On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

기상요인을 고려한 조경식재 공사기간 설정에 관한 연구 -서울시를 사례로- (A Study on the Estimating Probable Period of the Planting Work in Consideration of Weather Factor -In the Case of Seoul City-)

  • 이상석;최기수
    • 한국조경학회지
    • /
    • 제21권4호
    • /
    • pp.69-82
    • /
    • 1994
  • The purpose of this study is to estimate the probable period of the planting work in consideration of weather factors. The impact degree of weather factors on the control of planting schedule was measured by the possible working days on the basis of weather condition. To establish the weather standard, the researcher analyzed the questionnaires on the manager of planting work and also the meteorological data for 10 years(1983-1992) in Seoul. The results are as follows; $\circled1$ The possible period of the planting work is from March 17 to May 18 Spring and from September 26 to December 15 in Autumn during a year. $\circled2$ The problem working days of the planting work(106-130) days per year) are less than the building construction days(174 days per year), because of handling the living material of plants, specially in summer and winter.

  • PDF

액티비티 기반의 EVM - PMIS 통합모델 구축 (The Establishment of an Activity-Based EVM - PMIS Integration Model)

  • 나광태;강병희
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.199-212
    • /
    • 2010
  • 국내 건설산업에 있어서 기술과 정보의 기반구조를 확립하기 위하여 몇몇 건설정보관련 법규가 제도화되었다. 그러나 국내 건설정보 분류체계, 공정 공사비 통합관리(EVM), 프로젝트관리 정보시스템(PMIS)은 주요한 문제점을 내포하고 있다. 특히 현행 PMIS의 기능은 시공자 위주의 시스템으로 되어 있고, EVM이 적용되지 않아 발주자를 위한 보고, 분석, 예측기능이 매우 취약하다. 더욱이 EVM과 PMIS가 서로 분리된 체계로 운영되고 있어 발주자가 실시간으로 공정 및 공사비 정보를 확인할 수 없다. 본 연구의 목적은 PMIS가 EVM기능을 제공하고 사업참여자들이 제반정보를 공유할 수 있도록 WBS 구축방안과 EVM - PMIS 통합모델을 제안하여, E-비즈니스 업무환경하에서 PMIS를 효율적으로 운용할 수 있는 틀(framework)을 제공하는 것이다. EVM - PMIS 통합의 핵심은 EVM과 PMIS가 액티비티 기반의 동일한 운영체계를 갖는 것이다. 통합의 원리는 액티비티의 정보항목(field)을 PMIS의 공정 및 공사비관리 기능을 위한 하위모듈을 구성하는 관계형 데이터베이스 테이블(table)의 항목과 연계시키는 것이다. 따라서 액티비티의 계획공사비(PA), 달성공사비(EV), 실투입비(AC), 공정편차(SV), 공정수행지수(SPI), 공사비편차(CV), 공사비지출지수(CPI)는 PMIS의 공정 및 공사비 하위모듈을 위한 데이터베이스 테이블의 항목으로 연계된다.

소비자상담사의 업무수행, 만족도 및 업무지속의사에 대한 연구 (Study on Consumer Counselors' Work Performance, Satisfaction and Willingness to Sustain the Work)

  • 허경옥
    • 한국생활과학회지
    • /
    • 제12권5호
    • /
    • pp.669-685
    • /
    • 2003
  • This research examined the work performance by consumer counselors, evaluations of their counseling work, the level of their satisfaction, and willingness to sustain consumer counseling work among Consumer Agencies and also identified the variables influencing the evaluation scores on those. The results were summarized as follows. First, the evaluation scores on the work performance of consumer counseling were generally high and they turned out to be generally satisfied with their work. On the other hand, most counselors responded that they would continue their counseling work. Second, there were differences in evaluation scores about speed and specialized area of counseling among Consumer Agencies. Counselors who worked for the Korea Consumer Protection Board recorded high scores in those both criteria. There were differences in the willingness of counselors to continue their counseling work among Consumer Agencies, too. Third, the evaluation scores in six areas of counseling tasks were high when the degree of satisfaction of counselors were high or when agencies treated the counseling important. Fourth, when counselors earned more salaries and owned the experience of in-firm training and when the Consumer Agencies highly valued counseling as consumer tasks, the degree of satisfaction among counselors increased. Finally, when counselors were old, major in consumer science, and held regular work-schedule, they exhibited high degree of satisfaction in their counseling work and they showed greater willingness to sustain their counseling work.

  • PDF

The Effect of Working-hour Characteristics and Health Status of Nurses on Work-life Balance: Using the 5th Korean Working Conditions Survey

  • Cho, Eunjeong;Ju, Jieun;Oh, Booyoung
    • Journal of Korean Biological Nursing Science
    • /
    • 제24권4호
    • /
    • pp.209-218
    • /
    • 2022
  • Purpose: This study aimed to investigate the relationships between the characteristics of nurses' work schedules, health outcomes, and work-life balance. Methods: This was a secondary data analysis that included 422 nurses in Korean hospitals. Descriptive analysis, independent sample t-test, one-way ANOVA, Pearson correlation analysis, and multiple linear regression analysis were used to identify the associated factors. Results: Multiple linear regression analysis showed that work-life balance was lower when atypical work was performed (β=-.14, p=.010). Nurses who did not work overtime showed a higher level of work-life balance than those who worked overtime infrequently (β=-.11, p=.002) or frequently (β=-.28, p<.001). The work-life balance level increased when nurses had better subjective health status (β=.16, p<.001) or higher sleep quality (β=.29, p<.001). It was verified that the work-life balance level was higher for single-person households than for households with two (β=-.18, p=.003), three to four (β=-.16, p=.022), or five or more (β=-.21, p<.001) persons. Conclusion: This study suggests that government and hospital organizations should provide high-quality care and consideration to nurses who do atypical or overtime work as well as their subjective health status and sleep quality. Further research should focus on the development of a policy that improves the work-life balance of nurses, especially for those who work during atypical hours.

국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석 (The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes)

  • 손권중;유왕진;이철규
    • 기술혁신연구
    • /
    • 제16권1호
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정 (Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model)

  • 문성우;박상천;권기남
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.26-33
    • /
    • 2009
  • 건설사업의 단계별 진행에 따라서 공정 스케줄의 정확도에 대한 요구수준이 달라진다. 본 연구의 목적은 건설사업의 초기단계에서 활용할 수 있는 표준공정모델을 제시하여 신속하게 전체 개략공기를 산정하는 체계를 제시하는 것이다. 표준공정모델을 적용하여 작업공정을 모듈화하고, Top-down 식 접근으로 상위레벨에서 공정모듈 간 작업연관관계를 분석함으로써 신속하게 프로젝트의 공사기간을 산정할 수 있다. 표준공정모델의 타당성을 검증하기 위해서 각 공정모듈의 작업기간이 일정하다고 가정하고, 가스 플랜트 공정에 대하여 적용시켰다. 그 결과 표준공정모델을 사용하여 계산한 개략 공사기간과 공정관리 툴을 사용한 상세 공사기간은 -3.1% 부터 +15.0%까지의 범위에서 차이를 가졌다. 이러한 결과는 제시된 표준공정모델이 일정 수준의 신뢰성을 가지는 공정 스케줄 정보를 제공하고, 사업기획과 타당성 분석 등 건설사업의 초기단계에서 신속하게 의사결정을 도울 수 있다는 것을 보여준다.

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

TACT 공정관리 시스템 개발 및 적용 사례 (Development and Application of TACT Management System)

  • 서상욱;김재호;김선국;김창덕;이현수
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.145-154
    • /
    • 2003
  • 건설산업의 환경변화와 정보기술의 발달에 따라 건설사업 효율성 향상의 필요성이 커지고 있다. 그러나 건설사업의 효율성 제고를 위한 관리시스템의 필수요건이 되는 성과측정 도구는 여전히 부족한 실정이다. 한편, 공정관리의 경우, 공사수행 결과로 나타나는 시간, 비용, 진도 율 등의 실적위주로 관리되고 있으며, 진행단계에서의 전체 작업간의 연속적 흐름에 대한 관리는 제대로 이루어지지 못하고 있다. 따라서 본 연구에서는 건축공사의 계획단계에서부터 진행단계, 최종 평가에 이르는 프로세스의 시스템화를 시도하였고, 특히 택트 공정관리의 시스템화를 통하여 공사수행 과정 중의 마감공사 수행 정도를 측정할 수 있는 지표를 개발하고 이를 활용하는 방안을 제시하였다.

TACT 공정관리 시스템 개발 및 적용 사례 (Development and Application of TACT Management System)

  • 김재호;서상욱;김선국;김창덕;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.126-134
    • /
    • 2003
  • 건설산업의 환경변화와 정보기술의 발달에 따라 건설사업 효율성 향상의 필요성이 커지고 있다. 그러나 건설사업의 효율성 제고를 위한 관리시스템의 필수요건이 되는 성과측정 도구는 여전히 부족한 실정이다. 한편, 공정관리의 경우, 공사수행 결과로 나타나는 시간, 비용, 진도율 등의 실적위주로 관리되고 있으며, 진행단계에서의 전체 작업간의 연속적 흐름에 대한 관리는 제대로 이루어지지 못하고 있다. 따라서 본 연구에서는 건축공사의 계획단계에서부터 진행단계, 최종 평가에 이르는 프로세스의 시스템화를 시도하였고, 특히 택트 공정관리의 시스템화를 통하여 공사수행 과정 중의 마감공사 수행 정도를 측정할 수 있는 지표를 개발하고 이를 활용하는 방안을 제시하였다.

  • PDF