1 |
Mossman, Alan (2013) Last Planner(R) : 5 + 1 crucial & collaborative conversations for predictable design & construction delivery. http://bit.ly/LPS-5cc (22-Apr-13)
|
2 |
Hamzeh, F.R. (2011). "The Lean Journey: Implementing the Last Planner System in Construction", Proceedings of the 19th Annual Conference of the International Group for Lean Construction, IGLC 19, 13-15 July, Lima, Peru, pp. 379- 390
|
3 |
Wambeke, B. W., Hsiang, S. M., and Liu, M. (2011). "Causes of variation in construction project task starting times and duration", J. Constr.Eng. Manage, pp.137(9), 663-677.
DOI
|
4 |
Seppanen, G. Ballard, and S. Pesonen, The Combination of Last Planner System and Location-Based Management System, Lean Construction Journal, (2010) 6 (1), pp.43-54.
|
5 |
Liu, M., and Ballard, G. (2009). "Factors affecting work flow reliability-A case study." Proc. of the 17th Annual Conference of the International Group for Lean Construction, National Pingtung Univ. of Science & Technology, Taiwan, , pp.657-666.
|
6 |
Hopp, W.J., and Spearman, M.L. (2008). Factory Physics, 3rd Ed., Irwin/ McGraw-Hill, Boston,720 pp.
|
7 |
Hamzeh, F.R. (2009). Improving Construction Workflow - The Role of Production Planning and Control, PhD Dissertation, University of California at Berkeley, Berkeley, CA, 273.
|
8 |
Ballard, G., Kim, Y.W., Jang, J.W., and Liu, M. (2007). Road Map for Lean Implementation at the Project Level, Research Report 234-11, Construction Industry Institute, The University of Texas at Austin, Texas, USA, 426.
|
9 |
Sacks, R., and Goldin, M. (2007). "Lean management model for construction of high-rise apartment buildings", J. Constr. Eng. Manage., 133(5), pp.374-384.
DOI
|
10 |
Ballard, G., & Howell, G. (2004). An Update on Last Planner, Proc. 11th Annual Conf. Intl. Group for Lean Construction, Blacksburg, Virginia, USA, 13.
|
11 |
Liker, J. (2004). The Toyota Way, McGraw-Hill, New York.
|