(表裏槪念對症狀進行了分類). 비기지전단순적대증상적서술갱구유조리성. 저가이간주시집당시제다견해지대성(這可以看做是集當時諸多見解之大成), 대병정적분석변적갱가구체. 선택(選擇)${\lrcorner}$의학입문(醫學入門)${\ulcorner}$작위인체서목(作爲引滯書目), 가이인위시채납료당시적최신견해, 병차흡수료용역장악병정적이증상위주적기술방식(幷且吸收了容易掌握病情的以症狀爲主的記述方式). ${\lrcorner}$의학입문(醫學入門)${\ulcorner}$취시집이상관점위일체적대성(就是集以上觀点爲一體的大成). 4. 여태양병당중양형증용약진행비교, 관찰병정적주요관점(觀察病情的主要觀点), 양자도추종료(兩者都追從了)${\lrcorner}$의학입문(醫學入門)${\ulcorner}$적견해(的見解). 단시태양형증용약몰유대몰위초출중경태양병적제망(但是太陽形證用藥沒有大沒圍超出仲景太陽病的提網), 상비지하양명형증용약기몰유인용(相比之下陽明形證用藥旣沒有引用) 중경적(仲景的)${\ulcorner}$상한론(傷寒論)${\lrcorner}$, 대증상적설명야대상경정(對症狀的設明也大相徑庭). 5. 양명형증용약당중몰유인용중경적위가실관점, 이시리용미악한(而是利用微惡寒), 발열(發熱), 갈(渴), 유한(有汗), 목동(目疼), 비건(鼻乾), 조한(潮汗), 폐삽(閉澁), 만갈(滿渴), 광섬, 불면등증상진행설명(不眠等症狀進行說明), 비기장악륭명병작위장부질병(比其掌握隆明病作爲臟腑疾病), 이해위이열위주적상당우양명속성적질병.

  • PDF