• 제목/요약/키워드: unit load system

검색결과 741건 처리시간 0.029초

노동강도 제거 및 양끝정렬 균일화를 위한 양끝절단포장적재시스템 개발 (The package loading equipment development cutting both ends in the process of packaging lumber for improving the working environments)

  • 강지호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 춘계학술대회
    • /
    • pp.135-147
    • /
    • 2008
  • The package loading process of the lumbering industry is an operation that after a pair of workers bind three or six lumbers into one unit and cut both ends of the lumbers, transports the weight cargo of 30-50kg by one meter, pack and load at a height of 1.2 meters. This package loading process causes lots of noise and wood dust when workers carry out the heavy work as the above. Therefore we developed the monolithic both ends cutting package loading equipment in order to prevent from getting musculoskeletal disease. An loading bar working system of this equipment is improved from pneumatic pressure system to oil pressure system, furnished the newly designed flow dividers, and developed the new system that a both end array is loaded identically. Also we developed the safety equipment of loading bar in order to prevent workers mistake and overload from malfunction during the package loading process. The main cause of job evasion on working place could be solved by preventing the musculoskeletal disease and improving the working environments.

  • PDF

소형 전기에너지저장장치 운전조건에 따른 방사 및 전도 방해에 관한 연구 (A Study on Radiated and Conducted Noise for Small Electrical Energy Storage System due to Its Operating State)

  • 정중일;안건현;김용성
    • 전기학회논문지P
    • /
    • 제64권1호
    • /
    • pp.18-22
    • /
    • 2015
  • When using a secondary battery in energy storage units, if the grid is in light duty the active power is stored so it can be used when the grid is in heavy duty. This makes possible for the load equalize and make the grid optimized. Recently the government is trying to propagate this technology. Depending on its capacity this kind of electric energy storage unit is used in adjusting the frequency, break up the energy peak in summer and winter, stabilize the energy output of renewable energy which can change unstably because of the environment. Which makes it possible to stabilize the grid. It is anticipated that market of 120 trillion won will be developed worldwide in 2030. Currently in Korea a steady supply is in progress. However because of stray electromagnetic waves some other electronics are malfunctioning. This paper covers the research in the method to detect the emission noise in small electric energy storage units using lithium secondary batteries and battery management system, Power conditioning systems with CIPSR standards. And the research of a more efficient method to measure such stray electromagnetic waves.

태양열 온실 난방에 대한 최척 집열 면적과 경제성 평가 (Optimum Collector Area and Economic Evaluation for the Greenhouse Heating)

  • 박이동;김규인
    • 태양에너지
    • /
    • 제2권1호
    • /
    • pp.49-58
    • /
    • 1982
  • Aim of this study was to obtain the heating performance and the economic evaluation on solar heating system for greenhouse which area of floor was $90m^2$. For heating performance effective solar energy for the greenhouse was compared with overall heating loads including coefficient of heat transfer and conduction. And the economic evaluation solar heating system was evaluated by comparison its initial investiment costing with oil saving cost. Initial investiment costing included collector cost, storage cost, piping cost, control system cost and miscellaneous costs which included pumps, motors etc. The contents of this study included the survey of climate conditions for solar heating, long-term collector performance and optimum collector area of solar heating system in existing greenhouse. The results are follows: 1. Average horizontal radiation during winter was $2,434Kcal/m^2$ day which was the highest value in this country, so the climate conditions of Suwon was suitable for solar heating. 2. Resulting calculation of the optimum collector area was $30m^2$ and the solar energy accounted for 30% of the overall heating load. 3. The capacity of storage tank required 60 liter per unit area ($m^2$) of solar collector.

  • PDF

신재생발전기의 데이터 취득방안에 대한 고찰 (Review on Data Acquisition of Renewable Power Generators)

  • 이봉길;김완홍;최준호
    • 한국태양에너지학회 논문집
    • /
    • 제40권3호
    • /
    • pp.1-20
    • /
    • 2020
  • In accordance with the Government's policy, renewable power generation is expanding very largely. This leads to increasing uncertainty in the power market and power system owing to the intermittent and fluctuating output characteristics of renewable power generators. Data on the acquisition of renewable power generators can be largely classified according to the operation of the power market and power system. Data on the settlement for the payment for the power amount are acquired in the power market, and real-time data for monitoring the status and output of the generators are acquired in the power system. However, renewable power generators operating in the power market have different acquisition cycles depending on the method of communication of the power meter. They acquire data only for settlement purposes and have no real-time data, which requires improvement. In this paper, the acquisition status is reviewed by classifying the data of renewable power generators into settlement and real-time data. In addition, measures and acquisition criteria for real-time data of renewable power generators for improving the acquisition method are proposed.

마이크로 지오메트리 방법을 이용한 크로스 드릴링/밀링 유닛 구동기어의 동력전달 최적화에 관한 연구 (Power Transmission Optimization Based on the Driving Gear of a Cross Drilling/Milling Unit using a Micro Geometry Method)

  • 김동선;진진;백권인;우위팅;전남술;류성기
    • 한국기계가공학회지
    • /
    • 제18권4호
    • /
    • pp.93-99
    • /
    • 2019
  • A cross drilling/milling Unit is an important mechanical part which is widely used in many kinds of machining tool, and various gear trains with good accuracy and reliability features are widely used in power transmission systems. A study on a novel power transmission optimization method for driving gear trains in cross drilling/milling units is presented in this paper. A commercial program for gear system simulation, Romax Designer, was used in this research to intuitively observe the gear meshing and the load distribution conditions on the gear teeth. We obtained the optimal modification value through comparing the results of repeated experiments. For validation, optimized gears were fabricated and then measured with a precision tester.

u-우편물류를 위한 RFID 운송용기관리 시스템 모형 (A RFID-based Transportation Unit Load Device Management System Model for u-Postal Logistics)

  • 김동호;전성우;허홍석
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2006년도 춘계학술발표대회
    • /
    • pp.597-600
    • /
    • 2006
  • 인터넷 기술의 발전으로 우편물류시스템은 우편집중국을 중심의 허브-스포크 구조를 기반으로 자동화 우편소통 시설과 우편물류정보시스템 구축 등의 많은 변화와 발전을 해왔다. 현행 우편물류정보시스템은 바코드를 기반으로 정보의 교환 및 처리를 수행하며, 물류정보의 수집, 처리 및 활용에 있어서 실시간성과 동적인 운용 측면에서 진일보하기 위해서는 차세대 정보기술인 RFID를 지원하기 위한 연구가 필요하다. 따라서 이 논문에서는 우편물류의 운송용기를 중심으로 업무 및 시스템을 분석하며, 업무 효율성과 생산성 개선을 위해 RFID 기술을 적용하기 위한 정보처리시스템 모형을 설명한다.

  • PDF

DP Formulation of Microgrid Operation with Heat and Electricity Constraints

  • Nguyen, Minh Y;Choi, Nack-Hyun;Yoon, Yong-Tae
    • Journal of Power Electronics
    • /
    • 제9권6호
    • /
    • pp.919-928
    • /
    • 2009
  • Microgrids (MGs) are typically comprised of distributed generators (DGs) including renewable energy sources (RESs), storage devices and controllable loads, which can operate in either interconnected or isolated mode from the main distribution grid. This paper introduces a novel dynamic programming (DP) approach to MG optimization which takes into consideration the coordination of energy supply in terms of heat and electricity. The DP method has been applied successfully to several cases in power system operations. In this paper, a special emphasis is placed on the uncontrollability of RESs, the constraints of DGs, and the application of demand response (DR) programs such as directed load control (DLC), interruptible/curtaillable (I/C) service, and/or demand-side bidding (DSB) in the deregulated market. Finally, in order to illustrate the optimization results, this approach is applied to a couple of examples of MGs in a certain configuration. The results also show the maximum profit that can be achieved.

동적 전류분담 인덕터를 적용한 ZVT 풀 브리지 컨버터의 병렬 운전 (The Parallel Operation of ZVT-Full Bridge Converter with Dynamic Current Shared Inductor)

  • 배진용;김용;백수현;권순도;이규훈;김철진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 B
    • /
    • pp.942-945
    • /
    • 2001
  • This paper presents parallel operation of ZVT(Zero Voltage Transition) Full Bridge Converter with Dynamic Current Shared Inductor. In the conventional method, CT(Current Transformer) have been used to share the load current equally with converters. In this system, at parallel operation of ZVT Full Bridge Converter, dynamic current shared inductor divides the same current of unit converter and ZVT circuit aids to high efficiency. This method which is proposed to compare in the conventional method will do simple control circuit. To show the superiority of this converter is verified through the experiment with a 2kW, 50kHz prototype converter.

  • PDF

물류설비 및 속성 분류체계 연구 (A Classification Study on Logistics Equipments and Their Attributes)

  • 장태우
    • 한국철도학회논문집
    • /
    • 제12권1호
    • /
    • pp.175-182
    • /
    • 2009
  • 포장, 수송, 운반, 하역, 보관 등 물류 기능별 단계에서 사용되는 설비의 호환성과 연계성에 대한 요구가 지속되고 있다. 본 연구에서는 일관수송을 위한 표준 파렛트를 중심으로 물류설비 간의 모자 관계 등에 대한 인터페이스 분석을 위한 분류체계를 제시하고자 한다. 이를 위해 국내외 물류설비 관련 분류체계 및 표준/규격을 검토하여 문제점과 이슈를 분석하였다. 또한 설비별 속성 분류체계를 제시하고 의미론적으로 표현하는 예를 제시한다. 본 연구의 결과를 확장하여 표준 파렛트의 변경 또는 다변화에 대비한 관련 물류설비의 정합성 검토의 자동화 작업이 가능할 것이다.

외부 프리스트레스트 탄소섬유판 정착장치의 콘크리트에 대한 정착성능 (Behavior of Mechanical Anchorage Surface-Embedded in Concrete for Post-tensioning CFRP Strips)

  • 유영찬;최기선;박영환;박종섭;김긍환
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.226-229
    • /
    • 2006
  • Strengthening with externally post-tensioned CFRP strips is more effective in increasing load carrying capacity of existing structures as well as reducing crack width and deflection. This study developed concrete embedded anchorages system for externally post-tensioned CFRP strips, and carried out experimental study to verify anchoring performance quantitatively. Through experimental results, anchoring strength of concrete embedded anchorage were quantified into shear strength of anchor bolt, bearing strength of concrete at the front of anchor plate and bond strength between anchor plate and concrete surface. In addition, overall anchoring performances according to combination of each unit force are examined in this study.

  • PDF