1 |
Seo, JH. A Collaborative Process of BIM-based Clash Detection for Constructability Review [masters thesis]. [Seoul (Korea)]: Hanyang University; 2012. 48 p.
|
2 |
Kim, HS. Revealing Issues and Prospects of Domestic Construction by Analysis of BIM Case Studies. Architectural Institute of Korea. 2010 Jan;54(1):65-9.
|
3 |
Shin, TH. Contractor for BIM Strategy Proposal. The Korea Institute of Building Construction. 2011 Apr;11(2):26-32.
|
4 |
Park, HT. Improving Constuctability Analysis of Construction Project using Building Information Modeling [masters thesis]. [Seoul(Korea)]:Chungang University; 2009. 69 p.
|
5 |
Oh, JW. A Study on the Constructability Concepts Apply to Construction Project in the Development Stage Plan [masters thesis]. [Gyeongsan(Korea)]:Yeungnam University; 2002. 102 p.
|
6 |
Virtu Almighty. Design guidelines apply to BIM : Three-dimensional Architectural design guidelines. 2012;p.62-63.
|
7 |
Jang, SJ. A Study on Cost Effect caused by Application of IT to Construction Management : Focused on Constructional Review using Building Information Model [masters thesis]. [Seoul(Korea)]:Yonsei University; 2009. 65 p.
|
8 |
Lee, HS. A Study on the BIM Construction Phase of Construction Projects Through the Effective Application Method Utilizes Case Studies [masters thesis]. [Gyeongsan(Korea)]:Kyungil University; 2013. 46 p.
|
9 |
Lee, HM. A Study on the BIM for Building Construction Information Integration System [doctorate thesis]. [Gwangju(Korea)]:Chonnam University; 2008. 130 p.
|
10 |
Seo, HC, Oh, JG, Kim, JJ. The Development of an Evaluation Model for the Work Environment of the BIM-based Architectural Design Firms. Architectural Institute of Korea : Planning. 2012 May;28(5):99-105.
과학기술학회마을
|
11 |
Choi, CH, Yun, SH, Hwang, GM, Jin, SY, Yun, SY. BIM Case Study : Sung Kwan Univi. Digital Library Project. Architectural Institute of Korea. 2008 Apr;52(4):66-68.
|
12 |
Bae, CW. A Study on Information Flow Model of BIM Application through the Construction Phase [masters thesis]. [Seoul(Korea)]: Hanyang University; 2009. 46 p.
|
13 |
Choi, SM. A Study on the Construction Management Applicability of BIM Techniques [masters thesis]. [Seoul(Korea)]:Konkuk University; 2011. 59 p.
|
14 |
Roh, HW. The Introduction and Spread of BIM Strategy POSCO ENC. Proceedings of the ArchiCAD based Korea.Japan BIM Conference; 2012 Dec 18; Seoul National University of Science and Technology, International conference room, the Korea Seoul: GRAPHISOFT, DoallTech Co; 2012. p.84
|
15 |
Kim, KC. A Study on Stepwise Application of BIM (Building Information Modeling) through Precedent Analyses [masters thesis]. [Seoul(Korea)]:Dongguk University; 2010. 94 p.
|
16 |
Nam, YH. Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects. In: Yeon, HJ. Hong, TH. Koo, KJ. Hyun, CT. Korea Institute of Construction Engineering and management. Proceedings of the 2014 Korea Institute of Construction Engineering and management annual conference; 2007 Nov 7-8; Seoul National University of Science and Technology, Techno-park, the Korea Seoul: 2007. p.531-4.
|