A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

Parametric Design Modeling Method for PC Production Simulation Using BIM (PC 생산 시뮬레이션 모델과 BIM 모델 간의 효율적 건물 부재 정보 교환을 위한 파라메트릭 디자인 모델링 기법)

  • Lee, WonSeok;Jeong, WoonSeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.157-158
    • /
    • 2021
  • Recently, there have been a growing number of cases using precast concrete construction methods to efficiently carry out construction projects. In order to efficiently carry out PC construction, it is necessary to establish a production plan of PC components that effectively reflect various design alternatives during the initial design stage. Because the production plan of PC components is based on productivity of PC members, the use of PC production simulations that can effectively predict productivity for design alternatives is necessary. Therefore, this paper propose a method to efficiently generate design alternatives which is necessary to perform to production simulations using parametric modeling techniques and BIM.

  • PDF

BIM(Building Information Modeling) (긴급제언: BIM 소개)

  • Cho, Han-Kwang
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.5
    • /
    • pp.31-34
    • /
    • 2010
  • To construct buildings methods and materials written on the book have been operated and managed with additional program as well as management techniques. However with 2D, a tool which has been used to design a plan, or simple 3D modeling weren't competent enough to plan, design and manage the buildings that are getting complex and higher To solve these problems BIM that enable steps(from planning, designing to maintenance management) to be used as a information is being used.

  • PDF

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

A Study on IFC extended and GIS linkage using BIM as Facility Management - Case Study on Bridge and Tunnel of Infra BIM - (BIM을 유지관리로 활용하는 IFC 확장 및 GIS 연계 연구 - 기반시설 BIM의 교량, 터널 중심으로 -)

  • Chae, Jae-Hyun;Choi, Hyun-Sang;Lee, Ji-Yeong
    • Journal of KIBIM
    • /
    • v.12 no.3
    • /
    • pp.1-17
    • /
    • 2022
  • As the technology of Smart City and Digital Twin is developing, techniques to integrate BIM data of infrastructure facilities into GIS are becoming more critical. Hence, this study aims to manage BIM data representing bridge and tunnel structures through the Industry Foundation Classes (IFC) standard and to develop a method to link these IFC-compliant files to the GIS standard CityGML without loss of information. We analyze the criteria for creating BIM data for bridges and tunnels by reviewing the BIM guidelines set by each client. We use these criteria to suggest methods for data management based on InfraBIM as a specific IFC class standard. Furthermore, we perform model analysis to determine the necessary design and construction field-appropriate model process and Level of Detail (LOD). From the model analysis, we conclude that the classified BIM models can be used as base data to generate BIM models of bridges and tunnels for facility management.

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Application of Building Information Modeling (BIM) for the Activation of Industrialized Wooden Buildings - Focused on the Proposal of Reduction Strategies for Inhibiting Factors of the Spread of New Hanok through Social Network Analysis - (공업화 목조 건축 활성화를 위한 건물정보모델링(BIM) 적용방안 - 사회 네트워크 분석을 통한 신한옥 보급 저해요인 감축 전략 제안을 중심으로 -)

  • Park, Woo Jang;Park, Joon Young;Jeong, Sang Kyu
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.113-118
    • /
    • 2017
  • Purpose: This study amis at proposing strategies on the basis of BIM techniques to promote the spread of industrialized wooden buildings for implementation of sustainable architecture. Method: We employed social network analysis (SNA) technique to identify the mutual influences among factors that hinder popularization of new Hanok as the industrialized wooden building. Four strategies were established to reduce the factors with serious influences on each category and stakeholder using BIM techniques. Result: it was demonstrated that the problems occurred in spreading new Hanoks can be reduced by changing the influence structure of social network according to the proposed strategies.

A Comparative Study of Building Energy Simulations for Building Types in Multiple Stock Housing based on BIM(Building Information Modeling) (BIM기반의 공동주택 주동 유형별 건물에너지 시뮬레이션 비교에 관한 연구)

  • Lee, Byeongho;Lee, Geonwon;Yeo, Youngho
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2010
  • The energy efficient design of the multiple stock housing is very important not only to save energy but also to increase sustainability in a whole city because the multiple stock housing type is dominated in the major residential supply markets in Korea. During the early design phase of the multiple stock housing type, the architect need convenient and accurate tools for evaluating energy consumptions based on building types rapidly. Building Information Modeling(BIM) is introduced as useful tool systems providing interoperability between 3rd dimensional modeling tools and environmental engineering analysis tools, and could reduce time and cost for unnecessary modeling works in the analysis. However, it is still hard to apply to building design practice and integrated energy simulation techniques because interoperability using industrial standard file formats such as IFC and bXML is still underdeveloped. Therefore, the purpose of this study is to perform the building energy simulations, to compare the results on typical building types in multiple stock housing based on BIM, and to clear the problems using industrial standard file formats between 3rd dimensional modeling and building energy simulation software. In addition, through comparisons with simulation results according to the typical building types such as building forms, orientations, and building stories, the interrelation ship and characteristics of BIM based building energy simulation software are analysed and evaluated.

The Application of Fuzzy Logic to Assess the Performance of Participants and Components of Building Information Modeling

  • Wang, Bohan;Yang, Jin;Tan, Adrian;Tan, Fabian Hadipriono;Parke, Michael
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.4
    • /
    • pp.1-24
    • /
    • 2018
  • In the last decade, the use of Building Information Modeling (BIM) as a new technology has been applied with traditional Computer-aided design implementations in an increasing number of architecture, engineering, and construction projects and applications. Its employment alongside construction management, can be a valuable tool in helping move these activities and projects forward in a more efficient and time-effective manner. The traditional stakeholders, i.e., Owner, A/E and the Contractor are involved in this BIM system that is used in almost every activity of construction projects, such as design, cost estimate and scheduling. This article extracts major features of the application of BIM from perspective of participating BIM components, along with the different phrases, and applies to them a logistic analysis using a fuzzy performance tree, quantifying these phrases to judge the effectiveness of the BIM techniques employed. That is to say, these fuzzy performance trees with fuzzy logic concepts can properly translate the linguistic rating into numeric expressions, and are thus employed in evaluating the influence of BIM applications as a mathematical process. The rotational fuzzy models are used to represent the membership functions of the performance values and their corresponding weights. Illustrations of the use of this fuzzy BIM performance tree are presented in the study for the uninitiated users. The results of these processes are an evaluation of BIM project performance as highly positive. The quantification of the performance ratings for the individual factors is a significant contributor to this assessment, capable of parsing vernacular language into numerical data for a more accurate and precise use in performance analysis. It is hoped that fuzzy performance trees and fuzzy set analysis can be used as a tool for the quality and risk analysis for other construction techniques in the future. Baldwin's rotational models are used to represent the membership functions of the fuzzy sets. Three scenarios are presented using fuzzy MEAN, AND and OR gates from the lowest to intermediate levels of the tree, and fuzzy SUM gate to relate the intermediate level to the top component of the tree, i.e., BIM application final performance. The use of fuzzy MEAN for lower levels and fuzzy SUM gates to reach the top level suggests the most realistic and accurate results. The methodology (fuzzy performance tree) described in this paper is appropriate to implement in today's construction industry when limited objective data is presented and it is heavily relied on experts' subjective judgment.