• Title/Summary/Keyword: work schedule

Search Result 591, Processing Time 0.022 seconds

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

A Study on the Estimating Probable Period of the Planting Work in Consideration of Weather Factor -In the Case of Seoul City- (기상요인을 고려한 조경식재 공사기간 설정에 관한 연구 -서울시를 사례로-)

  • 이상석;최기수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.69-82
    • /
    • 1994
  • The purpose of this study is to estimate the probable period of the planting work in consideration of weather factors. The impact degree of weather factors on the control of planting schedule was measured by the possible working days on the basis of weather condition. To establish the weather standard, the researcher analyzed the questionnaires on the manager of planting work and also the meteorological data for 10 years(1983-1992) in Seoul. The results are as follows; $\circled1$ The possible period of the planting work is from March 17 to May 18 Spring and from September 26 to December 15 in Autumn during a year. $\circled2$ The problem working days of the planting work(106-130) days per year) are less than the building construction days(174 days per year), because of handling the living material of plants, specially in summer and winter.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Study on Consumer Counselors' Work Performance, Satisfaction and Willingness to Sustain the Work (소비자상담사의 업무수행, 만족도 및 업무지속의사에 대한 연구)

  • Huh, Kyung-Ok
    • Korean Journal of Human Ecology
    • /
    • v.12 no.5
    • /
    • pp.669-685
    • /
    • 2003
  • This research examined the work performance by consumer counselors, evaluations of their counseling work, the level of their satisfaction, and willingness to sustain consumer counseling work among Consumer Agencies and also identified the variables influencing the evaluation scores on those. The results were summarized as follows. First, the evaluation scores on the work performance of consumer counseling were generally high and they turned out to be generally satisfied with their work. On the other hand, most counselors responded that they would continue their counseling work. Second, there were differences in evaluation scores about speed and specialized area of counseling among Consumer Agencies. Counselors who worked for the Korea Consumer Protection Board recorded high scores in those both criteria. There were differences in the willingness of counselors to continue their counseling work among Consumer Agencies, too. Third, the evaluation scores in six areas of counseling tasks were high when the degree of satisfaction of counselors were high or when agencies treated the counseling important. Fourth, when counselors earned more salaries and owned the experience of in-firm training and when the Consumer Agencies highly valued counseling as consumer tasks, the degree of satisfaction among counselors increased. Finally, when counselors were old, major in consumer science, and held regular work-schedule, they exhibited high degree of satisfaction in their counseling work and they showed greater willingness to sustain their counseling work.

  • PDF

The Effect of Working-hour Characteristics and Health Status of Nurses on Work-life Balance: Using the 5th Korean Working Conditions Survey

  • Cho, Eunjeong;Ju, Jieun;Oh, Booyoung
    • Journal of Korean Biological Nursing Science
    • /
    • v.24 no.4
    • /
    • pp.209-218
    • /
    • 2022
  • Purpose: This study aimed to investigate the relationships between the characteristics of nurses' work schedules, health outcomes, and work-life balance. Methods: This was a secondary data analysis that included 422 nurses in Korean hospitals. Descriptive analysis, independent sample t-test, one-way ANOVA, Pearson correlation analysis, and multiple linear regression analysis were used to identify the associated factors. Results: Multiple linear regression analysis showed that work-life balance was lower when atypical work was performed (β=-.14, p=.010). Nurses who did not work overtime showed a higher level of work-life balance than those who worked overtime infrequently (β=-.11, p=.002) or frequently (β=-.28, p<.001). The work-life balance level increased when nurses had better subjective health status (β=.16, p<.001) or higher sleep quality (β=.29, p<.001). It was verified that the work-life balance level was higher for single-person households than for households with two (β=-.18, p=.003), three to four (β=-.16, p=.022), or five or more (β=-.21, p<.001) persons. Conclusion: This study suggests that government and hospital organizations should provide high-quality care and consideration to nurses who do atypical or overtime work as well as their subjective health status and sleep quality. Further research should focus on the development of a policy that improves the work-life balance of nurses, especially for those who work during atypical hours.

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model (초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정)

  • Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.26-33
    • /
    • 2009
  • The required level of detail in scheduling depends on the stages in the construction life-cycle. The objective of this study is to provide a Standardized Schedule Model (SSM) with an aim to facilitate the estimating of construction duration in the planning stage. The SSM modularizes work items; establishes relations between preceding and succeeding activities; and calculates approximate construction duration. The estimated duration of the SSM was compared with the detailed duration from the commercial scheduling tool using actual work activities. The difference showed to be ranged between -3.1% and +15%, which demonstrates that the SSM can be feasibly applied to the approximate estimation of construction duration.

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.