• 제목/요약/키워드: work package

검색결과 386건 처리시간 0.025초

trunmnt: An R package for calculating moments in a truncated multivariate normal distribution

  • Lee, Seung-Chun
    • Communications for Statistical Applications and Methods
    • /
    • 제28권6호
    • /
    • pp.673-679
    • /
    • 2021
  • The moment calculation in a truncated multivariate normal distribution is a long-standing problem in statistical computation. Recently, Kan and Robotti (2017) developed an algorithm able to calculate all orders of moment under different types of truncation. This result was implemented in an R package MomTrunc by Galarza et al. (2021); however, it is difficult to use the package in practical statistical problems because the computational burden increases exponentially as the order of the moment or the dimension of the random vector increases. Meanwhile, Lee (2021) presented an efficient numerical method in both accuracy and computational burden using Gauss-Hermit quadrature. This article introduces trunmnt implementation of Lee's work as an R package. The Package is believed to be useful for moment calculations in most practical statistical problems.

Ergonomic Analysis of Manufacturing Process for PET Bottle by REBA Technique (REBA 기법을 이용한 PET병 제조공정의 인간공학적 분석)

  • Kim, Hwa-Sik;Gong, Byeong-Chae;Cheong, Seon-Hwan;Choi, Seong-Dae
    • Journal of the Korean Society of Industry Convergence
    • /
    • 제12권4호
    • /
    • pp.203-208
    • /
    • 2009
  • Lacks of harmony of a person and machine according to productivity elevation pursuit is happened by enterprise common problem in Global competition age and productivity loss is caused being connected to worker's burden work. Burden work in PET bottle production Process which are arrangement, Packing, interior inspection is analyzed by Ergonomic analysis technique. REBA estimation point(10~11 points) means the high step of hazard on worker's burden. It is immediately required the improvement on the process. This thesis show you the improving methods like package, examination justice.

  • PDF

Probabilistic Applications for Estimating and Managing Project Contingency (확률이론을 이용한 프로젝트 예비비 산정 및 관리)

  • Lee Man-Hee;Yoo Wi-Sung;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.224-227
    • /
    • 2004
  • As a project progresses, it is well known that construction manager has to define the contingency for the expected project cost, which is used as a buffer for uncertainty. In this study, we mention uncertainty as the amount of likelihood that is difficult or impossible to predict project cost. From the completed work package, we obtain the true cost value, and this information is technically good data for estimating the realistic contingency of work packages to be accomplished. Based upon this historical information, construction manager recomputes the contingency for the remaining works. Conditional probability theory is often useful for re-estimating one of the remaining project progress as the true cost of the completed works can be different from the planned cost. As a project is progressing, true value is really important to predict the realistic project budget and to decrease the uncertainty. In this study, we gave applied conditional probability theory to estimating project contingency supposing a project that consists of fire work packages, provide the fundamental framework for setting and controlling project contingency.

  • PDF

Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • 제18권5호
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

The package loading equipment development cutting both ends in the process of packaging lumber for improving the working environments (노동강도 제거 및 양끝정렬 균일화를 위한 양끝절단포장적재시스템 개발)

  • Kang, Ji-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • 제10권2호
    • /
    • pp.95-103
    • /
    • 2008
  • The package loading process of the lumbering industry is an operation that after a pair of workers bind three or six lumbers into one unit and cut both ends of the lumbers, transports the weight cargo of 30-50kg by one meter, pack and load at a height of 1.2 meters. This package loading process causes lots of noise and wood dust when workers carry out the heavy work as the above. Therefore we developed the monolithic both ends cutting package loading equipment in order to prevent from getting musculoskeletal disease. An loading bar working system of this equipment is improved from pneumatic pressure system to oil pressure system, furnished the newly designed flow dividers, and developed the new system that a both end array is loaded identically. Also we developed the safety equipment of loading bar in order to prevent workers mistake and overload from malfunction during the package loading process. The main cause of job evasion on working place could be solved by preventing the musculoskeletal disease and improving the working environments.

SOP Package Modeling for RFIC (SOP RFIC 패키지 모델링)

  • 이동훈;어영선
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • 제36C권11호
    • /
    • pp.18-28
    • /
    • 1999
  • A new equivalent circuit model of package (SOP, Small Outline Package) is presented for designing radio frequency integrated circuits (RFIC). In the RF region, the paddle of a package does not work as an ideal ground. Further parasitics due to both coupling and loss have a substantial effect on MMIC. The equivalent circuit model and parameter extraction methodology for the electrical characteristics of the package are described by illustrating the SOP type packages. The accuracy of the model is evaluated by comparing the s-parameters of the commercial full-wave solver and those of HSPICE simulation with the circuit model. The proposed model shows an excellent agreement with full-wave analysis up to about 8GHz.

  • PDF

The package loading equipment development cutting both ends in the process of packaging lumber for improving the working environments (노동강도 제거 및 양끝정렬 균일화를 위한 양끝절단포장적재시스템 개발)

  • Kang, Ji-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 대한안전경영과학회 2008년도 춘계학술대회
    • /
    • pp.135-147
    • /
    • 2008
  • The package loading process of the lumbering industry is an operation that after a pair of workers bind three or six lumbers into one unit and cut both ends of the lumbers, transports the weight cargo of 30-50kg by one meter, pack and load at a height of 1.2 meters. This package loading process causes lots of noise and wood dust when workers carry out the heavy work as the above. Therefore we developed the monolithic both ends cutting package loading equipment in order to prevent from getting musculoskeletal disease. An loading bar working system of this equipment is improved from pneumatic pressure system to oil pressure system, furnished the newly designed flow dividers, and developed the new system that a both end array is loaded identically. Also we developed the safety equipment of loading bar in order to prevent workers mistake and overload from malfunction during the package loading process. The main cause of job evasion on working place could be solved by preventing the musculoskeletal disease and improving the working environments.

  • PDF

Design and Implementation of Role-Based Access Control Package for Java Applications (자바 애플리케이션을 위한 역할기반 접근제어 패키지의 설계 및 구현)

  • Oh, Se-Jong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제7권6호
    • /
    • pp.1134-1141
    • /
    • 2006
  • Java is platform-independent and supports uniform solutions from mobile area (J2ME) to enterprise area (J2EE), so Java is a good development tool for the environment of heterogeneous machines and distributed applications. Java applications need access control module as a Java package. In this paper, we design and implement it. Therefore Java developers can reduce development time, and system managers easily do access control work. Proposed module is based on Role-Based Access Control (RBAC) model and includes a Java package and administration tool.

  • PDF

Appropriate Package Structure to Improve Reliability of IC Pattern in Memory Devices (메모리 반도체 회로 손상의 예방을 위한 패키지 구조 개선에 관한 연구)

  • 이성민
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 한국전기전자재료학회 2002년도 하계학술대회 논문집
    • /
    • pp.32-35
    • /
    • 2002
  • The work focuses on the development of a Cu lead-frame with a single-sided adhesive tape for cost reduction and reliability improvement of LOC (lead on chip) package products, which are widely used for the plastic-encapsulation of memory chips. Most of memory chips are assembled by the LOC packaging process where the top surface of the chip is directly attached to the area of the lead-frame with a double-sided adhesive tape. However, since the lower adhesive layer of the double-sided adhesive tape reveals the disparity in the coefficient of thermal expansion from the silicon chip by more than 20 times, it often causes thermal displacement-induced damage of the IC pattern on the active chip surface during the reliability test. So, in order to solve these problems, in the resent work, the double-sided adhesive tape is replaced by a single-sided adhesive tape. The single-sided adhesive tape does net include the lower adhesive layer but instead, uses adhesive materials, which are filled in clear holes of the base film, just for the attachment of the lead-frame to the top surface of the memory chip. Since thermal expansion of the adhesive materials can be accommodated by the base film, memory product packaged using the lead-flame with the single-sided adhesive tape is shown to have much improved reliability. Author allied this invention to the Korea Patent Office for a patent (4-2000-00097-9).

  • PDF

Reliability Issue in LOC Packages

  • Lee, Seong-Min
    • Proceedings of the Materials Research Society of Korea Conference
    • /
    • 한국재료학회 1995년도 추계 학술발표 강연 및 논문개요집
    • /
    • pp.3-3
    • /
    • 1995
  • Plastic IC encapsulation utilizing lead on chip(LOC) die attach technique allows higher device density per unit package area, and faster current speed and easter leadframe design. Nevertheless, since the top surface of the chip is directly attached to the area of the leadframe with a double-sided adhesive tape in the LOC package, it tends to be easily damaged by the leadframe, leading to limitation in its utilization. In this work, it is detailed how the damage of the chip surface occurs, and it is influenced and improved by the LOC construct.

  • PDF