One of the disadvantages of flooding treatment for desalting from soils is that salts move to deep soils after flooding and at the end reaccumulate at the soil surface through capillary movements. This study was carried out to remove salts from soils in plastic film houses by a modified flooding method, drainage after flooding. The method successfully removed salts at the soil surface and salts did not move to the deep soil. Drained water containing N, P and K could be reused as fertilizer. By applying small amount of MgO, turbidity of water flooded decreased in 30 min by 95%. Struvite should be formed since the flooded water contain ammonia and phosphorous and their concentrations were decreased. This could be utilized as fertilizer which provides a slow-release source of phosphorus, magnesium and nitrogen that features low inherent water solubility.
Effect of flooding on the desalting efficiency and the growth of sudan grass, barnyard grass, sesbania and corn was studied in a sandy soil of the Iweon reclaimed tidal land. Flooding plots were treated by 400 (one time flooding), 800 (two times flooding), and 1,200 mm(three times flooding) of water, respectively, and then soil salinities of the treated plots were compared with salinity of the control plot (not flooded) for estimation of desalting effect. Desalting ratio of 1,200 mm treatment was 78.3% for depth 0-20 cm, 70.5% for depth 20-40 cm and 60.8% for depth 40-60 cm, and then the soil salinity reached at 3~6 dS $m^{-1}$. Consequently, it was considered that sandy saline soil was satisfactorily desalted for upland crops to be cultivated by 1,200 mm flooding, but insufficiently desalted by 400 mm and 800 mm flooding because of high salinity ranged 5~14 dS $m^{-1}$ even after flooding treatment. In addition, it was estimated that soil salinity should be controled lower than 7.7 dS $m^{-1}$ in order to obtain more than 80%of crop emergence when four crops are simultaneously cultivated by inter- or mixed cropping in a field. Dry matter yields (kg $10a^{-1}$) was 1,068 for sudan grass, 696for barnyard grass, 1,426 for sesbania, and 1,164 for corn by 1,200 mm flooding treatment, but only 46.8~74.3% by 800 mm flooding treatment and 2.9~25.5% by 400 mm flooding treatment. Therefore, it is concluded that the flooding treatment more than 1,200 mm is necessary for satisfactory desalinization in order for the low salt tolerance crops to be cultivated in the sandy reclaimed tidal land.
Unstable seedling stand establishment of wet direct seeding culture of rice is one of the major elements preventing the extension of its culture area. In order to develop methods of seedling stand improvement in direct seeded rice on flooded surfaces, three field experiments were conducted on silty loam soil using a cultivar 'Donjinbyeo' for three years, mainly focusing on water management after seeding and seed soaking with plant growth regulators (PGRs). Under the condition of shallow flooding after seeding, seedling stand rate increased and floating seedling rate decreased in both early and normal season seeding compared to deep flooding. With earlier draining time after seeding, there was a tendency towards preferential growth of the seminal root, increase of seedling stand and decrease of the floating seedling rate. Therefore the highest seedling numbers per unit area and the lowest floating seedling numbers were found upon drainage at 1 day after seeding (DAS), while a contrary tendency was shown upon conventional drainage at 7 DAS. Seed soaking with PGRs such as Metalaxyl or mixing of Metalaxyl with gibberellic acid (GA$_3$) significantly increased the seedling stand. In addition the effects of PGR treatment on seedling stand and the early growth of plants were greater under flooded conditions than under drained conditions after seeding, although draining of water after seeding improved the seedling establishment rate more when compared with the PGR treatment. These results suggest that draining management after seeding or maintaining of shallow flooding for a week is the most effective method to improve the seedling stand rate in wet direct seeding.
With transient flooding followed by poor or slow drainage plant roots may become reduction conditions because the root zone was fully filled with water. This study was examined the effects of calcium treatment in the early growth stage on biochemical changes in leaves and roots of melon (Cucumis melo L.) seedlings kept under flooding condition for 72 h. The activities of lactate dehydrogenase more gradually enhanced in the roots than those of leaves of melon seedlings treated with calcium. The activities of alcohol dehydrogenase associated with alcohol fermentation under low oxygen conditions continuously increased in the leaves and roots of seedlings untreated with calcium under flooding at least 72 h but those was constant within at least 12 h in treated with calcium. These results showed that calcium supplying in the early growth stage mitigated alcohol fermentation of melon seedlings kept under flooding condition for 72 h. Activities of nitrate reductase and acid phosphatase in the leaves and roots of seedlings in treated with calcium somewhat higher than those of non-treated with calcium. The activities of sucrose phosphate synthase and fructose-1,6-bisphosphatase of leaves of seedlings in treated with calcium more higher than those of non-treated with calcium. These results indicated that calcium nutrition mitigate the reduction of activities of some enzymes of melon seedling kept under flooding condition for 72 h.
This study was conducted in order to obtain the information for yield improvement in saline paddy. Saline concentration, growth and yield of rice, being subjected to different flooding times and days to transplanting were investigated in saline paddy with 0.35 % and 0.5 % salt concentration. Saline concentration of soil was increased to 0.41 % just after rotary in the paddy with 0.35 % salinity, but decreased to 0.20 % after 3 to 4 times of flooding treatment. And also that of surface water was decreased from 0.2 % to 0.11 %. Saline concentration of soil in 5cm depth was decreased to 0.31 % by one time flooding and to 0.22% by 3~4 times flooding but salinity below 7cm depth showed slight decrease. Seedling death was exceeded 37 % when transplanted one day after rotary in the paddy with 0.35% salinity. Death ratio was decreased to 20% by three times flooding and transplanting six days after rotary. In paddy with 0.5 % salinity, death ratio was high but the tendency was very similar to 0.35 % field. In 0.35 % saline paddy field, yields were increased by 14 % by three times flooding and transplanting six days after rotary as compared to one time flooding and transplanting are day after rotary. Therefore, 3 to 4 times flooding and transplanting 5 to 6 days after rotary are desirable in high saline paddy.
As the water supply facilities are recently getting larger, the domestic waterworks become multi-regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment plant and water supply/distribution facilities. Although the pumping stations and the pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. In this paper, the intake pumping station is guaranteed by both the computer simulation and the field test analysis. This study is contributed to the safe operation program for the pumping station in which results of the adjustment on the safety plan of the pumping station, the air valve and the valve closing time.
Water supply facilities are recently getting larger according as domestic waterworks become multi regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment station and water supply & distribution facilities. Although pumping stations and pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. As a result of this study, a pumping station is guaranteed by the computer simulation and field test analysis. Therefore these are contributed safety operation in pumping station through adjustment of the pumping station safety plan, air valve and valve closing time.
Constructed wetlands are considered as an important tool for wastewater treatment, wastewater management and flooding control. In addition, one of the most promising technologies for application in many countries seems to be constructed wetlands, due to their properties such as utilization of natural processes, simple construction, operation and maintenance, process stability, cost effectiveness, etc. This study considered possibility of treatment of livestock wastewater using a constructed wetland. The removal efficiencies of $COD_{cr}$, TOC, TN, TP, SS, and color were 97.6%, 96.6%, 97.0%, 96.7%, 99.0%, and 85.6%, respectively. In particular, SS was completely removed. However, $Cl^{-}$ concentration of the constructed wetland effluent was higher than that in influent. In conclusion, constructed wetlands could be applied to livestock wastewater treatment if $Cl^{-}$ would be properly treated. Further, it needs time for stabilization to reduce the pollutants which were accumulated in soil.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.13
no.2
/
pp.100-108
/
2001
Along the shoreline a special treatment is required to simulate movement of periodic waves such as tsunami and tide because of continuous movement of shoreline as waves rise and recede. A moving boundary treatment is first proposed to track the movement of shoreline in this study. The treatment is then employed to obtain a maximum inundation area to be used for mitigation of coastal flooding. The obtained maximum inundation zone for a specific location is compared to that of available observed data. A reasonable agreement is observed.
All measures to cope with flooding rely on flood predictions to some extent, and the effectiveness of these measures is dependent on the quality of flood predictions. It is important to track properly the movements of the river-bankline in numerical modeling because the location of it varies continuously in the flood inundation. In this study, the wet and dry treatment is used to describe the moving river-bankline accurately (Cho, 1996). An oscillatory flow motion in a parabolic basin is used to validate the performance of the developed model based on quadtree grids. As a result of a simulation, a reasonable agreement is observed with analytical and Cho's results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.