Browse > Article
http://dx.doi.org/10.6106/KJCEM.2013.14.5.175

4D BIM based Workspace Planning Process in Building Construction Project  

Choi, Byungjoo (서울대학교 대학원 건축학과)
Lee, Hyun-Soo (서울대학교 건축학과)
Park, Moonseo (서울대학교 건축학과)
Kim, Hyunsoo (서울대학교 대학원 건축학과)
Hwang, Sungjoo (서울대학교 대학원 건축학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.5, 2013 , pp. 175-187 More about this Journal
Abstract
Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.
Keywords
Workspace Planning; Space Scheduling; Workspace Conflict; 4D Building Information Model(4D BIM);
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Winch, G. M., and North, S. (2006). "Critical space analysis." Journal of Construction Engineering and Management, ASCE, 132(5), pp. 473-481   DOI   ScienceOn
2 Chua, D., Yeoh, K., and Song, Y. (2010). "Quantification of Spatial Temporal Congestion in Four - Dimensional Computer-Aided Design." Journal of Construction Engineering and Management, ASCE, 136(6), pp. 641-649   DOI   ScienceOn
3 Dawood, N. and Z. Mallasi (2006). "Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies." Computer-Aided Civil and Infrastructure Engineering, 21(7), pp. 498-513   DOI   ScienceOn
4 DeLoura, M.. A., Ahamd, A., Bilas, S., Boer, J., Dietrich, S. and Dybsand, E., et al. (2000). Game programming germs, Charles River Media, Inc., USA, pp. 502-516
5 Eastman, C. Teicholz, P., Sacks, R., and Liston, K. (2008). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, John Whiley & Sons Inc., USA, pp. 25-64
6 Guo, S. J. (2002). "Identification and resolution of work space conflicts in building construction." Journal of Construction Engineering and Management, ASCE, 128(4), pp. 287-295   DOI   ScienceOn
7 Kelsey, J., Winch, G., and Penn, A. (2001). "Understanding the Project Planning Process: Requirements Capture for the Virtual Construction Site." University College London, UK, Bartlett Research
8 Mallasi, Z. (2006). "Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation." Automation in Construction, 15(5), pp. 640-655   DOI   ScienceOn
9 Moller T. and Haines E. (2002). Real time Rendering, 2nd ed., A K Peters, Ltd., USA, pp. 631-668
10 National BIM Standard-United States Version 2, National BIM Standard-United States Project Committee, (2013.06.10)
11 Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity Improvement in Construction, McGraw-Hill Inc, USA
12 Riley, D. R., and Sanvido, V. E. (1995). "Patterns of Construction-Space Use in Multistory Buildings." Journal of Construction Engineering and Management, ASCE, 121(4), pp. 464-473   DOI   ScienceOn
13 Akinci, B., Fischer, M., Levitt, R., and Carlson, R. (2002b). "Formalization and automation of time-space conflict analysis." Journal of Computing in Civil Engineering, ASCE, 16(2), pp. 124-134   DOI   ScienceOn
14 이현수.박길재.박문서.류한국 (2010). "고층 건축공사의 공간 활용을 위한 공정계획 모델", 대한건축학회 논문집, 제26권 제6호, pp. 129-138   과학기술학회마을
15 박문서.양영준.이현수.한상원.지세현 (2011). "건축물 마감공사 자재 배치 최적화 모델", 한국건설관리학회 논문집, 제12권 제1호, 한국건설관리학회, pp. 43-52   과학기술학회마을   DOI   ScienceOn
16 Akinci, B., Fischer, M. Kunz, J. and Levitt, R. (2002a). "Representing work spaces generically in construction method models." Journal of Construction Engineering and Management, ASCE, 128(4), pp. 296-305   DOI   ScienceOn
17 Akinci, B., Fischer, M., and Kunz, J. (2002c). "Automated Generation of Work Spaces Required by Construction Activities." Journal of Construction Engineering and Management, ASCE, 128(4), pp. 306-315   DOI   ScienceOn
18 Chau, K. W., Anson, M., and Zhang, J. P. (2004). "Four-Dimensional Visualization of Construction Scheduling and Site Utilization." Journal of Construction Engineering and Management, ASCE, 130(4), pp. 598-606   DOI
19 Chavada, R., Dawood, N. and Kassem, M. (2012). "Construction workspace management: the development and application of a novel nD planning approach and tool." Journal of Information Technology in Construction, 17, pp. 213-236
20 Riley, D. R., and Sanvido, V. E. (1997). "Space planning method for multistory building construction." Journal of Construction Engineering and Management, ASCE, 123(2), pp. 171-180   DOI   ScienceOn
21 Thabet, W. Y., and Beliveau, Y. J. (1994). "Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings." Journal of Construction Engineering and Management, ASCE, 120(1), pp. 96-116   DOI   ScienceOn
22 Tommelein, I. D., and Zouein, P. P. (1993). "Interactive Dynamic Layout Planning." Journal of Construction Engineering and Management, ASCE, 119(2), pp. 266-287   DOI   ScienceOn
23 Talmaki, S. and V. R. Kamat (2012). "Real-Time Hybrid Virtuality for Prevention of Excavation Related Utility Strikes." Journal of Computing in Civil Engineering, ASCE (On-line Published)