Development of Sequential Sampling Plan for Bemisia tabaci in Paprika Greenhouses (파프리카 온실에서 담배가루이의 축차표본조사법 개발)

  • Choi, Wonseok;Park, Jung-Joon
    • Korean journal of applied entomology
    • /
    • v.54 no.3
    • /
    • pp.159-167
    • /
    • 2015
  • In order to establish B. tabaci control in paprika greenhouses a fixed-precision-level sampling plan was developed. The sampling plan consisted of spatial distribution analysis, a sampling stop line, and decision making. Sampling was conducted simultaneously in two independent greenhouses (GH 1, GH 2). GH 1 and 2 were surveyed every week for 22 consecutive weeks, using 19 sampling locations in GH 1 and 9 sampling locations in GH 2. The plant in both greenhouses were divided into top (180-220 cm from the ground), middle (80-120 cm from the ground) and bottom (30-70 cm from the ground) sections and B. tabaci adults and pupae were observed on three paprika leaves at each position and recorded separately. GH 2 data were used to validate the fixed-precision sampling plan, which was developed using GH 1 data. In this study, spatial distribution analysis was performed using Taylor's power law with the pooled data of the top and bottom position (B. tabaci adults), and the middle and bottom positions (B. tabaci pupae), based on a 1-leaf sampling unit. Decision making was undertaken using the maximum of action threshold in accordance with previously published method, and the value was decided by the price of the plants. Using the results obtained in the greenhouse, simulated validation of the developed sampling plan by RVSP (Resampling Validation for Sampling Plan) indicated a reasonable level of precision.

Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

A Study On Design & Implementation of An Attitude Control System of a Lot of Legs Robots (다족형 로봇의 자세 제어 시스템 설계 및 구현에 관한 연구)

  • Nam, Sang-Yep;Hong, Sung-Ho;Kim, Suk-Joong
    • 전자공학회논문지 IE
    • /
    • v.45 no.4
    • /
    • pp.11-18
    • /
    • 2008
  • This study is implementation of attitude control system(ACS - Attitude Control System). for a multi legs robot. This study designs H/W of Inertial Measurement Unit (IMU) and attitude control algorithm S/W. Compare performance with Mtx and MTx in order to verify action performance of this system after implementation, and will verify a system integrated IMU of a multi-legs robot. ACS uses Gyro and an accelerometer and an earth magnetism sensor, and it is a system controlling a roll, pitch angle attitude of an object. Generally, low price MEMS is difficult to calculate a correct situation of an object as an error occurs severely the Inertial sensor. This study implements IMU in order to develop ACS as use MEMS, accelerometer, Gyro sensor and earth magnetism sensor. Design algorithm each a roll, pitch, yaw attitude guaranteeing regular performance, and do poling in a system as include an attitude calculation program in an IMU system implemented. Mixed output of Gyro and an accelerometer, and recompensed a roll, pitch angle, and loaded in this study on a target platform in order to implement the ACS which guaranteed performance more than a continuously regular level, and operated by real time, and did porting, and verified.

Discharge Rate Prediction of a new Sandbypassing System in a Field (새로운 샌드바이패싱 시스템의 토출율 예측을 위한 현장실험 연구)

  • Kweon, Hyuck-Min;Park, Sang-Shin;Kwon, Oh-Kyun
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.4
    • /
    • pp.292-303
    • /
    • 2011
  • A new type of sand bypassing system is proposed for recovering the eroded beach in this study. This system provides an added methodology to the soft defence which is main recovery method for the coastal shore protection in the world. The study proposes a conceptional design and manufacturing procedure for the relatively small size machine of sand bypassing. In order to get the discharging volume information, the power capacity of the system is tested in the field. The discharge rate of the new system shows up to the expected maximum of 618 ton/hr which is 9.6% lower than that by theoretical calculation. It gives a resonable agreement in this system when the flow is assumed to be of the high density. In this study, the delivering volume of sand is estimated according to the discharge rate. The combination of 300 mm(12 inch) intake and 250 mm(10 inch) discharge pipe line has the pumping capacity of $103\;m^3/hr$ which is nearly the same as that of South Lake Worth Inlet sand bypassing system, Florida, U.S.A.. The proposed system added the mobility to its merit. The unit price of Florida's sand bypassing is $$8~9/m^3$ (US). The system would be economically suitable for small volume of sand because no additional equipment is necessary for the intake. The diesel fuel of 25~30 l/hr was consumed during the system operation. The multiple working system would be the next investigation target for large volume of sand.

Economic Effect of Regulation in Logistics/Transport Industry (물류운송산업 규제의 경제적 효과)

  • KIM, Jungwook;WI, Suhyeon
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.3
    • /
    • pp.169-182
    • /
    • 2017
  • This research reviews regulations on logistics/transport industry and attempts to quantify the effects of regulation mitigation on GDP per capita. South Korea's transport industry has been gradually expanding, however, the industrial structure is still short rooted. In 2014, average number of hours worked is 5th highest and wage margin 12th smallest out of 18 industries. Furthermore, the regulations for this industry appear to be stricter than those of other industries. OECD's logistics/transport industry regulatory index for South Korea has been decreasing for the last 40 years but still exceeds those of EU, Japan, US, and other countries. This paper provides supporting reasons for regulatory reforms by analyzing the ripple effects on real GDP. Factors such as the ratio of trade among GDP, the enrollment rate to primary school, energy usage per capita, and population are controlled in the fixed-effect model. Estimation results showed that 1 unit decrease in transport/logistics regulatory index is correlated with 8.1% increase of the real GDP per capita, that is, 10% of deregulation is expected to yield 2.16% increase in GDP per capita. Thus, it is expected that mitigating regulations on market entries, price determination, ownership structures of network industry, vertical integrations can improve the economy of South Korea.

Research and Development for Decontamination System of Spent Resin in Hanbit Nuclear Power Plant (한빛원전 폐수지 제염공정 개발연구)

  • Sung, Gi Hong
    • Journal of Radiation Industry
    • /
    • v.9 no.4
    • /
    • pp.217-221
    • /
    • 2015
  • When reactor coolant leaks occur due to cracks of a steam generator's tube, radioactive materials contained in the primary cooling water in nuclear power plant are forced out toward the secondary systems. At this time the secondary water purification resin in the ion exchange resin tower of the steam generator blowdown system is contaminated by the radioactivity of the leaked radioactive materials, so we pack this in special containers and store temporarily because we could not dispose it by ourselves. If steam generator tube leakage occurs, it produces contaminated spent resins annually about 5,000~7,000 liters. This may increase the amount of nuclear waste productions, a disposal working cost and a unit price of generating electricity in the plant. For this reasons, it is required to develop a decontamination process technique for reducing the radioactive level of these resins enough to handle by the self-disposal method. In this research, First, Investigated the structure and properties of the ion exchange resin used in a steam generator blowdown system. Second, Checked for a occurrence status of contaminated spent resin and a disposal technology. Third, identified the chemical characteristics of the waste radionuclides of the spent resin, and examined ionic bonding and separation mechanism of radioactive nuclear species and a spent resin. Finally, we carried out the decontamination experiment using chemicals, ultrasound, microbubbles, supercritical carbon dioxide to process these spent resin. In the case of the spent resin decontamination method using chemicals, the higher the concentration of the drug decontamination efficiency was higher. In the ultrasound method, foreign matter of the spent resin was removed and was found that the level of radioactivity is below of the MDA. In the microbubbles method, we found that the concentration of the radioactivity decreased after the experiment, so it can be used to the decontamination process of the spent resin. In supercritical carbon dioxide method, we found that it also had a high decontamination efficiency. According to the results of these experiments, almost all decontamination method had a high efficiency, but considering the amounts of the secondary waste productions and work environment of the nuclear power plant, we judged the ultrasound and supercritical carbon dioxide method are suitable for application to the plant and we established the plant applicable decontamination process system on the basis of these two methods.

A Study on Determinants for Apartment Remodeling in Seoul Metropolitan Area (아파트 리모델링을 위한 의사결정 요인에 관한 연구 - 서울 및 경기 수도권을 중심으로 -)

  • Cho, Yongkyung;Lee, Jaewon;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.57-65
    • /
    • 2019
  • If aging apartments are left unimproved through remodeling, the city will be eventually slum. As the government recognizes remodeling as an alternative to reconstruction, the law has been revised mainly to increase the housing area, increase the number of house and allow the vertical extension for making remodeling costs. However, the remodeling is still not activated yet in the market. Therefore, this study analyzes the decision factors of apartment remodeling in Seoul metropolitan area based on Heckman two-stage analysis considering sampling error. Research findings indicate that the decision for remodeling is determined by the characteristics of the household, housing, and time-lapse variables. And also the number of household members, net assets, housing satisfaction, the 11-20, 21-30, and more than 30 years of building are identified as the significant variables as a result of remodeling choice probability analysis. It is noteworthy that the significant variables from then remodeling cost analysis are net assets, area, more than 30 years of building, and unit housing price. It is also notable that the policy, which extend the housing area to cover remodeling cost, are not actually effective to activate the remodeling, and the age in the case of elderly people in Seoul and Gyeonggi-do who are expected to have high net assets and income is not significant variables. This study is expected to provide more objective and reliable implication to the policy makers, the home owner and the investors on the decision making process related to the remodeling project.

Evaluation for the Usefulness of Automated Blood Typing Analyzer (혈액은행 자동화 장비 도입의 유용성 평가)

  • Kim, Ha-na;Kim, Hee-Bum;Park, Hyun-Sang;Lee, Hyun-Im;Hong, Myung-Kook;Shin, Gyoung-Sook;Suh, In-Bum
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.6
    • /
    • pp.565-574
    • /
    • 2019
  • In this study, we evaluated the usefulness of an automatic blood typing analyzer using QWALYS-2 up (Diagast, Loos Cedex, France). During a month( 01OCT2013 - 31OCT2013) we performed 1,636 tests for ABO & RhD blood typing, 1,374 tests for antibody screen & identification tests and compared the results by automatic blood type analyzer with previous manual methods and column agglutination tests. And we analyzed the economic performance by comparison the test unit price between automatic blood type analyzer and manual methods. In ABO & RhD blood typing tests, there were complete concordances between manual and automated blood typing analyzer for 200 clinical samples. In Antibody screen tests, the concordance rate between manual and automated blood typing analyzer was 98.5% and more strong reaction in automated blood typing analyzer than manual methods. Therefore, the introduction of an automated blood typing analyzer, reagents costs were increased but labor costs were decreased. Considering the importance of transfusion safety and economic advantages, the introduction of an automated blood typing analyzer was very useful.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.