A Study of Improving Construction Process by Work Structuring (Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구)

  • Na Kyung-Chul;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-427
    • /
    • 2001
  • There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.

  • PDF

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

The Affecting Factos on the Adoption of Object-Oriented Computing : The Case of Programming Experience and Personal Innovativeness (객체지향 컴퓨팅 채택에 미치는 영향요인 : 프로그래밍 경험과 개인혁신성의 경우)

  • Kim, Injai
    • The Journal of Information Systems
    • /
    • v.10 no.1
    • /
    • pp.243-255
    • /
    • 2001
  • 소프트웨어 기술의 생명주기가 점점 짧아지고 복잡해짐에 따라 그 기술을 이해하기가 힘들어 진다. 객체지향 기술채택을 더욱 잘 이해하는 것이 이 논문의 연구동기이다. 객체지향 기술이 전통적인 소프트웨어 프로세스 기술에 대한 새로운 패러다임이기 때문에 프로세스 중심의 구조지향 기술과 같은 기존의 소프트웨어 엔지니어링의 경험에 영향을 받을 수 있다. 본 연구의 목적은 이전의 구조지향 기술의 경험과 기술변화에 대한 개인적인 인식이 미국 기업체에서 객체지향 기술채택에 어떻게 영향을 미치는지를 실제로 조사하는데 있다. 2 X 2 유사 실험계획법이 사용되었다. 구조지향 방법을 사용한 경험과 새로운 기술에 대한 개인적 혁신정도(Personal Innovativeness)가 독립변수로, 객체지향 방법에 대한 사용편이성(Ease of Use)과 유용성(Usefulness)이 종속변수로 선정되었다. 데이터는 구조지향 방법과 객체지향 방법을 모두 사용한 경험이 있는 자료처리 및 관리협회(DPMA: Data Processing and Management Association)에 소속된 정보 시스템 전문가로부터 수집되었다. 연구결과는 구조지향 방법을 사용한 경험은 객체지향 방법의 사용편이성과 유용성에 영향을 주지만 개인적 혁신성은 영향을 주지 않는 것으로 나타났다. 과거의 구조지향 방법을 많이 사용하면 할수록 객체지향 방법의 사용편이성 값이 낮게 나타나기 때문에 이전 문헌에서 제시된 구조지향 방법의 객체지향 방법에 대한 지식간섭(Knowledge Interference) 현상이 있음을 실증적으로 보여주었다 마지막에는 본 연구의 한계점과 향후 연구에서 지식간섭을 줄일 수 있는 방안을 제시하였다.

  • PDF

A Study on the Development of the BIM Process for Improvement of the BIM Application Ability of the Construction Industry (건설산업의 BIM 적용능력 제고를 위한 BIM 프로세스 개발에 관한 연구)

  • Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.738-743
    • /
    • 2008
  • Recently BIM is utilized to improve productivity for Life Cycle Cost of construction projects. Therefore, the establishment of BIM process by each construction project is a necessary element. However, cases and the pertinent researches that BIM process by each project is established are still not enough in Korea. The study proposed construction of BIM process through how to set up BIM application, how to organize a BIM team, how to set up a family and modeling method in the early stage. To achieve the purpose, the study examined application ability of BIM process by carrying out basic setting and modeling work through pilot study model, examination of the amount of materials and information interchange with IFC. The study attempted making a foundation of domestic BIM guideline construction through the above examination.

  • PDF

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

A Basic Study on Review the Classification System and the Process of BIM Information for an Automatic Review of Building Code (건축법규 자동검토를 위한 BIM정보의 분류체계 검토 및 프로세스에 관한 기초연구)

  • Lee, Chang-Yoon;Shim, Un-Jun;Ahn, Yong-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.45-52
    • /
    • 2012
  • Recently, BIM is used at several areas actively because of introduction of BIM in the construction industry. In particular, the recent many studies on activation of BIM information sharing is underway and it is the future direction of BIM. Moreover, it should be clearly realized. In the BIM levels of domestic construction phase, Interference Review, calculating volume estimates in part based on the active research is underway. However, still interested in reviewing building codes have relatively little interest. As BIM enabled, The methods of reviewing building codes should be transformed into a automated system by using information of BIM. In overseas, they are already using diverse softwares for reviewing modeling. Thus, For an automatic review of building regulations research is needed. this study is research on the development Domestic building codes as an automatic review process by using BIM. In order to Automatic review of the current building regulations by using BIM, this study analyzes the characteristics of each piece of information.

The Effects Of Structured Methods On Object Orientation : A Knowledge Interference Prospective (구조지향 방법론이 객체지향 방법론에 미치는 영향 : 지식간섭의 관점에서)

  • Kim, In-Jai;Jeong, Duke-Hoon
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.859-864
    • /
    • 2002
  • The life cycle of new information technologies is getting shorter, and the technologies are becoming more complex and difficult to understand. The need to better understand adoption of object orientation motivates this paper. Adoption of object orientation should certainly be influenced by prior software process technologies, such as the process-oriented structured methods, because object orientation is considered to be a paradigm shift from conventional software process technologies. This study aims to empirically analyze knowledge interference of the structured methods with object orientation. A two factorial quasi-experimental design is set forth. The period of experience using the structured methods and the period of experience using object orientation are selected as two independent variables, and the perceived ease of use is chosen as one dependent variable. Data are gathered from active members of Data Processing Management Association (DPMA), who have experiences in using both the structured methods and object orientation. The final results empirically show that previous experience using the structured methods negatively influences the perception of using object orientation that is one of critical factors to technology adoption. It is suggested here that a future study dealing with the same research topic in other countries will provide new insights about comparative studies.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.