An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings |
Kim, Sun-Kuk
(Department of Architectural Engineering, KyungHee University)
Son, Ki-Young (Department of Construction Science, Texas A&M University) Joo, Jin-Kyu (Shindongah Engineering & Construction) Lee, Dong-Hoon (Department of Architectural Engineering, KyungHee University) Lee, Sung-Ho (Department of Architectural Engineering, KyungHee University) |
1 | Selinger S. Construction planning for linear projects. ASCE Journal of Construction Engineering and Management. 1980 Feb;106(2):195-205. |
2 | Carr RI, Meyer W.L. Planning construction of repetitive building units. Journal of the Construction Division 1974 Sep;100(3):403-12. |
3 | Arditi D, Albulak MZ. Line-of-balance scheduling in pavement construction. ASCE Journal of Construction Engineering and Management. 1986 Dec;112(3): 411-24. DOI ScienceOn |
4 | Arditi D, Tokdemir OB, Suh K. Challenges in Line-of-Balance Scheduling. ASCE Journal of Construction Engineering and Management. 2002 Dec;128(6): 545-56. DOI ScienceOn |
5 | Neale RH, Neale DE. Construction Planning. London (UK): Thomas Telford Ltd.; 1989. 165 p. |
6 | Kim YJ, Han JY, Shin DW, Kim KR, Kim CD, Seo SW. A Tact Planning and Scheduling Process Model for Reduction of Finishing Work Duration in Building Construction Projects. Journal of the Architectural Institute of Korea. 2003 Sep;19(1):161-168. 과학기술학회마을 |
7 | United States Census. 2004 economic census industry series reports construction. [On-line]. [Retrieved Aug 11, 2011] Available at www.census.gov/econ/census02/ guide/INDRPT23. HTM. |
8 | Sacks R, Goldin M. Lean management model for construction of high-rise apartment buildings. ASCE Journal of Construction Engineering and Management. 2007 May;133 (5):374-84. DOI ScienceOn |
9 | Kim JH, Yoon YS, Jang MH, Suh SW. Work flow-based TACT Planning & Scheduling Process: Focused on the Finish Work of Apartment Building. Journal of the Architectural Institute of Korea. 2007 Dec; 23(6):153-63. 과학기술학회마을 |
10 | Kim YS, Hwang MH, Park CS. A Study on the Present Status and Problem Analysis of Construction Process Management in Domestic Building Construction Sites. Journal of the Architectural Institute of Korea. 1996 Dec;12(12):253-65. 과학기술학회마을 |
11 | Hwang HS, Kim KR, Suh SW, Kim CD, Shin DW. Analysis of Actual Duration by Effecting Elements to Duration Estimate: Focused on Standard Duration of the Office Building Construction. Korean Journal of Construction Engineering and Management. 2002 June; 3(3):84-93. 과학기술학회마을 |
12 | Yoon YS, Suh SW. The application of tact time at finish work for building construction: Focused on Office Building. Korean Journal of Construction Engineering and Management. 2005 Dec;6(6):90-7. 과학기술학회마을 |
13 | Rahbar FF, Rowing JE, Repetitive Activity Scheduling process. Proceedings of the 36st Annual Meeting of the Transactions of the American Association of Cost Engineers; Orlando; [date unknown]. Orlando (PL): Transactions of the American Association of Cost Engineers; 1992. p. 51-58. |