When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

Keywords

References

  1. LH, 지반조사 체크리스트.
  2. 고용노동부, 안전보건공단(2016), 안전보건 실무길잡이 (건설업 굴착공사).
  3. 국가법령정보센터(2018), 건축법 시행규칙 [별표 4의2].
  4. 국토교통부(1997), 건설공사 안전관리 편람(토목일반).
  5. 국토교통부(2014), 가설공사 표준시방서.
  6. 국토교통부(2016), 가설흙막이 설계기준.
  7. Ministry of Land, Infrastructure and Transport (2016), Hypothetical earth retaining design criteria, KSD 21 30 00 : 2016. 1-2
  8. The Architectural Institute of Korea(2010), Building Construction Technology, Gimundang, 61-70
  9. T. R. Cho(2004), Basic Engineering, Gumiseogwan, 182-193.
  10. Korea Expressway Corporation Road Research Institute,(1998), Constructi on work safety management practice earthwork and excavation construction, 197-198.
  11. C. S. Lee(2005), Architectural Engineering,Hansol Academy.
  12. J. H. Seong(2012), Improveme nt of Safety Management of Excavation Works, Siseol-Anjeon, 39:179-183.
  13. Seoul Urban Infrastructure Headqu arters(2014), Assessment and safety management of long-term dwellings in urban areas, 13-14.
  14. Construction Safety Management Information System(2018), Accident Data Base, http://www.cosmis.or.kr