• Title/Summary/Keyword: wall-frame

Search Result 556, Processing Time 0.036 seconds

Influence of Strain-Hardening Cement Composite's Tensile Properties on the Seismic Performance of Infill Walls (변형경화형 시멘트 복합체의 인장성능에 따른 끼움벽의 내진성능)

  • Cha, Jun-Ho;Yun, Hyun-Do
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.1
    • /
    • pp.3-14
    • /
    • 2012
  • This paper describes experimental results on the seismic performance of SHCC (strain-hardening cement composite) infill wall for improving damage tolerance capacity of non-ductile frame. To investigate the effect of tensile strain capacity and cracking behavior of SHCC materials on the shear behavior of SHCC infill wall, three infill walls were fabricated and tested under cyclic loading. The test parameter in this study is a type of cement composites; concrete and SHCCs. The two types of SHCC materials were prepared for infill walls. In order to induce crack damages into the mid-span of the infill wall, each infill wall had two 100-mm-deep-notches on both sides. Test results indicated that SHCC infill walls showed superior crack control capacities and much larger drift ratios at the peak loads than RC (reinforced concrete) infill wall, as expected. In particular, due to the bridging actions of the reinforcing fibers, SHCC matrix used in this study would delay the stiffness degradation of infill wall after the first inclined cracking. Moreover, from the damage classes based on the cracks' maximum width in the infill walls, it was observed that PIW-SHD specimen possessed nearly threefold seismic capacities compared to PIW-SLD specimen. Also, from the results on the strain of diagonal reinforcements, it can be concluded that the SHCC matrix would resist a part of tensile stresses transferred along steel rebar in the infill wall.

Modified Driving Method for Reducing Address Time During Subfield Time in AC PDP (플라즈마 디스플레이 패널에서 부화면 시간동안 기입시간을 단축시키기 위한 수정된 구동파형)

  • Cho, Byung-Gwon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.1
    • /
    • pp.135-139
    • /
    • 2015
  • The address discharge time lags are investigated in each subfield time in AC plasma display panel and a modified driving waveform is proposed to reduce the address discharge time lag by applying different additional scan voltage under no misfiring discharge production. The weak plasma discharge in AC PDP is generated by applying high positive-going ramp waveform to the scan electrode during the first reset period and that induce the production of the priming particle and wall charge. Because the wall charge becomes the wall voltage in a cell, the wall plus external address voltage produce the address discharge. However, as the wall charge in a cell is gradually disappeared as time passed, the address discharge time in the subfield time for 1 TV frame is lagged. In the first subfield time, the address discharge is faster produced than the other subfield time because the wall charge are much remained by the high positive-going ramp voltage during the reset period in the first subfield time. Meanwhile, from the second to last subfield, the address discharge production time is gradually delayed due to the dissipation of the wall charge in a cell. In this study, the address discharge time lags are measured in each subfield time and the total address discharge time lags are shortened by applying the different additional scan voltage during the address period in each the subfield time.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

A Study on the Construction Performance of Curtain Wall Systems Using Fire-Resistant & Light-Weight Inorganic Composite Foam Board (내화성 경량 무기 발포보드를 이용한 커튼월 시스템의 시공성능에 관한 연구)

  • Koo, Young-Ah;Kim, Seong-Eun;Oh, Chang-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.2
    • /
    • pp.127-134
    • /
    • 2014
  • This study had the goal of analyzing the economic feasibility and constructability of a fire resistant curtain wall system using Light-weight Inorganic Composite Foam Board(LI-CFB). LI-CFBs, new materials with excellent fire resistance are being developed for use as the back panel of curtain wall and their fire resistance has already been analyzed through actual tests in earlier studies. In this study, a mock-up test involving the installation of the fire resistant curtain wall system on an actual building was conducted, and the system was compared with a common curtain wall system. This system is applied in the same way as a common curtain wall system. But the cutting LI-CFBs, which are brought from a factory, are used in the system and attached on the frame (mullion and transom). Even though the system requires more working time than the existing system, the LI-CFBs back panels are easy to cut and do not produce dust. Also, the panels are able to be assured the quality by checking damaged parts easily. Besides having a high level of fire resistance, the system's economic feasibility and constructability meets or exceeds those of the existing system.

Implementation of an Indoor Mobile Robot and Environment Recognition using Line Histogram Method (실내 자율주행 로봇의 구현 및 라인 히스토그램을 이용한 환경인식)

  • Moon, Chan-Woo;Lee, Young-Dae
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.9 no.2
    • /
    • pp.45-50
    • /
    • 2009
  • The environment exploration is an essential process for indoor robots such as clean robot and security robot. Apartment house and office building has common frame structure, but internal arrangement of each room may be slightly different. So, it is more convenient to use a common frame map than to build a new map at every time the arrangement is changed. In this case, it is important to recognize invariant features such as wall, door and window. In this paper, an indoor mobile robot is implemented, and by using the laser scanner data and line segment histogram with respect to segment orientation and distance, an environment exploration method is presented and tested. This robot is fitted with a laser scanner, gyro sensor, ultra sonic sensor and IR sensor, and programed with C language.

  • PDF

Feasibility study for blind-bolted connections to concrete-filled circular steel tubular columns

  • Goldsworthy, H.M.;Gardner, A.P.
    • Structural Engineering and Mechanics
    • /
    • v.24 no.4
    • /
    • pp.463-478
    • /
    • 2006
  • The design of structural frameworks for buildings is constantly evolving and is dependent on regional issues such as loading and constructability. One of the most promising recent developments for low to medium rise construction in terms of efficiency of construction, robustness and aesthetic appearance utilises concrete-filled steel tubular sections as the columns in a moment-resisting frame. These are coupled to rigid or semi-rigid connections to composite steel-concrete beams. This paper includes the results of a pilot experimental programme leading towards the development of economical, reliable connections that are easily constructed for this type of frame. The connections must provide the requisite strength, stiffness and ductility to suit gravity loading conditions as well as gravity combined with the governing lateral wind or earthquake loading. The aim is to develop connections that are stiffer, less expensive and easier to construct than those in current use. A proposed fabricated T-stub connection is to be used to connect the beam flanges and the column. These T-stubs are connected to the column using "blind bolts" with extensions, allowing installation from the outside of the tube. In general, the use of the extensions results in a dramatic increase in the strength and stiffness of the T-stub to column connection in tension, since the load is shared between membrane action in the tube wall and the anchorage of the bolts through the extensions into the concrete.

High-rise Reinforced-concrete Building Incorporating an Oil Damper in an Outrigger Frame and Its Vibration Analysis

  • Omika, Yukihiro;Koshika, Norihide;Yamamoto, Yukimasa;Kawano, Kenichi;Shimizu, Kan
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.1
    • /
    • pp.43-50
    • /
    • 2016
  • The reinforced-concrete multi-story shear-wall structure, which can free a building from beams and columns to allow the planning of a vast room, has increasingly been used in Japan as a high-rise reinforced-concrete structure. Since this structural system concentrates the seismic force onto multi-story shear walls inside, the bending deformation of the walls may cause excessive deformation on the upper floors during an earthquake. However, it is possible to control the bending deformation to within a certain level by setting high-strength and rigid beams (outriggers) at the top of the multi-story shear walls; these outriggers restrain the bending behavior of the walls. Moreover, it is possible to achieve high energy dissipation by placing vibration control devices on the outriggers and thus restrain the bending behavior. This paper outlines the earthquake response analysis of a high-rise residential tower to demonstrate the effectiveness of the outrigger frame incorporating vibration control devices.

Energy-based damage-control design of steel frames with steel slit walls

  • Ke, Ke;Chen, Yiyi
    • Structural Engineering and Mechanics
    • /
    • v.52 no.6
    • /
    • pp.1157-1176
    • /
    • 2014
  • The objective of this research is to develop a practical design and assessment approach of steel frames with steel slit walls (SSWs) that focuses on the damage-control behavior to enhance the structural resilience. The yielding sequence of SSWs and frame components is found to be a critical issue for the damage-control behavior and the design of systems. The design concept is validated by the full-scale experiments presented in this paper. Based on a modified energy-balance model, a procedure for designing and assessing the system motivated by the framework regarding the equilibrium of the energy demand and the energy capacity is proposed. The damage-control spectra constructed by strength reduction factors calculated from single-degree-of-freedom systems considering the post stiffness are addressed. A quantitative damage-control index to evaluate the system is also derived. The applicability of the proposed approach is validated by the evaluation of example structures with nonlinear dynamic analyses. The observations regarding the structural response and the prediction during selected ground motions demonstrate that the proposed approach can be applied to damage-control design and assessment of systems with satisfactory accuracy.

Seismic design and elastic-plastic analysis of the hengda group super high-rise office buildings

  • Zhang, Xiaomeng;Ren, Qingying;Liu, Wenting;Yang, Songlin;Zhou, Yilun
    • Earthquakes and Structures
    • /
    • v.19 no.3
    • /
    • pp.175-188
    • /
    • 2020
  • The Hengda Group super high-rise building in Jinan City uses the frame-core tube structural system. With a height of 238.3 m, it is above the B-level height limit of 150 m for buildings within 7-magnitude seismic fortification zones. Therefore, it is necessary to apply performance-based seismic design to this super high-rise building. In this study, response spectrum analysis and comparative analysis of the structure are conducted using two software applications. Moreover, elastic time-history analysis, seismic analysis under an intermediate earthquake, and elastic-plastic time-history analysis under rare earthquakes are performed. Based on the analysis results, corresponding strengthening measures are implemented at weaker structural locations, such as corners, wall ends connected to framed girders, and coupling beams connected to framed girders. The failure mode and failure zone of major stress components of the structure under rare earthquakes are analysed. The conclusions to this research demonstrate that weaker locations and important parts of the structure satisfy the requirements for elastic-plastic deformation in the event of rare earthquakes.

A hybrid simulated annealing and optimality criteria method for optimum design of RC buildings

  • Li, Gang;Lu, Haiyan;Liu, Xiang
    • Structural Engineering and Mechanics
    • /
    • v.35 no.1
    • /
    • pp.19-35
    • /
    • 2010
  • This paper proposes a hybrid heuristic and criteria-based method of optimum design which combines the advantages of both the iterated simulated annealing (SA) algorithm and the rigorously derived optimality criteria (OC) for structural optimum design of reinforced concrete (RC) buildings under multi-load cases based on the current Chinese design codes. The entire optimum design procedure is divided into two parts: strength optimum design and stiffness optimum design. A modified SA with the strategy of adaptive feasible region is proposed to perform the discrete optimization of RC frame structures under the strength constraints. The optimum stiffness design is conducted using OC method with the optimum results of strength optimum design as the lower bounds of member size. The proposed method is integrated into the commercial software packages for building structural design, SATWE, and for finite element analysis, ANSYS, for practical applications. Finally, two practical frame-shear-wall structures (15-story and 30-story) are optimized to illustrate the effectiveness and practicality of the proposed optimum design method.