• Title/Summary/Keyword: web-based construction management system

Search Result 227, Processing Time 0.027 seconds

Web-based Performance and Informatization Measurement System for the Construction Industryz (건설산업의 성과 및 정보화수준 평가를 위한 웹기반 시스템)

  • Yu, Il-Han;Kim, Kyung-Rai;Jung, Young-Soo;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.92-97
    • /
    • 2006
  • The construction industry has mainly relied on financially focused performance measurements, and studies on performance measurement systems (PMSs) have been carried out at the project level. However, recently, the demand for performance evaluation and management at the company level has increased. A few previous efforts have aimed to develop a conceptual model for company performance, but there have been few follow-up studies. From this perspective, we have developed a web-based performance and informatization measurement system to measure and compare the business performance and the level of informatization of construction companies. Then, we carried out a performance evaluation and system test using the data set of 78 Korean construction companies and identified practical issues for the implementation of our PMS.

  • PDF

Designing Cost Effective Open Source System for Bigdata Analysis (빅데이터 분석을 위한 비용효과적 오픈 소스 시스템 설계)

  • Lee, Jong-Hwa;Lee, Hyun-Kyu
    • Knowledge Management Research
    • /
    • v.19 no.1
    • /
    • pp.119-132
    • /
    • 2018
  • Many advanced products and services are emerging in the market thanks to data-based technologies such as Internet (IoT), Big Data, and AI. The construction of a system for data processing under the IoT network environment is not simple in configuration, and has a lot of restrictions due to a high cost for constructing a high performance server environment. Therefore, in this paper, we will design a development environment for large data analysis computing platform using open source with low cost and practicality. Therefore, this study intends to implement a big data processing system using Raspberry Pi, an ultra-small PC environment, and open source API. This big data processing system includes building a portable server system, building a web server for web mining, developing Python IDE classes for crawling, and developing R Libraries for NLP and visualization. Through this research, we will develop a web environment that can control real-time data collection and analysis of web media in a mobile environment and present it as a curriculum for non-IT specialists.

Development of Labor Management System Based on RFID Technology for Construction Field (RFID기술을 활용한 건설현장의 노무관리시스템 프로토타입구축)

  • Han, Jae-Goo;Kwon, Soon-Wook;Cho, Moon-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.853-858
    • /
    • 2007
  • Construction industry is traditionally labor intensive. And construction site is also in densely populated environment. So accurate labor monitoring is one of important issues for site management. Labor cost shares large amount of part in total construction cost. Therefore, it is a major element in site management and control. In this article, we explained development of prototype system for labor monitoring based on RFID technology and results of field tests using the system. According to the results, the system is able to expected to improve effectiveness of Labor management in construction site

  • PDF

Construction of Truss Bridge Database for 3-D Shape and Structural Analysis Information by using ISO10303 Application Protocols (ISO10303 응용프로토콜을 이용한 트러스교의 3차원 형상 및 해석정보 데이터베이스 구축)

  • Lim, Seung-Wan;Kim, Bong-Geun;Kim, Hyo-Jin;Lee, Sang-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.1
    • /
    • pp.81-89
    • /
    • 2009
  • A web-based information management system to share engineering data of truss bridge is developed through construction of standardized database of truss bridge. 3D shape information is stored in database according to AP 203 of STEP, and 3D visualization on the web is implemented by using the web 3D technology that helps users to understand geometrical shape of structures, directly. AP209 is used to store structural analysis information such as finite elements, material properties, and analysis result into relational database. Based on the developed database, a prototype of integrated information management system for truss bridge is developed, and it provides additional information such as specifications and inspection information related with shape object to end users.

  • PDF

Development of the Railroad Geotechnical Information Management System using Web GIS (Web GIS를 이용한 철도 지반정보 관리프로그램의 개발)

  • Hwang Seon-Keun;Lee Seong-Hyeok;Kim Hyun-Ki;Kim Jung-Moo
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.326-330
    • /
    • 2003
  • The purpose of this study was to develop railroad geotechnical management system using Web GIS and the DB used in system included railroad informations and digital maps. Digital maps are primarily based on a topographical map(NGIS, 1:5000) and by adding digital maps(KRRI, 1:5000) and their spatial database system to NGI code layer, the management system was developed. The system was connected to geotechnical database already developed. The system was able to separate three parts which were layer choice, geotechnical information view and geotechnical analysis and it was possible to save geotechnical and spatial informations using ZEUS DB simultaneously. ZEUS/X was used for usefulness of GIS operation and by offering GUI, user interface for facility was achieved. Geotechnical and spatial informations in this system will provide basic data for plans, design and construction of railway lines in practical use.

  • PDF

A Handwritten Document Digitalization Framework based Defect Management System in Educational Facilities (수기문서 전자화 프레임워크 기반의 교육시설 하자관리 시스템)

  • Son, Bong-Ki
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.3
    • /
    • pp.1-11
    • /
    • 2010
  • In the construction industry, IT based information system has been diversely applied to increase productivity. Although IT device such as PDA, RFID, Barcode, wireless network and web camera has been introduced to gather information in construction site, the effect of the IT device is limited, because of bringing about additional works of engineer. In this paper, we proposed a defect management system which is based on handwritten document digitalization framework for introducing applicability of new IT device, digital pen. By the proposed system, we can effectively gather and input defect information to defect management system by using digital pen and paper like conventional way. Applying the data gathering device, digital pen to defect management, it is able to increase productivity by improving work process, building up and utilizing defect information database of good quality.

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF

Diligence and Indolence Management System for Specialty Contractor on Construction Site -Using GPS of Smart Phone- (스마트 폰의 위성항법시스템(GPS)를 활용한 전문건설업체 현장 근태관리 체계 구축)

  • Ahn, Chi-Sun;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.56-66
    • /
    • 2012
  • The Recent Specialty Contractor in construction of the reduced quantity due to the recession, but competitive in order to increase the number of companies that are increasingly competitive. The field work of one person to perform the work of employees and multiple sites, workforce supply flow that occurs at each stage of information transfer is not made a late staffing. Therefore this research has proposed a new alternative that can overcome them and the entire industry in recent issue smart phone features that take advantage of GPS(Global Positioning System). This paper presents a Diligence and Indolence Management System using GPS of smart phone. offering the advantage of Web-based PMIS(Project Management Information System) through integration with real-time information transfer and smart phone applications for query by building a prototype of a professional construction company as their own on-site management measures are proposed to contribute time and attendance.

Quantification Model for Applying Construction Management Practices in Consideration of Project Characteristic Factors

  • Cha, Hee Sung;Kim, Jin Lee
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.35-38
    • /
    • 2013
  • No single project is identical to one another in the construction industry. Furthermore, many construction projects are suffering from tighter budget, shortened schedule and higher client satisfaction level. To overcome these, project managers and engineers are willing to apply various best management practices to their projects. However, it is non-trivial to select the most appropriate practices for their projects. In many cases, it is much more important to find the appropriateness of the management practices than just to use the practices. Although many researchers are focusing on the development of new management practices, there is little research on matching between the circumstances of projects and the developed management practices. The objective of this study is to provide a structured process to suggest the best management practices for individual construction projects by developing a computerized system where an individual project is matched with the most optimal management practices to increase the value of the project. At this stage of writing, the authors have developed a computerized system to effectively find out the best suitable management practices for individual projects. By maximizing the usages of this system, it would facilitate the application of the best management practices in the industry.

QUANTIFICATION MODEL FOR APPLYING CONSTRUCTION MANAGEMENT PRACTICES IN CONSIDERATION OF PROJECT CHARACTERISTIC FACTORS

  • Hee Sung Cha;Jin Lee Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.624-627
    • /
    • 2013
  • No single project is identical to one another in the construction industry. Furthermore, many construction projects are suffering from tighter budget, shortened schedule and higher client satisfaction level. To overcome these, project managers and engineers are willing to apply various best management practices to their projects. However, it is non-trivial to select the most appropriate practices for their projects. In many cases, it is much more important to find the appropriateness of the management practices than just to use the practices. Although many researchers are focusing on the development of new management practices, there is little research on matching between the circumstances of projects and the developed management practices. The objective of this study is to provide a structured process to suggest the best management practices for individual construction projects by developing a computerized system where an individual project is matched with the most optimal management practices to increase the value of the project. At this stage of writing, the authors have developed a computerized system to effectively find out the best suitable management practices for individual projects. By maximizing the usages of this system, it would facilitate the application of the best management practices in the industry.

  • PDF