Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.422-427
/
2001
There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.175-187
/
2013
Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.
Journal of the Korea Institute of Building Construction
/
v.22
no.2
/
pp.195-205
/
2022
This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.
Korean Journal of Construction Engineering and Management
/
v.14
no.4
/
pp.164-171
/
2013
In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.
소프트웨어 기술의 생명주기가 점점 짧아지고 복잡해짐에 따라 그 기술을 이해하기가 힘들어 진다. 객체지향 기술채택을 더욱 잘 이해하는 것이 이 논문의 연구동기이다. 객체지향 기술이 전통적인 소프트웨어 프로세스 기술에 대한 새로운 패러다임이기 때문에 프로세스 중심의 구조지향 기술과 같은 기존의 소프트웨어 엔지니어링의 경험에 영향을 받을 수 있다. 본 연구의 목적은 이전의 구조지향 기술의 경험과 기술변화에 대한 개인적인 인식이 미국 기업체에서 객체지향 기술채택에 어떻게 영향을 미치는지를 실제로 조사하는데 있다. 2 X 2 유사 실험계획법이 사용되었다. 구조지향 방법을 사용한 경험과 새로운 기술에 대한 개인적 혁신정도(Personal Innovativeness)가 독립변수로, 객체지향 방법에 대한 사용편이성(Ease of Use)과 유용성(Usefulness)이 종속변수로 선정되었다. 데이터는 구조지향 방법과 객체지향 방법을 모두 사용한 경험이 있는 자료처리 및 관리협회(DPMA: Data Processing and Management Association)에 소속된 정보 시스템 전문가로부터 수집되었다. 연구결과는 구조지향 방법을 사용한 경험은 객체지향 방법의 사용편이성과 유용성에 영향을 주지만 개인적 혁신성은 영향을 주지 않는 것으로 나타났다. 과거의 구조지향 방법을 많이 사용하면 할수록 객체지향 방법의 사용편이성 값이 낮게 나타나기 때문에 이전 문헌에서 제시된 구조지향 방법의 객체지향 방법에 대한 지식간섭(Knowledge Interference) 현상이 있음을 실증적으로 보여주었다 마지막에는 본 연구의 한계점과 향후 연구에서 지식간섭을 줄일 수 있는 방안을 제시하였다.
Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.738-743
/
2008
Recently BIM is utilized to improve productivity for Life Cycle Cost of construction projects. Therefore, the establishment of BIM process by each construction project is a necessary element. However, cases and the pertinent researches that BIM process by each project is established are still not enough in Korea. The study proposed construction of BIM process through how to set up BIM application, how to organize a BIM team, how to set up a family and modeling method in the early stage. To achieve the purpose, the study examined application ability of BIM process by carrying out basic setting and modeling work through pilot study model, examination of the amount of materials and information interchange with IFC. The study attempted making a foundation of domestic BIM guideline construction through the above examination.
Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
Korean Journal of Construction Engineering and Management
/
v.13
no.2
/
pp.11-24
/
2012
Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.
Korean Journal of Construction Engineering and Management
/
v.13
no.5
/
pp.45-52
/
2012
Recently, BIM is used at several areas actively because of introduction of BIM in the construction industry. In particular, the recent many studies on activation of BIM information sharing is underway and it is the future direction of BIM. Moreover, it should be clearly realized. In the BIM levels of domestic construction phase, Interference Review, calculating volume estimates in part based on the active research is underway. However, still interested in reviewing building codes have relatively little interest. As BIM enabled, The methods of reviewing building codes should be transformed into a automated system by using information of BIM. In overseas, they are already using diverse softwares for reviewing modeling. Thus, For an automatic review of building regulations research is needed. this study is research on the development Domestic building codes as an automatic review process by using BIM. In order to Automatic review of the current building regulations by using BIM, this study analyzes the characteristics of each piece of information.
The life cycle of new information technologies is getting shorter, and the technologies are becoming more complex and difficult to understand. The need to better understand adoption of object orientation motivates this paper. Adoption of object orientation should certainly be influenced by prior software process technologies, such as the process-oriented structured methods, because object orientation is considered to be a paradigm shift from conventional software process technologies. This study aims to empirically analyze knowledge interference of the structured methods with object orientation. A two factorial quasi-experimental design is set forth. The period of experience using the structured methods and the period of experience using object orientation are selected as two independent variables, and the perceived ease of use is chosen as one dependent variable. Data are gathered from active members of Data Processing Management Association (DPMA), who have experiences in using both the structured methods and object orientation. The final results empirically show that previous experience using the structured methods negatively influences the perception of using object orientation that is one of critical factors to technology adoption. It is suggested here that a future study dealing with the same research topic in other countries will provide new insights about comparative studies.
Journal of the Korea Institute of Building Construction
/
v.14
no.6
/
pp.561-569
/
2014
In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.