1 |
Choi, W.Y., Lee, H.P., Jun, G.C., Lee, S.W. (2014), "Evaluation of waterproof and durability of hydrophilic waterstop", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 2, pp. 117-124.
DOI
|
2 |
Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012), "Risk management applicable to shield TBM tunnel: I. Risk factor analysis", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 6, pp. 667-681.
DOI
|
3 |
Kim, S.H., Kim, W.K., Lee, H.Y. (2013), "Effect of segment thickness during shield TBM tunnelling in case study", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 311-320.
DOI
|
4 |
Kim, Y.I., Hencher, S.R., Yoon, Y.H., Cho, S.K. (2002), "Determination of the construction method for Young Dong tunnel by risk assessment", Journal of Korean Tunnelling and Underground Space Association, Vol. 4, No. 1, pp. 13-25.
|
5 |
Korea Infrastructure Safety Corporation (2013), Development of performance evaluation standard and maintenance manual of special excavation tunnel (shield tunnel).
|
6 |
Lee, S.W., Jeoung, J.H., Hwang, J.H. (2009), "Evaluation of hydrophilic waterstop for shield TBM tunnel under high water pressure", Proceedings of the Korean Geo-Environmental Conference 2009, Seoul, Korea, pp. 389-392.
|