• Title/Summary/Keyword: urban pavement

Search Result 204, Processing Time 0.025 seconds

Road Maintenance Planning with Traffic Demand Forecasting (장래교통수요예측을 고려한 도로 유지관리 방안)

  • Kim, Jeongmin;Choi, Seunghyun;Do, Myungsik;Han, Daeseok
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.47-57
    • /
    • 2016
  • PURPOSES : This study aims to examine the differences between the existing traffic demand forecasting method and the traffic demand forecasting method considering future regional development plans and new road construction and expansion plans using a four-step traffic demand forecast for a more objective and sophisticated national highway maintenance. This study ultimately aims to present future pavement deterioration and budget forecasting planning based on the examination. METHODS : This study used the latest data offered by the Korea Transport Data Base (KTDB) as the basic data for demand forecast. The analysis scope was set using the Daejeon Metropolitan City's O/D and network data. This study used a traffic demand program called TransCad, and performed a traffic assignment by vehicle type through the application of a user equilibrium-based multi-class assignment technique. This study forecasted future traffic demand by verifying whether or not a realistic traffic pattern was expressed similarly by undertaking a calibration process. This study performed a life cycle cost analysis based on traffic using the forecasted future demand or existing past pattern, or by assuming the constant traffic demand. The maintenance criteria were decided according to equivalent single axle loads (ESAL). The maintenance period in the concerned section was calculated in this study. This study also computed the maintenance costs using a construction method by applying the maintenance criteria considering the ESAL. The road user costs were calculated by using the user cost calculation logic applied to the Korean Pavement Management System, which is the existing study outcome. RESULTS : This study ascertained that the increase and decrease of traffic occurred in the concerned section according to the future development plans. Furthermore, there were differences from demand forecasting that did not consider the development plans. Realistic and accurate demand forecasting supported an optimized decision making that efficiently assigns maintenance costs, and can be used as very important basic information for maintenance decision making. CONCLUSIONS : Therefore, decision making for a more efficient and sophisticated road management than the method assuming future traffic can be expected to be the same as the existing pattern or steady traffic demand. The reflection of a reliable forecasting of the future traffic demand to life cycle cost analysis (LCCA) can be a very vital factor because many studies are generally performed without considering the future traffic demand or with an analysis through setting a scenario upon LCCA within a pavement management system.

Comparative Study on Path Design of Traditional Garden and Modernistic Park

  • Ha Jung-A;Toshitaro Minomo
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.114-119
    • /
    • 2004
  • By Article two of a Japanese urban park low, it prescribes park facilities strictly, and one of the classifications includes 'path and plaza'. In addition, it is assumed that we divide several kinds different paths of width by size of the park in a path design of a park with a textbook of park design in a trunk line path, the main path, a vice-path or a branch path and design it. From such a thing, in the path of an urban park, a line consists straight of fixed width, and it is most that one pattern is considered to be. Therefore, in modem urban park, a path and division of a plaza are lucid explanation. It is rare that the historical parks which generally former daimyo gardens are shown later, and is used as a kind of an urban park width of the path where was particularly posted in a strolling garden in that is fixed, and width waits straight for even a line and waits, and, for this, there is. As a result, it is a path and the situation that are hard to be distinguished of a plaza. Although there are a difference of design and a difference of pavement materials in modem landscape space when We watch road surface constitution of the path that We did that will let you wait, in gross We are uniform, and it is it with a result to be poor in change nature. From such an observation, this consideration compared traditional landscape space and modem landscape space with path width about two points of road surface constitution through the trial that a graph analyzed the actual place data which measured into and lectured on an ideal method of a park path from this.

  • PDF

Guideline of LID-IMPs Selection and the Strategy of LID Design in Apartment Complex (LID-IMPs 선정 가이드라인 제시와 아파트단지에서의 LID 설계)

  • Jeon, Ji-Hong;Kim, Jung-Jin;Choi, Dong Hyuk;Han, Jae Woong;Kim, Tae-Dong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.6
    • /
    • pp.886-895
    • /
    • 2009
  • The guideline of selection of Integrated Management Practices (IMPs), such as wood, green roof, lawn, and porous pavement, for Low Impact Development (LID) design was proposed by ranking the reduction rate of surface runoff using LIDMOD1.0. Based on the guideline, LID was designed with several scenarios at two apartment complexes located at Songpa-gu, Seoul, Korea, and the effect of LID on surface runoff was evaluated during last 10 years. The effect of runoff reduction of IMP by land use change was highly dependent on the kind of hydrologic soil group. The wood planting is the best IMPs for reduction of surfac runoff for all hydrologic soil groups. Lawn planting is an excellent IMP for hydrologic soil group A, but reduction rate is low where soil doesn't effectively drains precipitation. The green roof shows constant reduction rate of surface runoff because it is not influenced by hydrologic soil group. Compared to the rate of other IMPs, the green roof is less effect the surface runoff reduction for hydrologic soil group A and is more effect for hydrologic soil group C and D followed to planing wood. The porous pavement for the impervious area is IMPs which is last selected for LID design because of the lowest reduction rate for all hydrologic soil group. As a result of LID application at study areas, we could conclude that the first step of the strategy of LID design at apartment complex is precuring pervious land as many area as possible, second step is selecting the kind of plant as more interception and evapotranspiration as possible, last step is replacing impervious land with porous pavement.

A Study on Runoff Analysis of Urban Watershed by Hydrologic Infiltration Experiment of Permeable Pavement (투수성 포장의 침투 실험을 통한 도시유역 유출 변화 연구)

  • Koo, Young Min;Jo, Jae An;Kim, Young Do;Park, Jae Hyeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.559-571
    • /
    • 2013
  • Recently, due to increase of the impervious layer, the storage of surface layer has been reduced. Otherwise the peak runoff and the total surface runoff have been raised. Because of larger amount of the peak runoff and the rapid time of concentration, the flood damage of the urban watershed was increased. The groundwater level is descended by reducing the amount of rainfall that infiltrated into the soil. Thereby the hydrologic cycle is degenerated by the dry stream. Therefore, in this study, the evaluation and the quantitative analysis of the percolation effect were performed through the infiltration experiment of permeable pavement, which is one of the ways that can reduce the problem of the dry stream. Also the SWMM model is used to analyze the effect of the hydrologic cycle for permeable pavement in Changwon stream and Nam stream watersheds, with the coefficient of permeability from the infiltration experiments.

Performance Evaluation of the Runoff Reduction with Permeable Pavements using the SWMM Model (SWMM 분석을 통한 투수성 포장의 유출 저감 특성 평가)

  • Lin, Wuguang;Ryu, SungWoo;Park, Dae Geun;Lee, Jaehoon;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.11-18
    • /
    • 2015
  • PURPOSES: This study aims to evaluate the runoff reduction with permeable pavements using the SWMM analysis. METHODS: In this study, simulations were carried out using two different models, simple and complex, to evaluate the runoff reduction when an impermeable pavement is replaced with a permeable pavement. In the simple model, the target area for the analysis was grouped into four areas by the land use characteristics, using the statistical database. In the complex model, simulation was performed based on the data on the sewer and road network configuration of Yongsan-Gu Bogwang-Dong in Seoul, using the ArcGIS software. A scenario was created to investigate the hydro-performance of the permeable pavement based on the return period, runoff coefficient, and the area of permeable pavement that could be laid within one hour after rainfall. RESULTS : The simple modeling analysis results showed that, when an impervious pavement is replaced with a permeable pavement, the peak discharge reduced from $16.7m^3/s$ to $10.4m^3/s$. This represents a reduction of approximately 37.6%. The peak discharge from the whole basin showed a reduction of approximately 11.0%, and the quantity decreased from $52.9m^3/s$ to $47.2m^3/s$. The total flowoff reduced from $43,261m^3$ to $38,551m^3$, i.e., by approximately 10.9%. In the complex model, performed using the ArcGIS interpretation with fewer permeable pavements applicable, the return period and the runoff coefficient increased, and the total flowoff and peak discharge also increased. When the return period was set to 20 years, and a runoff coefficient of 0.05 was applied to all the roads, the total outflow reduced by $5195.7m^3$, and the ratio reduced to 11.7%. When the return period was increased from 20 years to 30 and 100 years, the total outflow reduction decreased from 11.7% to 8.0% and 5.1%, respectively. When a runoff coefficient of 0.5 was applied to all the roads under the return period of 20 years, the total outflow reduction was 10.8%; when the return period was increased to 30 and 100 years, the total outflow reduction decreased to 6.5% and 2.9%, respectively. However, unlike in the simple model, for all the cases in the complex model, the peak discharge reductions were less than 1%. CONCLUSIONS : Being one of the techniques for water circulation and runoff reduction, a high reduction for the small return period rainfall event of penetration was obtained by applying permeable pavements instead of impermeable pavement. With the SWMM analysis results, it was proved that changing to permeable pavement is one of the ways to effectively provide water circulation to various green infrastructure projects, and for stormwater management in urban watersheds.

A Study on the Analysis of the User's Degree of Satisfaction in Urban Pedestrian Sidewalk -Case Study of Urban Pedestrian Sidewalk in Taejon City- (도시가로 보행자 공간의 만족요인 분석에 관한 연구 -대전시 도시 가로 보행자 공간을 중심으로-)

  • 김대현
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.22 no.3
    • /
    • pp.29-40
    • /
    • 1994
  • The purpose of this study was to investigate factors and variables which have significant effects on satisfaction of urban pedestrian sidewalk in taejon city, and to suggest basic information for urban pedestrian sidewalk. These works consist of two phase; The first, tested the user's degree of satisfaction for 37 spots of pedestrian sidewalk slide and then selected 10 spots slide by the stratified random sampling method. The second, analyzed factors and variables of satisfaction of urban pedestrian sidewalk using the semantic differential scale method, and then processed by mean score, correlation, factor analysis, multiful algorithm. The results were summarized as follows; 1) The relationship between the man group and the woman group was highly correlated as well as between the student group.1 and the student group.2 hense these groups statistically showed no difference in satisfaction ratings. 2) Pedestrian sidewalk width, cleanness, pavement materials and construction condition can be significant variables of satisfaction of urban pedestrian sidewalk. 3) Factors covering the satisfaction of urban pedestrian sidewalk have been found to be Environment of pedestrian sidewalk, Vegetation of pedestrian sidewalk and Form of pedestrian sidewalk. By using the control method for the number of factors, C.P. has been obtained as 62.8%.

  • PDF

Surface Image Analysis for Evaluating Porosity and Permeability Coefficient of Permeable Concrete Block (투수 콘크리트 블록 공극률 및 투수계수 평가를 위한 표면 이미지 분석 기법 개발)

  • Jo, Sangbeom;Son, Younghwan;Kim, Donggeun;Jeon, Jihun;Kim, Taejin
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The increase of impermeable area ratio is causing hydrologic cycle problems in urban areas and groundwater depletion in rural areas, permeable pavements are getting attention to expand permeable areas. The performance of the permeable concrete block pavement, which is part of the permeable pavement, is greatly affected by the porosity. In addition, the permeability coefficient is a major factor when designing permeable concrete block pavement. Existing porosity and permeability test methods have problems such as uneconomical or poor field applicability. The object of this study was to develop a methodology for evaluating porosity and permeability coefficient using a surface image of a permeable concrete block. Specimens are manufactured with various porosity ranges and porosity and permeability tests are performed. After surface image preprocessing, normalization and binarization methods were compared. Through this, the method with the highest correlation with the lab test result was determined. From the results, the PDR (pore determined ratio) was obtained. Simple linear regression analysis is performed with PDR and lab test results. The results showed a high correlation of R2 more than 0.8, and the errors were also low.