• Title/Summary/Keyword: well completion

Search Result 440, Processing Time 0.031 seconds

Introduction to 1M telescope of Deokheung Optical Astronomy Observatory, National Youth Science Center (NYSC)

  • Kang, Wonseok;Lee, Sang-Gak;Kwon, Sun-Gill
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.1
    • /
    • pp.86.4-87
    • /
    • 2015
  • We will soon complete the installation of 1m telescope at Deokheung Optical Astronomy Observatory (DOAO), National Youth Space Center (NYSC). Before the test observation with NYSC 1m telescope, we present the specs of the 1M telescope and observational conditions of the DOAO site, such as the seeing data at DOAO and the atmospheric extinction coefficients obtained from the observations of standard stars and stellar clusters with 120mm and 150mm refractor in 2014. Since atmospheric extinction coefficients depend on the observational instruments as well as the atmospheric conditions of the site, the improved data with NYSC 1m telescope will be obtained right after the completion of 1M telescope installation. We are planning to invite all astronomers to use 1m telescope for their sciences via regular proposal processes in this year.

  • PDF

A Computational Analysis and An Experimental Study on the effects of Concrete Shrinkage and Creep in Bridge Widening (교량 확폭시 콘크리트의 건조수축 및 크리이프의 영향에 관한 실험적 연구 및 해석)

  • 장동일;조병완;홍성욱
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1994.04a
    • /
    • pp.163-170
    • /
    • 1994
  • The widening of bridges under traffic condition brings to many problems. One of these is the internal stresses caused by different creep and shrinkage behavior of the existing bridge and that of the widened Bridge. This study was conducted to examine the effects of different creep and shrinkage behaviors between concretes. The results are as follows; Comparing the computational analysis results with the experimental study, it is shown that finite element analysis used in this study was well accorded with experimental results. And considering the shrinkage effects in widened bridges, joining-construction using the expanding concrete between the existing and widened bridge after at least three months from the day of completion of new bridge, is recommended.

  • PDF

Development of Program for K-RBI (한국형 위험기반검사(K-RBI) 프로그램 개발)

  • Kwon, Hyuck-Myun;Yim, Dae-Sik
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.1 s.244
    • /
    • pp.90-96
    • /
    • 2006
  • Since Risk Based Inspection(RBI) was introduced to quality the risks for jet engine and nuclear power, the technique has been expanded to the area of petrochemical plant. Recently among USA and Europe, window-based computer programme for RBI has been rapidly developed. When local companies procure such program to apply to their plants, it is difficult to build up a proper database as well as expect a good result. In this regards, K-RBI programme accustomed to Korean environments was developed. After completion of the programme in 2004, it was tested by 2 local petrochemical plants and was produced fruitful results. By using these programme, we are expecting accident prevention through risk based planning and implementing of equipment inspection, and saving dollars caused by procuring foreign expensive programme.

Design System Development of the Modular Jig & Fixture (모듈러 지그와 픽스쳐의 설계 시스템 개발)

  • Jung H.S.;Lee W.R.;Park J.M.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.714-717
    • /
    • 2005
  • The concept of jigs and fixtures makes it possible to build fixtures that can be dismantled at project completion. Since this concept is modular, it is not limited to any particular unit shapes or sizes. Various standards assure that each component assemble rapidly, to get precision and accuracy. Best suited for prototype and low volume production, as well as, start-up or zero-runs, it can also substitute for damaged dedicated fixtures to minimize down-time. It need to do DB for each part by Pro/Engineer and to assemble before manufacturing. In the future will assemble each of clamping and position parts by automation.

  • PDF

A Study on Effect of PWHT on Mechanical Properties of Overlaid Weld Metal in Duplex Stainless Clad Vessel (이상 스테인리스 Clad강 육성 용접부의 기계적 성질에 미치는 후열처리의 영향에 관한 연구)

  • Seo Chang Gyo;Kim Yeong Il;Seong Hui Jun;Kim Dae Sun
    • Proceedings of the KWS Conference
    • /
    • v.43
    • /
    • pp.174-176
    • /
    • 2004
  • The duplex stainless clad vessel with 38m & over thickness shall be performed to PWHT based on the ASME code. In this case, it is well-known that precipitators such as carbides and sigma($\sigma$) phase are formed at gram boundary between ferrite and austenite phase. Therefore, a weld test for simulating this situation has been planned and performed by 3309LMo71-1 for barrier layer and E2209Tl-1 for 2nd & over layer and then carried out to investigate the overlaid weld metal. Based on the test results, it could be concluded that PWHT should be carried out after the completion of 1st(barrier) layer and then 2 & over layer should be applied.

  • PDF

Factors Affecting Timely Completion of Construction Projects in Nepal

  • Acharya NirmalKumar;Lee Young-Dai;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF

Fingerprint Minutiae Matching Algorithm using Distance Histogram of Neighborhood

  • Sharma, Neeraj;Lee, Joon-Jae
    • Journal of Korea Multimedia Society
    • /
    • v.10 no.12
    • /
    • pp.1577-1584
    • /
    • 2007
  • Fingerprint verification is being adopted widely to provide positive identification with a high degree of confidence in all practical areas. This popular usage requires reliable methods for matching of these patterns. To meet the latest expectations, the paper presents a pair wise distance histogram method for fingerprint matching. Here, we introduced a randomized algorithm which exploits pair wise distances between the pairs of minutiae, as a basic feature for match. The method undergoes two steps for completion i.e. first it performs the matching locally then global matching parameters are calculated in second step. The proposed method is robust to common problems that fingerprint matching faces, such as scaling, rotation, translational changes and missing points etc. The paper includes the test of algorithm on various randomly generated minutiae and real fingerprints as well. The results of the tests resemble qualities and utility of method in related field.

  • PDF

Proteomic Studies in Plants

  • Park, Ohk-Mae K.
    • BMB Reports
    • /
    • v.37 no.1
    • /
    • pp.133-138
    • /
    • 2004
  • Proteomics is a leading technology for the high-throughput analysis of proteins on a genome-wide scale. With the completion of genome sequencing projects and the development of analytical methods for protein characterization, proteomics has become a major field of functional genomics. The initial objective of proteomics was the large-scale identification of all protein species in a cell or tissue. The applications are currently being extended to analyze various functional aspects of proteins such as post-translational modifications, protein-protein interactions, activities and structures. Whereas the proteomics research is quite advanced in animals and yeast as well as Escherichia coli, plant proteomics is only at the initial phase. Major studies of plant proteomics have been reported on subcellular proteomes and protein complexes (e.g. proteins in the plasma membranes, chloroplasts, mitochondria and nuclei). Here several plant proteomics studies will be presented, followed by a recent work using multidimensional protein identification technology (MudPIT).

Prediction and Reduction of Medium Speed Diesel Engine Vibration using Database (중속디젤엔진 진동 DB 를 이용한 진동 예측과 저감)

  • Kim, Won-Hyun;Lee, Tae-Kyoung;Jung, Kun-Hwa;Lee, Kun-Hee;Bae, Jong-Gug
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.399-406
    • /
    • 2007
  • Structural vibrations of generator sets with medium speed diesel engine mainly come from the resonance between the excitations of engine and natural modes of system. The countermeasures to reduce the vibration or to avoid the resonance are fairly well known to workers. However these processes which are applied after the completion of system need much time consumption and additional cost. In this paper, the vibration measurement results collected for about 8 years were compiled as Database. Based on the database, the change of vibration was predicted with respect to variation of system such as engine type, generator weight, mount stiffness, and etc. As results of study, this paper presents the anti-vibration design procedures of newly composed generator sets using Database in the initial design stage and their effects.

  • PDF

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.453-456
    • /
    • 2007
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF