• 제목/요약/키워드: two component system

검색결과 1,211건 처리시간 0.025초

Optimal Maintenance Scheduling in a Two Identical Component Parallel Redundant System Subject to Exponential Power Hazards

  • El-Damcese, M.A.;Helmy, A.N.
    • International Journal of Reliability and Applications
    • /
    • 제9권2호
    • /
    • pp.141-152
    • /
    • 2008
  • This paper presents equations, which can be used to evaluate the failure frequency and the failure rate of a two identical component parallel redundant system in which each component can operate in its wear out period, and the failure rate of each component is exponential power distribution. The optimum maintenance interval for a two identical component parallel redundant system can be obtained using these equations. The proposed approach is presented and illustrated using several numerical examples. The optimum maintenance interval for each component in a two identical parallel redundant system will depend on factors such as: failure rate, repair and maintenance times of each component in the parallel redundant systems.

  • PDF

ANALYTIC SOLUTIONS OF THE CAUCHY PROBLEM FOR THE GENERALIZED TWO-COMPONENT HUNTER-SAXTON SYSTEM

  • Moon, Byungsoo
    • 호남수학학술지
    • /
    • 제37권1호
    • /
    • pp.99-112
    • /
    • 2015
  • In this paper we consider the periodic Cauchy problem for the generalized two-component Hunter-Saxton system with analytic initial data and we prove a Cauchy-Kowalevski type theorem for the generalized two-component Hunter-Saxton system, that establishes the existence and uniqueness of real analytic solutions.

다재 사출성형 전문가 시스템 개발 (Development of an Expert System for Multi-component Injection Molding)

  • 강신일
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 1999년도 춘계학술대회논문집
    • /
    • pp.213-217
    • /
    • 1999
  • An expert system is developed for rational and efficient design of multi-component injection molding which is a fairly new manufacturing technique to produce plastic parts by injecting two or more materials sequentially using multiple injection units in a single machine into a single rotary mold. The knowledge base used in the present design system is primarily composed of two parts ; knowledge from domain expert and knowledge from CAE analysis. The present expert system has hour main modules ; general design guidelines for injection molding specific guidelines for multi-component injection molding redesign guidelines from the result of the CAE analysis and finally troubleshooting for multi-component injection molding. To show the validity of the present design methodology two shop floor design problems were tested ; design and fabrication of timing belt cover and power window's assist knob by using multi-component injection molding.

  • PDF

두 가지 부품으로 구성된 조립시스템에서 부품 아웃소싱 계약에 대한 고찰 (Component Outsourcing Contracts in a Two-Component Assembly System)

  • 김은갑
    • 산업공학
    • /
    • 제22권2호
    • /
    • pp.165-173
    • /
    • 2009
  • This paper considers a two-component assembly system that makes different types of purchasing contracts by component type and studies the issue of coordinating those contracts. Acquisition of type 1 component is based on the long-term contract. In contrast, type 2 component is intermittently purchased under the sort-term contract. We identify the structural properties of the optimal short-term contract and investigate how the changes in system parameters affect the optimal performance. To provide managerial insights, we compare the short-term and long-term contracts for type 2 component and discuss the conditions that make the short-term contract preferable to the long-term contract. We also present a result which shows that coordinating the contracts of type 1 and type 2 components can be significantly profitable over uncoordinating them.

부품 판매 옵션을 갖는 두 단계 일렬 생산 시스템에서의 최적 생산 전략 (Optimal Production Controls in a Two-Stage Production System with a Component Selling Option)

  • 김은갑
    • 대한산업공학회지
    • /
    • 제41권5호
    • /
    • pp.447-452
    • /
    • 2015
  • This paper considers a two-stage make-to-stock production system. The first stage produces a single-component and the second stage produces a make-to-stock product using components. In addition to internal demands, the first stage faces external demands with the option of accepting or rejecting. To ration component inventory, the manufacturer adopts a static rule. This paper analyzes the production controls at both facilities that maximizes the manufacturer's profit. Using the Markov decision process model, we characterize the optimal production policy by two monotonic switching curves.

Estimation of a Bivariate Exponential Distribution with a Location Parameter

  • 홍연웅;권용만
    • 한국데이터정보과학회:학술대회논문집
    • /
    • 한국데이터정보과학회 2002년도 춘계학술대회
    • /
    • pp.89-95
    • /
    • 2002
  • This paper considers the problem of estimating paramaters of the bivariate exponential distribution with a loaction parameter for a two-component shared parallel system using component data from system-level life test terminated at the time of the prespecified number of system failure. In the system-level life testing, there are three patterns of failure types; 1) both component failed 2) both component censored 3) one is failed and the other is censored. In the third case, we assume that the failure time might be known or unknown. The maximum likelihood estimators are obtained for the case of known/unknown failure time when the other component is censored.

  • PDF

Estimations of the Parameters in a Two-component System Using Dependent Masked Data

  • Sarhan Ammar M.
    • International Journal of Reliability and Applications
    • /
    • 제6권2호
    • /
    • pp.117-133
    • /
    • 2005
  • Estimations of the parameters included in a two-component system are derived based on masked system life test data, when the probability of masking depends upon the exact cause of system failure. Also estimations of reliability for the individual components at a specified mission time are derived. Maximum likelihood and Bayes methods are used to derive these estimators. The problem is explained on a series system consisting of two independent components each of which has a Pareto distributed lifetime. Further we present numerical studies using simulation.

  • PDF

Design of ramp-stress accelerated life test plans for a parallel system with two independent components using masked data

  • Srivastava, P.W.;Savita, Savita
    • International Journal of Reliability and Applications
    • /
    • 제18권2호
    • /
    • pp.45-63
    • /
    • 2017
  • In this paper, we have formulated optimum Accelerated Life Test (ALT) plan for a parallel system with two independent components using masked data with ramp-stress loading scheme and Type-I censoring. Consider a system of two independent and non-identical components connected in parallel. Such a system fails whenever all of its components has failed. The exact component that causes the system to fail is often unknown due to cost and time constraint. For each parallel system at test, we observe its system's failure time and a set of component that includes the component actually causing the system to fail. The stress-life relationship is modelled using inverse power law, and cumulative exposure model is assumed to model the effect of changing stress. The optimal plan consists in finding out the optimum stress rate using D-optimality criterion. The method developed has been explained using a numerical example and sensitivity analysis carried out.

  • PDF

경쟁 기반의 부품 생산과 협업 기반의 완성품 생산 시스템에서 생산과 수요 통제의 통합적 고찰 (Integrated Demand and Production Control for the Competition-based Component and Cooperation-based End Item)

  • 김은갑
    • 산업공학
    • /
    • 제22권4호
    • /
    • pp.368-375
    • /
    • 2009
  • This paper considers a two-stage supply system consisting of two make-to-stock facilities. The facility in the first stage produces a single type of component in anticipation of future demands from the market and the end item production while the facility in the second stage produces the end item in anticipation of future demands from the OEM customers. The facility in the first stage has the option of to accept or reject each incoming demand from the market. In this paper, we address the problem of how to control the exogenous component demand and how to manage the production of the end item and the component so as to maximize the system's profit subject to the system costs. In this paper, we present a heuristic policy that is the base-stock production policy combined with a linear switching curve for component demand control. Numerical study is implemented under different operating conditions of the system and it shows that the performance of the heuristic is very promising compared to that of the optimal policy for the Markov model.

체계수명시험에서 얻어진 부품의 수명자료를 이용한 Freund 모형의 추정 (Estimation of Freund Model for System Level Life Testing Using Component Life Data)

  • 홍연웅
    • 품질경영학회지
    • /
    • 제26권2호
    • /
    • pp.27-38
    • /
    • 1998
  • Consider a life testing experiment in which multiple two-component shared parallel systems are put on test, and the test is terminated at a specified number of system failures. The bivariate data obtained from such a system-level life testing can be classified into three classes: 1) the case of failed two components with known failure times, 2) the case of censored two components, and 3) the case of one censored component and the other failed component of which the failure time might be known or unknown. Under this censoring scheme and the assumption of Freund's bivariate exponential life distribution, the maximum likelihood estimators are obtained. Results of comparative studies based on Monte Carlo simulation are presented.

  • PDF