• Title/Summary/Keyword: warranty system

Search Result 126, Processing Time 0.023 seconds

The study on the analysis of quality assurance data (품질보증데이터의 분석방법에 대한 고찰)

  • Baik, Jai-Wook
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.4
    • /
    • pp.621-628
    • /
    • 2010
  • Quality assurance data is used to develop the strategy of the product since it is valuable for reliability assessment of the product. However, manufacturers don't take into account the life of the product but just produce WCR (Warranty Call Rate) which is monthly or quarterly claims per 1000 products in terms of table or graph. In this study we will consider how they analyse that kind of data and suggest an appropriate type of analysis which incorporates the life time of the product. Finally we emphasize that the appropriate type of analysis has to be merged into the.

Parametric Estimation of a Renewal Function

  • Jeong, Hai-Sung;Na, Myung-Hwan
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.81-87
    • /
    • 2000
  • One of the most important quantities in reliability theory is the expected number of renewals of a system during a given interval. This quantity, the renewal function, is used to determine the optimal preventive maintenance policy and to estimate the cost of a warranty. In this paper we study a parametric approach for a renewal function. The simulation study is presented to compare the relative performance of the introduced estimators of a renewal function. And we show that the proposed parametric estimator performs well.

  • PDF

Collaborative Product Development (실시간 협업 분산 설계)

  • 임현욱
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.577-590
    • /
    • 2001
  • Designing Seal Windows System ㆍReduced (by a factor of at least 10) the time for evaluating each design alternative ㆍIncreased quality by 20% (measured as the number of errors that are caught before they propagate) ㆍFound and corrected errors prior to production with an estimated $1-2 million in annual savings in warranty costs ㆍCaptured the state of a design, particularly the parameters that were used to make decisions ㆍEliminated geographic and temporal obstacles ㆍDecreased wasted time caused by slow communication paths(omitted)

  • PDF

New Warranty Model with Varying Usage Intensity

  • Kim, Che-Soong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.3
    • /
    • pp.142-148
    • /
    • 2005
  • 대부분의 일차원 보증정책에 대한 비용분석은 소비자 사용률이 모든 사용자들에게 동이란 것으로 가정하고 있다. 하지만 현실적으로 사용률은 소비자에 따라서 다르기 때문에, 일반적인 경우 소비자 집단을 ${\kappa}$ 범주로 나눌 수 있다. 즉, 동일한 제품에 대해서 생산자는 ${\kappa}$ 범주에 속하는 다른 보증정책을 제시할 수 있고, 보증비용은 이런 옵션들 가운데 소비자가 자기의 입장에 맞는 보증기간을 선택할 수 있다. 본 논문에서는 소비자의 사용률이 변화하는 경우를 고려한 무료보증정책을 갖는 기대보증비용 모형을 분석하고, 이에 따른 수치예제를 제시한다.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Optimal Release times of a Software Cost Model with Consideration of Various Costs

  • Lee Chong Hyung;Jang Kyu Beom;Park Dong Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.251-257
    • /
    • 2005
  • Software system which is essential in operating the computer has gradually become an indispensable element in many aspects of our daily lives and an important factor in numerous systems. In recent years, software cost sometimes exceeds the cost of maintaining the hardware system. In addition to the cost necessary to develop the new software system and to maintain the system, the penalty costs incurred due to software failures are even more significant. In this paper, a cost model incorporating the warranty cost, debugging costto remove each fault detected in the software system, and delivery delay cost is developed. A software reliability model based on non-homogeneous Poisson process(NHPP) is established and the optimal software release policies to minimize the expected total software cost are discussed. Numerical examples are provided to illustrate the results.

  • PDF

Reliability Analysis of Power Conversion System by Test Environments (시험환경에 따른 전력변환장치의 신뢰성 분석 및 검토)

  • Lim, Jong-ung;Yoon, Chun-gi;An, Yoon-Young;Lim, Yong-Bae;Choe, Gyu-Ha
    • Proceedings of the KIPE Conference
    • /
    • 2016.11a
    • /
    • pp.39-40
    • /
    • 2016
  • Power conversion system comes with a twenty-year warranty commonly. Life test requires a long time. The life of power conversion system that especially sensitive to temperature can be expected within a short time by using Arrhenius technique with worst stress condition than actual working condition. This paper researches reliability analysis and environment test of power conversion system.

  • PDF

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

Study on Procedure for Escrow Account to Resolve Controversy of Intellectual Property Right of Software for Rolling Stock (철도차량 Software 지적 재산권 분쟁 해결을 위한 Escrow Account 적용 절차에 대한 연구)

  • Park, Jun-Hyung;Cho, Chi-Hwan;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1479-1485
    • /
    • 2008
  • This paper shows the result of study on the detailed applicable procedure of software Escrow account applied for rolling stock. The customer as end-user requires software source code, related critical technical documents etc. about software based system of train for maintenance purpose through software modification and enhancement after completion of warranty period. Otherwise, it is not easy to keep up with the customer's requirement of demanding supplier's exclusive information because it is considered as intellectual property rights of supplier as software developer. Therefore, the main contractor(normally called as Car-builder) need to introduce software Escrow service in order to coordinate the different a standpoint between software developer and end-user. Software Escrow is a legal arrangement in which an software Escrow packages (software source code, software development tool, build process, proprietary information, copyright and etc.) is deposited into and Escrow account under the trust of a reliable third party (Escrow agent) depending on mutual agreement on Escrow contract condition as signing off Escrow agreement document. This paper deals with the study on the detailed procedure about the following general category of Escrow procedure and purpose to apply this specific procedure of Escrow into the future project onward.

  • PDF

A study on the Problems and Improvement of Export Credit Guarantee System in the Trade Insurance (무역보험의 수출신용보증제도의 문제점과 개선방안)

  • La, Kong-Woo
    • International Commerce and Information Review
    • /
    • v.15 no.1
    • /
    • pp.259-283
    • /
    • 2013
  • In this study has been suggested on the basis of the Court of Audit's report on trade insurance issues presented and the Export Credit Guarantee Insurance Improvement. First, the improvement insurance underwriting standards and come up with measures to improve the soundness of the insurance fund trading. In order to do this, (1) warranty for a lower credit companies strengthen underwriting standards, (2) raise short-term solvency and the accuracy of financial statements Review criteria Borrowings calculated based, (3) trustee companies Warranty Terms for improvement, (4) for closure of businesses quickly take measures of bond conservation measures. Second, through improved risk management measures to strengthen risk management for export credit guarantees are to be provided.

  • PDF