• Title/Summary/Keyword: wall-frame

Search Result 556, Processing Time 0.032 seconds

A Study on the Design of Relocatable Wall System for Office Environment (사무환경을 위한 조립형 벽체 시스템 디자인에 관한 연구)

  • 류호창
    • Archives of design research
    • /
    • v.16 no.1
    • /
    • pp.251-260
    • /
    • 2003
  • The fact that office environment is a principal factor affecting work efficiency is widely accepted. Under such a circumstance, developing relocatable office wall systems is highly required. Psychological, physiological, and economical factors, along with physical factors, should be considered to develope a office wall system. More specifically, competitive price, relocatable efficiency, structural stability, fast installation, health and safety, and aesthetic satisfaction are typical determinants. The evaluation results of newly developed wall system are as below: 1) Panel structural system added with the merits of frame structural system can be studied to accomplish minimal disruption to workplace and better finish details. 2) To cover up the existing interior defects such as uneven floor and ceiling, flexible solutions must be studied especially when panel structural system is accepted. 3) More consideration must be given to finish materials, section details, sound blocking and absorbtion to enhance the satisfaction level.

  • PDF

A Study to Analyze the Assembly Process of Precast Concrete Wall Panels in Beam-Column Frame Apartment Buildings (보-기둥구조 PC공동주택 PC벽체의 조립공정 분석 연구)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Min-Jun;Lee, Dong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.495-506
    • /
    • 2024
  • Unlike reinforced concrete(RC) construction, the primary determinant of construction schedule for precast concrete(PC) apartment buildings is the lifting equipment. To establish a dry process-centric construction schedule, this study analyzes the lifting unit process for core, internal, and external PC wall components, which differ from traditional PC components. By examining the assembly process of these wall types, the study aims to determine the construction cycle for a standard floor frame of a PC apartment building. The findings will serve as foundational data for developing construction schedules for PC apartment buildings utilizing PC walls.

Shear Performance of Hybrid Post and Beam Wall System Infilled with Structural Insulation Panel (SIP)

  • Shim, Kug-Bo;Hwang, Kweon-Hwan;Park, Joo-Saeng;Park, Moon-Jae
    • Journal of the Korean Wood Science and Technology
    • /
    • v.38 no.5
    • /
    • pp.405-413
    • /
    • 2010
  • A hybrid post and beam shear wall system with structural insulation panel (SIP) infill was developed as a part of a green home 'Han-green' project through post and beam construction for contemporary life style. This project is on-going at the Korea Forest Research Institute to develop a new building system which improves Korean traditional wet-type building system and stimulates industrialized wood construction practice with pre-cut system. Compared to the traditional wet-type infill wall components, the hybrid wall system has benefits, such as, higher structural capacity, better thermal insulation performance, and shorter construction term due to the dry-type construction. To build up the hybrid wall system, in previous, SIP infill wall components can be manufactured at factory, and then inserted and nailed with helically threaded nails into the post and beam members at site. Shear performance of the hybrid wall system was evaluated through horizontal shear tests. The SIP hybrid wall system showed higher maximum shear strength, initial stiffness, ductility, yield strength, specified strength, and the specified allowable strength than those of post and beam with light-frame wall system. In addition to this, the hybrid wall system can provide speedy construction and structural and functional advantages including energy efficiency in the building system.

A Study on the Characteristics of Building the Japanese Castle at the Period of Japanese Invasion of Korea in 1592 and in 1597 (임진왜란과 정유재란시기 왜성 축조방법에 대한 연구)

  • Lee, Hyung-Jae
    • Journal of architectural history
    • /
    • v.18 no.1
    • /
    • pp.31-49
    • /
    • 2009
  • Periodically, the Japanese Castle was created in the domestic of Japan and then 2 Invasions into Chosun was started. The Japanese Castle in the domestic of Japan was repaired several times by the building boom of castle before & after 2 invasions and so the initially-built type of castles was changed. Accordingly, there are much difficulties to understand the original shape of Japanese Castle. Through the Japanese Castle within Korea called as the fossil of Japanese Castle, I would like to examine & consider its building period and characteristics. The terminology called as [Two Side Stone's Wall] is that of castle which is not acknowledged in the Japanese Academic Circles. However, it means the two-fold wall of Japanese Castle which was widely applied to the fortification way in the Age of Japan Edo. The terminology of [Sori] says the stonework curve in the corner of Japanese Castle which is indicated best in the Japanese Castle. It calls the curve as like the fan frame. [Curb Stone's Wall] says the type of castle wall constructed with over 1 face in wall body of Japanese Castle. (1) About classifying the construction period of Japanese Castle, the curb stone's wall and the castle having no two side stone's wall must consider the building period as that of Japanese Invasion of Korea in 1592. If there was [Sori], the two-side stone's wall was used and the place which supported the documentary data, in particular, the place having the record of contraction is considered to be confirmed as the castle constructed in the period of Japanese Invasion of Korea in 1597. (2) The two-side-type stone's wall shown in the Modern Japanese Stone Castle is difficultly considered to be generated from the Japanese Castle at the period of Japanese Invasion of Korea in 1592 and in 1597. (3) The beautiful [Sori] shown in the Modern Japanese Stone Castle was started from the Japanese Castle of Korea at the period of Japanese Invasion of Korea in 1597. It is difficultly considered which its indication was firstly generated by the Chaesung-Folded Segment Structure.

  • PDF

In-Situ Behaviors of Steel Frame-type Retaining Walls (조립식 강재틀 옹벽의 현장적응성 분석)

  • 박종배;임해식;박용부;나승민;정형식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.93-101
    • /
    • 2003
  • Steel frame-type retaining walls(SFRW) are constructed by on site bolting of prefabricated steel frames and internal filling of materials such as rocks with the size of 150-300mm. Easy & fast construction, superior drainage performance and structural performance to rigorous site conditions are some of the merits of applying the SFRW to various construction sites. After the development of the structural details, a test construction of SFRW, with the height of 6m and 30m in length, was carried out at an apartment site. After completion, several months of monitoring was carried out on the structure to check displacement, tilting, settlement, soil pressures and drainage characteristics. The results of the structural behavior of SFRW along with its construction methods are presented in the paper.

  • PDF

A Basic Study on the Arrangement of In-situ Production Module of the Composite PC Members (합성 PC 부재 현장생산배치에 관한 기초 연구)

  • Lee, Goon-Jae;Joo, Jin-Kyu;Lee, Sung-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.29-30
    • /
    • 2011
  • A Green Frame is a composite Rahmen precast concrete structure that utilizes the advantages of the steel frame and the reinforced concrete. Compared to bearing wall structure, the precast concrete structure may raise construction cost If the precast concrete members are produced in plant. Thus, if the precast concrete members can be produced in site, the cost-effectiveness and quality shall be increased. Various site conditions must be considered and reviewed to ensure a space for the in-situ production. Therefore, this study focuses on the basic study on the arrangement of in-situ production module of composite precast concrete members.

  • PDF

Analytical Investigation on the Behavior of Simple Span Integral Abutment Bridge (단경간 일체식교대 교량의 거동에 대한 해석적 연구)

  • 홍정희;정재호;박종면;유성근;윤순종
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.04a
    • /
    • pp.99-106
    • /
    • 2002
  • This paper presents an analytical investigation on the behavior of simple span integral abutment bridge. An integral abutment bridge is a simple span or multiple span continuous deck type bridge having the deck integral with the abutment wall. Although the temperature variation and earth pressure are the major attributor to the total stress in integral abutment bridge, the superstructure has been designed by modeling it as a simple or continuous beam In order to investigate the effect of temperature change and earth pressure on the superstructure of integral bridge, the simple span integral bridge is modeled as a plane frame element. Performing frame analysis, the variations of bending moment and axial force of superstructure due to the various loading combination are investigated with respect to the flexural rigidity of piles, and the bending moment and axial force obtained by frame analysis are compared with the maximum bending moment obtained by conventional design method and initial prestressing force respectively.

  • PDF

The significance of removing shear walls in existing low-rise RC frame buildings - Sustainable approach

  • Keihani, Reza;Bahadori-Jahromi, Ali;Goodchild, Charles
    • Structural Engineering and Mechanics
    • /
    • v.71 no.5
    • /
    • pp.563-576
    • /
    • 2019
  • According to The Concrete Centre, in the UK shear walls have become an inseparable part of almost every reinforced concrete frame building. Recently, the construction industry has questioned the need for shear walls in low to mid-rise RC frame buildings. This study tried to address the issue in two stages: The first stage, the feasibility of removing shear walls in an existing design for a residential building where ETABS and CONCEPT software were used to investigate the structural performance and cost-effectiveness respectively. The second stage, the same structure was examined in various locations in the UK to investigate regional effects. This study demonstrated that the building without shear wall could provide adequate serviceability and strength within the safe range defined by Eurocodes. As a result, construction time, overall cost and required concrete volume are reduced which in turn enhance the sustainability of concrete construction.

Shear Strength of Retrofitted RC Squat Wall by Additional Boundary Element (단부 증타 보강된 RC 전단벽체의 전단강도)

  • Yi, You-Sun;Hong, Sung-Gul;Park, Young-Mi
    • Journal of the Korea Concrete Institute
    • /
    • v.27 no.5
    • /
    • pp.489-499
    • /
    • 2015
  • This study suggested shear strength prediction model for retrofitted single-layered RC squat wall by providing column element as additional boundary element. This model revised existing shear strength prediction model of shear wall to consider detail and shear deformation capacity of column by assuming the length that concentrated shear deformation of the column is occurred. It was able to suggest additional compatibility condition related to shear strain of retrofitted of retrofitted shear wall at the ultimate state by using this length. Therefore, this study proposed a flow chart for predicting shear strength of the retrofitted shear wall considering this additional condition. Moreover, this study also proposed a method for predicting initial stiffness of the retrofitted shear wall by transforming the wall's resisting mechanism against to lateral load to a single diagonal strut mechanism. The proposed methods can predict shear strength and initial stiffness of not only the retrofitted shear wall of this study, also infilled RC shear wall in RC frame.

A Study on the Buckling Characteristics of Steel Pipe Scaffold (강관비계의 좌굴특성에 관한 연구)

  • Paik, Shin-Won;Song, In-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.57-61
    • /
    • 2010
  • Formwork is a temporary structure that supports its weight and that of fresh concrete as well as construction live loads. Scaffoling is a temporary frame used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes, although it can be made out of other materials. Bamboo is still used in some Asian countries like China. The purpose of a working scaffold is to provide a safe place of work with safe access suitable for the work being done. In construction site, steel pipes are usually used as scaffolds. In this study, scaffolding systems which is changed according to sleeper and joist space were measured by buckling test. Buckling load of respective scaffolding system was analyzed by structural analysis program(MIDAS). Buckling load of scaffold with/without wall connection and footboard was got by test and structural analysis. According to these results,we know that scaffolding system of case 3 is suitable. Buckling load of scaffold with wall connection is higher than without wall connection. So wall connection is important in scaffoling systems. Footboard in the scaffolding systems is not effective against promotion of buckling load. Finally, the present study results will be used to design scaffolding systems safely in the construction sites.