건설사업 수행성과평가에 대한 분석 고도화 연구

A Study on Advanced Analysis of Construction Project Performance Evaluation

  • 발행 : 2023.05.17

초록

The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

키워드

과제정보

본 논문은 2023년 국토교통부 "건설공사 사후평가지원센터 운영사업"의 일환으로 수행된 연구임을 밝히며 이에 감사를 드립니다.