• Title/Summary/Keyword: work process management

Search Result 1,970, Processing Time 0.032 seconds

Risk Factor Selaction and Safety Management Plan in the Underground Excavation Construction (지반굴착공사에서의 위험요인 선정과 안전관리방안 연구)

  • Won, Yu-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.21 no.4
    • /
    • pp.31-37
    • /
    • 2019
  • When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

FEASIBILITY OF A RFID-BASED MONITORING SYSTEM FOR THE CONCRETE POUR PROCESS

  • S. W. Moon;S. M. Hong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.433-439
    • /
    • 2007
  • A ubiquitous environment in construction requires integrating hardware and software systems. Currently the Construction System Integration Lab (CSIL) at Pusan National University is currently studying the application of ubiquitous technology for better communication in the construction process. In this paper, a pilot of Ubiquitous Concrete Pour System (u-CPS) has been presented to demonstrate the effectiveness of data exchange in the concrete pour process. The u-CPS environment takes advantage of the RFID technology for collecting construction data. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.

  • PDF

The Survey of Time Management Status in the Domestic Construction Site (국내 건설현장의 공정관리 현황 실태 조사)

  • Yoon, Byung-Sik;Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.578-582
    • /
    • 2008
  • The domestic construction companies have implemented a various of management methodology and tools for time management. However, the work completion rate versus work plan have a big difference with the planned work completion rate previously despite of implementing the time management methodology and tools. The research searches the problems that the previous time management process and tools focusing on the management factors that can be controlled. Also, It suggest the improvement direction for these limits.

  • PDF

Workplace Accidents and Work-related Illnesses of Household Waste Collectors

  • Jeong, Byung Yong;Lee, Sangbok;Lee, Jae Deuk
    • Safety and Health at Work
    • /
    • v.7 no.2
    • /
    • pp.138-142
    • /
    • 2016
  • Background: Household waste collectors (HWCs) are exposed to hazardous conditions. This study investigates the patterns of workplace injuries and work-related illnesses of HWCs. Methods: This study uses cases of workplace injuries and work-related illnesses of HWCs that occurred between 2010 and 2011. We analyzed 325 cases of injuries and 36 cases of illnesses according to the workers' age, length of employment, size of workplace, injured part of body, day and month of injury, type of accident, agency of accident, and collection process. Results: There were significant differences in the effect of workers' length of employment, injured part of body, type of accident, agency of accident, and collection process. Results show that most injuries occur in workers in their 50s and older. This study also shows that 51.4% of injuries occur at businesses with 49 employees or fewer. Injuries to waste collectors happen most often when workers are electrocuted after slipping on the ground. The second most prevalent form of injury is falling, which usually happens when workers hang from the rear of the truck during transportation or otherwise slip and fall from the truck. Work-related illnesses amongst waste collectors are mostly musculoskeletal conditions due to damaging postures. Conclusion: These findings will be instructive in devising policies and guidelines for preventing workplace injuries and work-related illnesses of HWCs.

The Optimal Parameter Design of the stone surface equipment Using the Taguchi Method (다구찌 방법을 이용한 석재표면처리장치의 최적표면가공조건 선정에 관한 연구)

  • 김득주;서장훈;박명규
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.251-262
    • /
    • 2004
  • There is boner process of stone manufacturing to become quality down of stone to consolidated micro crack appearance of stone surface and biotite by fire that is to be route process in stone surface by flame of LPG. And then, it is develop that stone surface process equipment by automation for the work method of boner process can be substitute work method by shotball blasting. To developement of equipment, There is to be down noise and dust. Acording to remove calamity growth hazardous substance in the work environment, there is to solve workplace avoidance factor. We have taken Taguchi's parameter design approch, specifically orthogonal array, and determined the optimal levels of stone surface through analysis of the experimental results using SIN ratio.

Repetitive Strain Injury on Automobile Assembly Process and Alexander Technique

  • Dae Sig, Kim
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.67-78
    • /
    • 2004
  • In the trim line of an automobile assembly process, 52.9% of the subjects complained the shoulder and low back pain simultaneously. The Alexander Technique is an educational method which shows people how they are misusing their bodies and how their daily habits of work can be harmful. It also teaches people how to avoid work habits which create excessive amounts of static work and how to reduce the amount of unnecessary muscular force they are applying to their bodies. The purpose of this paper is to investigate the importance of repetitive strain injury on automobile assembly line process and contribute reducing the repetitive strain injury through Alexander Technique.

A Study on the Development of Dredge Process Management System (준설공정관리시스템 개발에 관한 연구)

  • 정대득;이중우;조증언
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.75-85
    • /
    • 2001
  • Accuracy of dredging processes depends on the types of equipment used, the sediments encountered, whether the work to be performed is new or maintenance dredging, pre- and post-hydrographic surveying and so forth. Among those, position surveying accuracy which is directly determined by the control of the dredge's position and depth surveying accuracy being surveyed at the dredging point during dredging work are important factors. The purpose of this study is to develop 'Dredge Management System'for Grab dredge which is composed of 4 sub-system using LADGPS for dredge position determining system and dredging point determining system, tide gauge system and optical sensor for depth determining system and GIS and ENC for total management system. This system is installed on the grab dredge 'EUNJIN G-18'and applied to anchorage dredging work. at Pohang Harbor. The results revealed that this system is easy to operate, achieves good accuracy with only 45cm unevenness, reduces working period by 22 percent and saves cost 16.6 percent.

  • PDF

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

Proposal for Government Business Management System Innovation Direction : Focusing on the Analysis of the Private Enterprise Business System and Current Status of On-Nara 2.0 (정부 업무관리시스템 혁신 방향 제언 민간기업 업무시스템 및 온-나라 2.0 현황 분석을 중심으로)

  • Hwang, Jin hyun;Yim, Jin hee
    • The Korean Journal of Archival Studies
    • /
    • no.75
    • /
    • pp.135-176
    • /
    • 2023
  • The business management system is a standardized system commonly used by government agencies and is a major tool that remains in the work process and decision-making of government agencies. Production of document-type records is mainly focused on approval documents, so it does not cover various types of records. In a changing environment such as the production of new digital types of records, the emergence of various collaboration software and work systems, and remote work, it is necessary to think about the direction the government work management system will go. This study investigates business systems and utilization methods of competitive companies, analyzes the usage status of On-Nara 2.0, a government business management system, and conducts interviews with business managers. And the purpose is to analyze what kind of difference there is. In addition, we would like to suggest improvement functions and policy directions to respond to digital innovation and improve job accountability and efficiency.