• 제목/요약/키워드: work schedule

검색결과 586건 처리시간 0.026초

A Hierarchical Solution Approach for Occupational Health and Safety Inspectors' Task Assignment Problem

  • Arikan, Feyzan;Sozen, Songul K.
    • Safety and Health at Work
    • /
    • 제12권2호
    • /
    • pp.154-166
    • /
    • 2021
  • Background: Occupational health and safety (OHS) is a significant interest of all governments to prevent workplace hazards. Although appropriate legislation and regulations are essentials for the protection of workers, they are solely not enough. Application of them in practice should be secured by an efficient inspection system. Fundamental components of an inspection system are inspectors and their audit tasks. Maintaining the fair balanced task assignment among inspectors strictly enhances the efficiency of the overall system. Methods: This study proposes a two-phased goal programming approach for OHS inspectors' task assignments and presents a case study. Results: The solution approach gives the balanced assignment of inspectors to the workplaces in different cities of the country in the planning period. The obtained schedule takes into account the distances covered by the work places and the number of the workplaces' employees to be audited and pays attention to the human factors by considering the preferences of the inspectors. The comparisons between the obtained optimal schedule and the implemented one that is produced manually show that the approach not only maintains the technical requirements of the problem, but also provides social and physical balance to the task assignment. Conclusion: Both the approach and the application study are expected to offer fruitful inspirations in the area of safety management and policy and they provide a good guide for social policy and organizational aspects in the field of OHS inspectors' task assignment.

Association Between Unpredictable Work Schedules and Depressive Symptoms in Korea

  • Lee, Hye-Eun;Kawachi, Ichiro
    • Safety and Health at Work
    • /
    • 제12권3호
    • /
    • pp.351-358
    • /
    • 2021
  • Backgrounds: Irregular and unpredictable work schedules have become more common in most societies. The purpose of this study was to investigate the association between unpredictable work schedules and depressive symptoms in Korea. Methods: Data from 34,486 workers who participated in the Korean Working Condition Survey in 2017 were used. Unpredictable work schedules were measured by questions about the frequency of changes in work schedule and limited advanced notice. Depressive symptoms were assessed by a single item asking if the participants had depressive symptoms over the last 12 months. Multivariable-adjusted logistic regression analysis was used to calculate odds ratios (ORs) for high depressive symptoms. Results: The OR for depressive symptoms was significantly higher in the workers with unpredictable work schedules compared to those with predictable work schedules after controlling for age, sex, education, salary, marital status, occupation, contract period, full-time versus part-time, shift work, weekly working hours, and having a child under the age of 18 years (OR = 2.43, 95% confidence interval 1.93-3.07). Conclusion: Unpredictable work schedules were associated with depressive symptoms controlling for the other dimensions of precarious employment in a representative working population in Korea.

표준화된 PSDM을 사용한 최적의 WBS 및 효과적인 중소기업 정보화 시스템 구축에 관한 연구 (A study on Deployment of the Optimized WBS and Effective Small and Medium Enterprise Informatization System using Standardized PSDM)

  • 윤경배;권희철
    • 한국인터넷방송통신학회논문지
    • /
    • 제14권6호
    • /
    • pp.199-205
    • /
    • 2014
  • 효과적인 중소기업 정보화를 위하여 표준화된 생산정보화 시스템 개발 방법론(PSDM)을 통하여 단계별 주요 업무에 대한 작업을 정의하고 관련 연관도를 통하여 업무에 대한 선행 및 후행 관계를 정의한 후 그에 따른 프로젝트 범위 일정 비용 인적자원 관리를 위한 최적의 업무분류체계(WBS : Work Breakdown Structure)를 연구개발 하고자한다. 시스템의 신뢰성 품질 생산성 향상을 위한 관리 항목 설정, 중소기업 IT업체 감리업체 등 참여 기업간의 의사소통, 그리고 구축된 생산정보화의 유지보수를 포함한 운영지원 등 보다 체계적이고 효율적인 시스템 구축을 위해 중소기업 생산정보화에 적합한 WBS의 연구로 생산정보화를 구축하고자 참여하는 많은 중소기업 및 IT업체들이 표준화된 방법론을 이용하여 시스템 구축을 보다 효과적으로 수행할 수 있으며, 보다 높은 신뢰성을 가진 시스템을 계획된 개발 일정에 알맞게 구축한다.

An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings

  • Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
    • 한국건축시공학회지
    • /
    • 제11권4호
    • /
    • pp.396-406
    • /
    • 2011
  • Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.

교대 근무 여부에 따른 빈혈 유병 현황 및 위험 인자에 대한 연구 (Research on the Prevalence and Risk Factors for Anemia according to Working Schedule)

  • 오은아;강성규;함승헌;최원준;이완형
    • 한국산업보건학회지
    • /
    • 제33권2호
    • /
    • pp.126-133
    • /
    • 2023
  • Objectives: This study was conducted to find out the prevalence and risk factors of anemia according to shift work. Methods: Data from the Korean National Health and Nutrition Survey (2016-2020) were used. 9,787 workers were divided into shift workers and non-shift workers. The work type between 6AM-6PM was defined as day work, and other work types were defined as shift work. A chi-square test was used to indicate the distribution of risk factors expected to affect shift work in both frequency and percentage. Multiple logistic regression analysis was performed to find out the relationship between anemia prevalence and shift work. Results: As a result of analysis, multiple logistic regression analysis of anemia prevalence and shift work, the OR (95% CI) of male workers on shift work was 2.186 (1.139 to 4.194) and there was a statistically significant difference. Conclusions: In conclusion, anemia in male shift workers should be considered a possibility of health problems. In the future, research based on various data collection should be conducted for research to reveal various causes or diseases of anemia in the future.

공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리 (A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project)

  • 양용철;김상희;김재준
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.123-136
    • /
    • 2003
  • 아파트 공사에서 계획기성은 전체 사업단계에 걸쳐 공사기간 산정, 중도금 납부일정, 사업손익분석, 기성지급, 계획대비 실적비교 관리 등에 활용되므로, 다수 사업 참여자간의 이해와 사업의 성공에 지속적으로 영향을 미치는 핵심적인 관리요소이다. 그러나 대단지 아파트 공사에서는 다수건물 동시 시공으로 인한 공정 액티비티 과다발생으로 인하여 공정표를 작성하고 자원을 분개하여 계획기성을 정확하게 산출하는데 어려움을 겪고 있는 실정이다 본 연구에서는 실태조사를 통하여 기존의 문제점과 원인을 파악하고 계획기성 산출의 프로세스를 개선을 통하여 계획기성을 신속$\cdot$정확$\cdot$체계적으로 산출하기 위한 개선방향을 제시한다.

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축 (Construction of Scheduling Support System for Panel Lines by Digital Manufacturing Simulation)

  • 이광국;최동환;한상동;박주용;신종계
    • 대한조선학회논문집
    • /
    • 제43권2호
    • /
    • pp.228-235
    • /
    • 2006
  • Nowadays, digital manufacturing has been known to be very effective method in manufacturing fields. It is aimed to estimate process time, to improve operation efficiency, and to prevent bottleneck processes in advance of real manufacturing. This paper addresses a scheduling support system for panel hues in a shipyard through digital manufacturing simulation. The proposed system supports operators to make better decisions on the shop-floor scheduling in panel lines. It ,would provide a complete schedule that is at least as good as any schedule currently obtained. Furthermore, it can evaluate the operator's schedule by simulating it with 3-dimensional models before the work orders and schedules are released.

도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구 (A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project)

  • 윤석헌;김성식
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.119-127
    • /
    • 2007
  • 공정 및 공사비는 건설사업관리에 있어서 가장 중요한 정보들로써, 건설사업관리는 이들 정보를 얼마나 효율적으로 관리하는지에 달려 있다. 국내에서는 아직 체계적인 공정관리가 정착되지 못하였으며, 공사비와의 연계관리 또한 정보의 연계성 부족과 많은 노력의 필요로 인하여 실용성이 부족한 형편이다. 본 연구에서는 공정, 공사비 정보의 연계관리를 위하여, 도로공사를 대상으로 사업초기단계부터 공통작업분류체계를 기준으로 디지털수량산출정보(QDB)를 작성하는 방안과 이를 기반으로 하는 디지털 수량산출정보시스템(QDBS)을 제안하고자 한다.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF