• Title/Summary/Keyword: work process management

Search Result 1,982, Processing Time 0.033 seconds

Development of Cost Estimation Model Considering Process Risk for Asbestos Dismantling Work (석면해체 공사의 공정 리스크를 고려한 비용 산정 모델 개발 )

  • Noh, Jae-Yun;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.49-50
    • /
    • 2023
  • Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.

  • PDF

Web-based Coordination System for Daily Work Report between Contractor and Subcontractor (원수급업체와 하수급업체간 웹기반 작업일보 연동시스템 개발)

  • Seo Hae-Jun;Koo Kyo-Jin;Um Ik-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.370-375
    • /
    • 2004
  • The management of daily work report is very important due to the variety of work trade and activities. Although various project management systems have been developed to effectively deal with various task in site, they are not in practical use due to the non-coorperative attitude of sub-contractors. This is the reason the system are not developed in the focus of sub-contractors, but main contractors and the detail information about daily work report is omitted or lost in the collection process by contractors. Therefore the purpose of this study was to propose the Web-based coordination system for daily work report between contractor and sub-contractors

  • PDF

The Direction of Nursing Management Domain for Nursing Personal Licensing Examination Board (간호사 국가시험 과목 통합을 위한 간호관리학 영역의 방향)

  • Kim, Mun-Shil;Chi, Sung-Ai;Park, Kwang-Ok;Kim, In-Sook;Park, Hyun-Tae
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.8 no.4
    • /
    • pp.515-534
    • /
    • 2002
  • Purpose : This study was to provide a meaningful framework for establishment of the direction of Nursing Management area to get ready for Nursing Personal Licensing Examination Board. Method : Using methodological and descriptive research method, the research process was as follows: a preliminary work list which was performed by New Nurse related to nursing management area was made of such key information as the domain of nursing management work, the element of that domain, and the detail work content, by means of a broad review of literature related to nursing management on Licensing Examination for the new nurse. After this preliminary work list sought to obtain examination, consensus, and modification of expert group in the nursing management field, research instrument which was the work list performed by new nurse within nursing management area was to developed. And next, it was to survey various of the importance and the frequency of that work performance by registered nurse, nurse manager, and the professors to take responsible of nursing management. Finally, the educational content for nursing management at the level of baccalaureate was proposed by various analyzing of research results. Results : The work list which was performed by new nurse related to nursing management area consisted of 9 domains, 24 elements, and 80 detail work contents. After it was examined into such various analysis as descriptive statistics, ANOVA, mean range, and so on, of the importance perception of the work and the frequency of work performance, the educational contents for baccalaureate in nursing management which consisted of total 65 contents made up of 18 core contents and 47 essential contents, which new nurses have to necessarily know and perform within the nursing management area. Conclusion : The results of this study will contribute to identifying the work list of new nurses performed in nursing management area and also proposing the educational contents that was taught at the level of baccalaureate in nursing management area based on doing actually in nursing unit.

  • PDF

Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

Application of An Analytical Hierarchy Process to Set Priorities on Standardization Work Items of Next Generation Internet Protocol Television (차세대 IPTV 표준화 항목 우선순위 결정을 위한 계층분석방법 응용)

  • Woo, Hoon-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.192-198
    • /
    • 2010
  • To maximize effectiveness of standardization activities, it is essential to set priorities for determined standardization work items in the next generation internet protocol television (NG-IPTV) technologies. In this study, the analytic hierarchy process(AHP) is employed and applied to ranking of NG-IPTV standardization work items as a multi-criteria decision making tool which involves comprehensive surveys. Survey results are analyzed and we identified a useful three level segmentation of standardization strategic plan which shows standardization work item priorities.

An Injection Molding Process Management System based on Mobile Augmented Reality (모바일 증강현실 기반 사출성형공정 관리시스템)

  • Hong, Won-Pyo;Song, Jun-Yeob
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.31 no.7
    • /
    • pp.591-596
    • /
    • 2014
  • Augmented reality is a novel human-machine interaction that overlays virtual computer-generated information on a real world environment. It has found good potential applications in many fields, such as training, surgery, entertainment, maintenance, assembly, product design and other manufacturing operations. In this study, a smartphone-based augmented reality system was developed for the purpose of monitoring and managing injection molding production lines. Required management items were drawn from a management content analysis, and then the items were divided into two broad management categories: line management and equipment management. Effective work management was enabled by providing those working on the shop floor with management content information combined with the actual images of an injection molding production line through augmented reality.

A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

The Subcontract Workers Protection Plan Research against a Dangerous Work (위험 작업에 대한 하도급 근로자 보호방안 연구)

  • Kim, Dae-Ho;Kim, Byung-Suk
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.11a
    • /
    • pp.85-95
    • /
    • 2007
  • It compared subcontractor with contractor that are wages, the labor hour and labor condition of the work environment back are inferior relative. The subcontractor which basically the contract workers evade the dangerous process or the difficult work, the dirty work back what is called 3D the case which does to keep a business is many. so With life it will be threatened consequent health directly. The possibility where the subcontractor will be exposed to danger work came to be high. Together the reason of subcontract at managing the big business the case which becomes accomplished in objective, about lower the immediacy safety&health problem, subcontractor assigned workers is the actual condition only it could not be deteriorated more in public finance of the supply and enterprise and technical ability insufficiency. Consequently it prevents the subcontract which danger work is insensitive from this research and immediacy of the subcontract workers who is weak hygiene circumstance complement the plan it will be able to secure the immediacy safety&health subcontract workers, substantially to prepare in the hazard subcontract proprietor.

  • PDF