• Title/Summary/Keyword: without fire protection

Search Result 104, Processing Time 0.025 seconds

A Study of the Improvement Plan and Real Condition Estimation of Fire Protection Safety Management for Power Plants in Korea (국내발전소 소방안전관리 운영실태조사 및 개선방안에 관한 연구)

  • Kang, Gil-Soo;Choi, Jae-wook
    • Fire Science and Engineering
    • /
    • v.31 no.2
    • /
    • pp.61-73
    • /
    • 2017
  • The Fukushima Nuclear Disaster in 2011 and California Power Failure in 2001 are examples of the importance of the power plant safety management that caused huge national loss with a power-related mass casualty incident. In a situation where humans cannot live without electricity, efforts to strengthen the systematic firefighting safety management in power plants that produce electricity with large amounts of hazardous materials as fuel, such as nuclear energy, coal and gas, are essential to protect life and prevent property loss and stable economic growth from fire explosion accident or radiation leak due to the negligence of safety management and natural disasters such as earthquakes, which has recently become an issue. This study examined the operating situation of firefighting safety management in power plants with firefighting officials employed by five power generation companies including Korea Southern Power Co., Ltd. and Korea Hydro & Nuclear Power Co. Ltd., which are in charge of the domestic power supply. As a result, for the systematic firefighting safety management of power plants, improvement plans were drawn, including the development of an effective business manual and a comprehensive management system, the substantiality of firefighting safety education, and the strengthening of seismic designs to prepare for earthquakes.

A Study for the Fire Analysis and Igniting Cause of Freezing Protection Heating Cables (동파방지열선 화재 흔적분석과 발화원인 연구)

  • Lee, Jung Il;Ha, Kag Cheon
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.3
    • /
    • pp.15-20
    • /
    • 2018
  • There have been a number of major fatal fire accidents in Korea recently. The number of fires in 2017 were 44,178, which is not only increasing number of fires but also increasing in casualties. Particularly, the fire at Jecheon Sports Center, which suffered many casualties, is expected to have a huge impact. The cause of the fire has not been determined yet, but heat waves on the ceiling have also been pointed out. As such, the copper heating waves, which are used as a preventive measure against damage of pipes due to freezing of pipes, etc., always have a fire hazard. To determine the possibility of a flame-resistant heated fire, a positive electric cable product was used to artificially ignite and analyze the results. In case of a short circuit, the external covering of the positive electric cable is damaged, but not short circuit unless the heating material surrounding the wire is damaged. Due to the characteristics of heating cable for preventing copper waves, the chances of insulation becoming more severe due to moisture and temperature changes are higher than normal wires. If the internal heating system is carbonized by insulating deterioration without damage to the outer coating, it is likely to cause trekking, to form a winding loop in the heating materials, and to cause short circuit in the heated materials. For the positive temperature line, if the middle is shorted, the current continues to flow to the short circuit unless the breaker disconnects. Consequently, a heated fire that does not cut off the power immediately may leave multiple marks or cuts.

An Evaluation for the Fire Resistance of Concrete-Filled Steel Square Tube Columns under Constant Axial Loads (일정 축력을 받는 콘크리트충전 각형 강관기둥의 내화성능 평가)

  • Park, Su Hee;Ryoo, Jae Yong;Chung, Kyung Soo;Choi, Sung Mo
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.6
    • /
    • pp.703-714
    • /
    • 2007
  • The aim of this research is to evaluate the fire resistance of concrete-filled steel square tube columns (square CFT columns) under constant axial loads by numerical analysis. The authors examined the experimental results on the fire resistance of concrete-filled steel square tube columns without fire protection. As the materials of CFT columns, steel of SPSR 400 grade and concrete of 27.5MPa and 37.8MPa strengths were used. The significant parameters were determined, such as load ratio, cross-sectional dimensions, and concrete strength. Detailed analytical simulations of fire resistance and axial deformation showed good agreement with the experimental observations. Therefore, this numerical analysis exhibited a reasonable estimation of fire resistance of the square CFT column. Results of the numerical parametric studies showed that the fire resistance of the CFT columns increased with the decrease of the concrete strength and the increase of the cross-sectional dimensions about the constant axial load ratio ($N/N_c$).

Evaluation of the Closed-type Sprinkler Head Activation Time (밀폐형 스프링클러 헤드의 동작시간 평가)

  • Moon-Hak, Jee;Sung-Yull, Hong
    • Fire Science and Engineering
    • /
    • v.18 no.3
    • /
    • pp.1-8
    • /
    • 2004
  • As a predominant active fire suppression method, closed-type sprinkler systems are used for the purpose of fire control and suppression at the nuclear power plants as well as the industrial facilities. It goes without saying that the proper selection of the system guarantees the adequate actuation of the thermal device. Consequently, the appropriate evaluation should be executed for the thermal behavior with the theoretical and empirical approach. For this purpose, the comparison of activation time for the fusible-link type sprinkler head with the simplified fire case and t-square fire growth case was evaluated. At this paper, the comparison output was presented with the tendency of thermal behavior. In addition, we issued some technical comments for the most appropriate equation in case of the estimation of the sprinkler head activation time. We also raised some idea that should be incorporated for the usage of the t-square equation for the realistic application in the field of the performance-base fire protection approach.

A Research on Thermal Properties & Fire Resistance of A Water Film Covered Glazing System for Large Atrium Space (대규모 아트리움에 적용되는 수박형성 유리벽의 열적 특성 및 내화성능에 관한 연구)

  • 박형주;지남용
    • Fire Science and Engineering
    • /
    • v.13 no.4
    • /
    • pp.38-55
    • /
    • 1999
  • In order practically to use fire-defective glazing materials for the compartment wall where a fire-protection rating is mandated, there have been many trials internationally, This research focuses on a feasibility that, if certain water film covered all surface of glass, the glazing system can endure without breaking out under the compartment fire. First of all, a water film spray system was specially designed to wet the entire surface of the glass and also to have tiny small amount of water rebounded from the surface after emitted from nozzles. After this system has proven to have perfect performance, small-scale tests were done to find out if the water film covered glazing system react to the high temperature curve in a small furnace room. Finally, on basis of the obtained data, full-scale experiments were done so that water-film covered glazing system can pass the Korean Standard (KS) test for fire resistance, KS F2257.

  • PDF

A Study on the Development of Fire Extinguishing Agent and Extinguishing System for ESS Fire (ESS 화재전용 소화약제 및 소화시스템 개발에 관한 연구)

  • Lee, Yeon-Ho;Lee, Joo-Hyung;Kim, Soo-Jin;Chon, Sung-Ho;Choi, Byoung-Chul;Oh, Seung-Ju;Kim, Si-Kuk
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.147-155
    • /
    • 2020
  • This paper presents a study on the development of a fire extinguishing agent and extinguishing system for an energy storage system (ESS) fire. The fire extinguishing agent designed to extinguish an ESS fire is a highly permeable fire extinguisher that reduces the surface tension and viscosity while bringing about cooling action. This is the main extinguishing effect of this type of wetting agent, which displays the characteristics of fire extinguishing agents used for penetrating the battery cells inside the ESS module. For the fire extinguishing system, a local application system was designed to suppress fire on a rack-by-rack basis. A 360° rotating nozzle was inserted into the rear hall of the ESS module, and general nozzles were installed in the rack to maximize the fire extinguishing effect. The fire extinguishing agent was strongly discharged by virtue of the gas release pressure. Experiments on fire suppression performance with ESS module 1 unit and module 3 units showed that all visible flames were extinguished in 8 s and 9 s, respectively, by the fire extinguishing agent. In addition, based on confirming reignition for 600 s after the fire extinguishing agent was exhausted, it was confirmed that the ESS fire was completely extinguished without reignition in all fire suppression performance experiments.

Analysis of evacuation time for New publicly used establishments according to whether safety facilities, etc. are installed

  • Hong-Sang Lee;Ha-Sung, Kong
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.2
    • /
    • pp.49-59
    • /
    • 2023
  • In accordance with the revision of "Special act on the safety control of publicly used establishments", this study is aim to measure the change in evacuation time due to whether safety facilities, etc. are installed of a room escape cafe business and kids cafe business(hereinafter referred to as "New publicly used establishments"), which were added as new targets of the publicly used business from June 8, 2022. In the case of new publicly used establishments or publicly used establishments whose owners are changed after the revision of the relevant laws, safety facilities, etc. are installed and maintained under the "Special act on the safety control of publicly used establishments", but in the case of existing businesses that have been operating even before the revision of the law, the business continues without safety facilities, etc. installed because the revised law is not retroactively applied. The purpose of this study is to compare and analyze the change in evacuation time by measuring the evacuation time to operating before the revision of the law to simulate evacuation at existing new publicly used establishments without safety facilities, etc. and measure the evacuation time at new publicly used establishments with safety facilities after the revision of the law

Study of the Standard Testing Specifications for a Non-loading Performance Evaluation of Coating Material-sprayed Circular Steel Structures (뿜칠 피복 원형 철골구조의 비재하 내화성능 평가용 시험체 제안을 위한 연구)

  • Ok, Chi-Yeol;Kim, Jae-Jun
    • Fire Science and Engineering
    • /
    • v.30 no.3
    • /
    • pp.7-15
    • /
    • 2016
  • The cross-sectional shape factor is used worldwide to evaluate the scientific performance of fire-resistant structures. In South Korea, however, a system for applying a cross-sectional shape factor has not been arranged and circular or rectangular steel pipes are commonly used for large-scale steel frame buildings. On the other hand, coating material-spray steel beams and pillars that have received the certification of a fire-resistant structure from recognized organizations are mostly limited to a H-beam. A H-beam is granted a wide range of certifications without size limitations from a non-loading performance test with test standards based on the relevant provisions. Other types of steel pipe are to be certified for fireresistance according to shape. In this study, a cross-sectional shape factor was used to propose standard testing specifications for the application of coating material-sprayed circular and rectangular steel pipes, eventually to set the scope of certification for reasonable fire-resistant structures.

Relationship between Autoigniton Temperature(AIT) and Ignition Delay Time for Acids (산(Acid)류의 자연발화온도와 방화지연시간의 관계)

  • 하동명
    • Fire Science and Engineering
    • /
    • v.18 no.2
    • /
    • pp.27-33
    • /
    • 2004
  • An accurate knowledge of the AIT(Autoignition temperatures) of chemicals is important in developing appropriate prevention and control measures in industrial fire protection. The AITs describe the minimum temperature to which a substance must be heated, without the application of a flame or spark, which will cause that substance to ignite. The measurement AITs are dependent upon many factors. namely initial temperature. pressure, volume, fuel/air stoichiometry. catalyst material, concentration of vapor, ignition delay time. This study measured the AITs of acids from ignition delay time by using ASTM E659-78 apparatus which was produced in the year 1994. The experiment AITs were a good agreement with the calculated AITs by the proposed equations with a few A.A.P.E.(average absolute percent error) and A.A.D.(average absolute deviation).

A Study on Measurement of Length and Slope of Temporary Structure using UAV (무인항공기를 활용한 가설구조물의 길이와 기울기 측정에 관한 연구)

  • Min-Guk, Kang;Seung-Hyeon, Shin;JongKeun, Park;Jeong-Hun, Won
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.89-95
    • /
    • 2022
  • A method for measuring the length and slope of a temporary structure using an unmanned aerial vehicle (UAV) and 3D modeling method is proposed. The actual length and slope of the vertical member of the specimen were measured and compared with the measured values obtained by the proposed method for the specimens with and without the vertical protection net installed. Based on the result of measuring the length of the temporary structure specimen using the UAV and 3D modeling method, the measured value showed an error of 0.87% when compared to the actual length in the specimen without the vertical protection net installed. In addition, the error of the slope was 0.63°. It was thought that the proposed method could be usable for the purpose of finding parts in wrong installation state on the temporary structure and informing the manager in charge. However, in the case of the specimen with the vertical protection net, the measurement showed a 1.46% error in length and 2.77° difference in slope. Therefore, if a vertical protection net is to be installed in a temporary structure, the measurement accuracy should be improved by utilizing an image processing method, etc.