• Title/Summary/Keyword: work productivity

Search Result 1,334, Processing Time 0.022 seconds

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

Effectiveness of the Preprocessed Foods on Productivity and Satisfaction in School Foodservices (전처리 식재료 사용이 학교급식 생산성과 만족도에 미치는 영향)

  • Yun, Hye-Jung;Chang, Hye-Ja
    • Journal of the Korean Dietetic Association
    • /
    • v.15 no.3
    • /
    • pp.262-277
    • /
    • 2009
  • Fresh-cut foods have been widely used in the school foodservice industry due to their convenience and saving effects of labor and working hours. This study evaluated the effectiveness of using fresh-cut foods in school foodservice with respect to cost efficiency, customer satisfaction, employee satisfaction, and productivity. First, in terms of cost efficiency, the cost of the fresh-cut food per meal price significantly increased by 2.6% via the new production plan. Meanwhile, the costs of labor and food wastes significantly decreased by 3.0% and 0.3%, respectively, after implementing the new plan. Second, customer satisfaction towards foodservice significantly increased, from 2.94 points prior to the new plan to 3.45 points. Third, foodservice productivity such as of the number of meals per full-time equivalent employee increased by 5.7 meals, from 143.0 meals to 148.7 meals after intervention. The productivity index of work hours for producing a meal also increased and was reflected by a work time reduction of 0.77 minutes, specifically from 4.25 minutes to 3.48 minutes. The labor cost per meal also decreased by 29.9 won, from 331.91 won to 301.97 won, but there was no significant difference. Through these results, we identified that using pre-process foods in school foodservice has positive effects on labor saving, customer satisfaction, and employee work satisfaction.

  • PDF

Analysis of Constructability Factors Affecting on the Productivity of Tall Building Construction -With Focus on the Area of Steel Work- (고층 건물에서 시공성 요인이 생산성에 미치는 영향 분석 -철골 공사를 중심으로-)

  • Yoon, Hyunbo;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.30-38
    • /
    • 2014
  • Achieving high productivity and constructability are very important issues in construction industry. Study on constructability have been conducted actively, and many researches referred that improving constructability can enhance cost, quality, schedule, productivity and so on. However, there are lack of quantitative analysis, since most studies have proved correlation between productivity and constructability using questionaries and by case studies. Also, researches are mostly about specific detail scope of work to improve constructability, thus it is hard to apply constructability factors on various work in construction. In this paper, will deduct general factors affecting on constructability and evaluate effects of factors affecting on each work. Furthermore this paper will verify impact of factors affecting on productivity by multi regression anlaysis using actual data sets of high-rise building construction site.

A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers (건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su;Yi, Dong-Ryul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.12
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

Effects of Dry Eye Symptoms on Work Productivity and General Activity in Newly Building (신축건물에서 안구건조증이 작업생산성과 일상활동에 미치는 영향)

  • Kim, Hyojin;Park, Chan-Jung;Lim, Byung-Seo;Kim, Ho-Hyun
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.19 no.3
    • /
    • pp.389-396
    • /
    • 2014
  • Purpose: The study examined dry eye symptoms of occupants in a newly constructed building and its effects on their work productivity and general activity. Methods: The study subjects were 33 office workers who spent more than eight hours per day on average in a new building constructed in the past three months. The indoor air quality of the new building was evaluated by measuring aldehydes, temperature and humidity. The level of dry eye symptoms was classified into normal, mild, moderate and severe by using the Ocular Surface Disease Index (OSDI). The experience of LASIK surgery, use of eye makeup, daily use time of a computer and smart-phone, and average daily working hours were also examined. The Work Limitation Productivity Questionnaire was used as the questionnaire about work productivity and general activity to measure the impairment level on a ten-point scale. Results: The concentration variation of formaldehyde in the office was $42.42{\pm}6.30{\mu}g/m^3$. The temperature and humidity were $26.2{\pm}0.70^{\circ}C$ and $40{\pm}1%$, respectively. The respondents with normal, mild, moderate and severe dry eye symptoms were 15.2%, 18.2%, 18.2% and 48.5%, respectively. The severity of dry eye symptoms and impairment of work productivity and general activity demonstrated high correlations of 0.599 and 0.655, respectively (p<0.001). Compared to the normal case, severe dry eye symptoms demonstrated significantly high impairment of work productivity and interruption of general activity (p<0.001). The case of serious dry symptoms showed the possibilities of having impairment level of work productivity and interruption of general activity above three points 3.26 times (p=0.032) and 2.25 times (p=0.045), respectively, higher than that of the normal case. Conclusions: It was confirmed that dry eye symptoms among office workers in a newly constructed building affects work productivity and general activity.

A Study on Factors Affecting the Productivity of Dishwashing Work in Hospital Foodservice Systems (병원급식 식기세정작업 생산성에 영향을 미치는 요인)

  • Park, Joung-Soon;Hong, Wan-Soo
    • Journal of the Korean Society of Food Culture
    • /
    • v.12 no.1
    • /
    • pp.71-78
    • /
    • 1997
  • The productivity of a hospital foodservice system has a significant implication in hospital management as costs for labor and material increase, competitions among hospitals increase, and patients' expectations as to the quality of hospital services increase. The foodservice is characterized by its labor intensiveness. The objective of this study was to examine associations between operational and managerial factors and the productivity of dishwashing work in hospital foodservice systems. The labor productivity in 20 conventional food service systems was assessed and related to a number of influencing variables within the system. The productivity measurement was based upon the total dish equivalents as a ratio of the total direct and non-direct labor hours required to wash these dishes. 20 hospitals with more than 500 beds located in Seoul were surveyed to obtain data for study variables. Questionnaire and a survey form were mailed. Statistical methods used in this study were descriptive analysis and Pearson product moment correlation analysis. Hospital system characteristic which was found to correlate significantly with productivity was the ratio of dish loss. As this increased, the productivity level increased.

  • PDF

The Impact of Job Stress and Job Satisfaction on Workforce Productivity in an Iranian Petrochemical Industry

  • Hoboubi, Naser;Choobineh, Alireza;Ghanavati, Fatemeh Kamari;Keshavarzi, Sareh;Hosseini, Ali Akbar
    • Safety and Health at Work
    • /
    • v.8 no.1
    • /
    • pp.67-71
    • /
    • 2017
  • Background: Job stress and job satisfaction are important factors affecting workforce productivity. This study was carried out to investigate the job stress, job satisfaction, and workforce productivity levels, to examine the effects of job stress and job satisfaction on workforce productivity, and to identify factors associated with productivity decrement among employees of an Iranian petrochemical industry. Methods: In this study, 125 randomly selected employees of an Iranian petrochemical company participated. The data were collected using the demographic questionnaire, Osipow occupational stress questionnaire to investigate the level of job stress, Job Descriptive Index to examine job satisfaction, and Hersey and Goldsmith questionnaire to investigate productivity in the study population. Results: The levels of employees' perceived job stress and job satisfaction were moderate-high and moderate, respectively. Also, their productivity was evaluated as moderate. Although the relationship between job stress and productivity indices was not statistically significant, the positive correlation between job satisfaction and productivity indices was statistically significant. The regression modeling demonstrated that productivity was significantly associated with shift schedule, the second and the third dimensions of job stress (role insufficiency and role ambiguity), and the second dimension of job satisfaction (supervision). Conclusion: Corrective measures are necessary to improve the shift work system. "Role insufficiency" and "role ambiguity" should be improved and supervisor support must be increased to reduce job stress and increase job satisfaction and productivity.

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

A Study on Productivity Improvement Scheme Through Site Case Study In PSM (현장 사례를 통한 PSM 공법의 생산성 향상 방안에 관한 연구)

  • Lee Tai Sik;Lee Won Yong;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2001
  • PC Box Girder was constructed by PSM(Precast Span Method) to solve the shortage of the construction period. The site case study was used in the PSM to find the construction productivity improvement. In this case study, main reasons of low productivity were founded unskilled technical engineers and insufficient equipment management winter season concrete curing condition. Productivity improvements are presented by assigning production personnel appropriately, motivation which increased by providing incentives for technical engineers, strictly cooperation of each participant, organizational teamwork, and Promoting productive work condition. Additional method of productivity improvements are continuous improvement of the work methods by considering the feedback on previous work, and continuous training to best handle the site conditions. This study of productivity improvement will help to use the most advantage of the PSM method and desire to successfully plan the future construction performance.

  • PDF