• Title/Summary/Keyword: waterproofing leakage

Search Result 83, Processing Time 0.029 seconds

A Study on the Field Application Analysis for High Adhesive Spray Type of Degenerated and Rubberized Asphalt Membrane Material (스프레이식 고점착 변성 고무 아스팔트 도막 방수재의 현장 적용성 평가에 관한 실험적 연구)

  • Oh, Sang-Keun;Kwak, Kyu-Sung;Choi, Sung-Min;Song, Je-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.85-92
    • /
    • 2006
  • Urethane, epoxy, acrylic have common property to adhere on the concrete dried surface in the waterproofing materials at present. In the wet condition, however, the materials such as urethane, epoxy, acrylic need a long hardening time and it become a reason of water leakage as the materials breaking down. it is one of the problem to adhere to the substrate. Therefore, in this thesis, I focused to assure the structural safety and durability and quality for waterproofing and safe of construction cost by cut down the cost of labor and reduce the term of works as searching the application of field condition for high adhesive spray type of degenerated and rubberized asphalt membrane material.

Waterproofing performance evaluation according to each waterproofing material due to segment construction error (세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가)

  • Heo, Seung-Mu;Jung, Hoon;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1023-1037
    • /
    • 2018
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop and gasket, respectively by the construction error and excessive displacement of segment was studied. The test results show that hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap. On the other hand, gasket has unfavorable on the offset, however favorable on the gap.

Drainage system for leakage treatment of cement concrete structure in underground (콘크리트 지하구조물 누수 처리를 위한 유도배수시스템)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.573-585
    • /
    • 2019
  • The objective of this study is to propose the drainage system that has been improved the workability, waterproofing and drainage performance to treat the leakage from the cement concrete structures in underground. It is improved that the pipe for conveying ground leak in the existing drainage system had the problem in workability and waterproof. The drainage systems with the improved pipe for conveying ground leak were constructed in conventional concrete lining tunnels to evaluate the workability, waterproofing and drainage. The waterproof and the drainage performance of the drainage system was evaluated by injecting 1,000 ml of red water in the back of the drainage system at 3 weeks, 6 weeks, 9 weeks, 11 weeks, 14 weeks, 17 weeks and 23 weeks. During 6 months of field performance test, the average daily temperature of the tunnel site was measured from $-12.4^{\circ}C$ to $19.7^{\circ}C$. The daily minimum temperature was $-17.2^{\circ}C$ and the daily maximum temperature was $26.7^{\circ}C$. There was no problem in waterproof and drainage performance on the pipe for conveying ground leak and the drainage system during 6 months for field performance test. It is concluded that the improved drainage system can be applied to various cement concrete underground structures where leakage occurs, and has little seasonal effect.

Effect of freezing and thawing on the drainage system for leakage treatment (유도배수공법에서 동결융해의 영향)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.1059-1075
    • /
    • 2017
  • The objective of this study was to evaluate the freezing and thawing resistance of the existing drainage system for leakage treatment of underground concrete structures operating in cold regions. The freezing and thawing test was conducted on 4 types of drainage system specimens to evaluate the freezing and thawing resistance of the drainage system. The freezing and thawing resistance was evaluated on 4 types of Hotty-gel, as a waterproofing material, connection methods and on two methods to fix the drainage board with Hotty-gel on the surface of cement concrete specimen. One cycle of the freeze-thaw testing was 48 hours (24 hours of freezing and 24 hours of thawing), and the temperatures of freezing and thawing were at $-18^{\circ}C$ and $10^{\circ}C$, respectively. Among the 4 types of Hotty-gel connection methods, leakage occurred after 28 cycles (8 weeks) of freeze-thawing only in the Hotty-gel connection method with the 'V' groove applied to the corner of the drainage board. No leakage occurred in the 3 types of Hotty-gel connection methods. In two fixing methods, leakage occurred in the method of fixing the drainage board on the cement concrete specimen using the washer, screw and plastic wall plug. Leakage occurred at one point after 10 cycles (3 weeks) of freezing and thawing. After 28 cycles (8 weeks) of freezing and thawing, leakage point increased to 5 points. As time passed, the leak point was not increased, but the amount of leakage was increased at each leak point. The Hotty-gel connection method with cross-sectional diagonal shape was evaluated to be the highest in the production efficiency considering the production time and manufacturing method of the Hotty-gel connection shape. In the construction efficiency considering the construction time and construction method, the fixing method of air nailer, fixed nail and washer was superior to that of the washer, screw and plastic wall plug.

Analysis of the Cause of Waterleakage in Residential Apartment Underground Parking Ground and the Review of the Repare Methods (공동주택 지하주차장의 누수원인 분석 및 보수방안 검토)

  • Oh, Sang-Keun;Choi, Sung-Min;Song, Je-Young
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.3
    • /
    • pp.255-264
    • /
    • 2014
  • This study analyzes the cause and the repairing method of water leak by parts of basement parking lot which is recorded to have a high defect frequency in apartment buildings. It has been assessed that the cause of water leakage on the first floor upper substrate is due to such factors as landscaping and weights. During construction or through other cases, it has been determined that cracks were produced in the apartment structure because the structure was weak and exposed to the effects of the substrate movement. The base floor and underground external walls are areas that are exposed to water pressure (uplife pressure), thus in normal cases the rear surface repair of the structure using sythetic rubberized polymer gel should be considered as an effective method. However, in cases where application of waterproofing layer is required in the structure due to high water pressure, using asystolic cement milk grout to form the waterproofing layer and applying water-swelling acrylic material into the cracked areas is considered to be highly effective.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Technical Index for the Maintenance of Watertightness of the Roof of a Large-Span Membrane Structure (대공간 막 구조물 지붕의 수밀성능 확보를 위한 유지관리 지표 연구)

  • Oh, Sang-Keun;Kim, Dong-Bum;Lee, Sun-Gyu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.51-59
    • /
    • 2011
  • With the increased demand for membrane structures in recent years, there have been many studies of their mechanical properties, to the extent that such structures have become recognized as independent structures with a level of safety and durability comparable to those of other general structures. But in reality, the study for the maintenance of membrane structures has not been as active. In particularly, the study of watertightness from the perspective of maintenance has been very limited. Accordingly, a study on securing watertightness performance and the guidelines for maintenance is necessary. In this study, through a case study of water leakage accidents in membrane structures overseas, causes of leakage were selected from the membrane material itself, joint parts and open door of roof part in membrane structure. The water leakage and deterioration elements were analyzed from those leakage causes. The degree of importance of the water leakage and deterioration index was also designated using the AHP (Analytic Hierarchy Process) method. As a result, the basic technical index was suggested for the maintenance of the roofs of large-span membrane structures to prevent water leakage. This index will be used to make a guideline for the long-term maintenance of the roofs of large-span membrane structures.

Analysis on the Causes of the Oil Leakage Phenomenon for Complex Waterproofing Methods of Asphalt Mastic and Modified Asphalt Sheet (콘크리트 구조물에 사용되는 개량아스팔트 시트와 아스팔트 매스틱을 복합화한 방수공법의 누유현상 원인 분석)

  • Park, Jin-Sang;Kim, Dong-Bum;Park, Wan-Goo;Oh, Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.337-345
    • /
    • 2018
  • In this study, observations of oil leakage samples taken from the actual site were performed to identify the causes of the oil leakage phenomenon. As a result, the separation of the material components was determined as the main cause of the oil leakage phenomenon based on the changes in the surface conditions, and verification of this was conducted. The evaluation results confirmed that the filler component of the asphalt mastic subsided with the lapse of the settling time, and that the difference ratio of the filler contents of the upper and lower specimens was up to 23.8% after day 28. Based on these results, a hypothesis on the oil leakage mechanism of asphalt mastic was established, and then modeling of the entire process of oil leakage was performed.

A Stduy on the Self Healing Performance of Acrylate at Elevated Tmeperature (아크릴레이트의 온도별 자가 보수 성능에 관한 연구)

  • Yoon, Jun-No;Park, Wan-Goo;Choi, Su-Young;Kim, Dong-Bum;Kim, Byoung-Il;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.175-176
    • /
    • 2018
  • In this study, the performance of acrylate was evaluated by using acrylate composite waterproof sheet. Through this experiment, the waterproof sheet plays a primary role of waterproofing. When the water leakage occurs, the acrylate reacts with water and expands, and the performance of the self repairing of the damaged part is confirmed by temperature.

  • PDF

An Experimental Study on Improving Water Tightness of Concrete Surface Applied High Growth Organic Crystalization Material (고성장 유기결정체의 성장 특성을 이용한 콘크리트 표층부의 수밀성 개선에 관한 연구)

  • Song Je-Young;Kang Hyo-Jin;Oh Sang-Keun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.817-820
    • /
    • 2004
  • Our country was much developments in change of construction environment along with fast economy development. But, various problems that must think in problem of safety and quality were appeared. Constructions which build through rapid economy development are getting many social criticisms to problem of crack and water leakage at use process. Is situation that huge repair expense to cure this is engaged. Safety problem of construction is indicated socially through various media mediums again.

  • PDF