• Title/Summary/Keyword: tunnelling length

Search Result 92, Processing Time 0.029 seconds

A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis (3차원 수치해석을 이용한 Shield TBM 굴진시 지표침하 주요 영향요소 분석)

  • Jun, Gy-Chan;Kim, Dong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.305-317
    • /
    • 2015
  • This paper is to perform 3-dimensional numerical analysis considering face pressure, backfill pressure, excavation length, soil model and element size for selecting key factors of ground surface settlement due to shield TBM advancement. According to the numerical analysis results, backfill pressure and soil model are governing factors inducing ground surface settlement. To complement this study, the ground conditions and characteristics of the boring machine will be considered using numerical analysis.

Behavior of the ground in rectangularly crossed area due to tunnel excavation under the existing tunnel (I) (기존터널에 근접한 직각교차 하부터널의 굴착에 따른 교차부지반의 거동 (I))

  • Kim, Dong-Gab;Kim, Seung-Hyun;Hong, Suk-Bong;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.3-12
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel Rectangularly crossed to that was studied. Model tests were performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density. Results of the model tests show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

Pillar load and ground deformation in 2-arch tunnel in the jointed rock mass (절리암반에서 2-Arch 터널의 필라하중과 지반변위)

  • Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.91-97
    • /
    • 2007
  • Loads on the pillar and ground deformation in 2-arch tunnel, which is excavated in the rock mass with regular discontinuities, depending on the dips of discontinuities and the construction sequences were experimentally studied. Large scale model tests in the biaxial test facility were performed. Tested model (width 3.3m, height 3.0m, and length 0.45m) for 2-arch tunnel in 1/10 scale were built with various dips. Test results show that discontinuities have greate affects on the behavior of the 2-arch tunnel, especially on the pillar loads and ground deformation.

  • PDF

Seismic reflection imaging ahead of tunnel face using 3 component geophones (3성분 지오폰을 이용한 막장전방 예측 탄성파탐사)

  • Jo Churl Hyun;Cha Young Ho;Yang Jong Hwa;Bang Ki Moon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.412-417
    • /
    • 2005
  • To ensure the safety of the tunnelling without the loss of economy, the tunnel seismic profiling(TSP) method for the prediction ahead of tunnel face, begins to be used routinely in these days. TSP method does not interfere the tunnelling works while the horizontal drilling does, and its prediction length is longer than that of the drilling. Yet the most frequently adopted technique of TSP in Korea is the multi-shot and 2 receiver array using in-hole receivers, even though this array requires as many as 26 drill-holes for receiver installation and ballasting, which results in 3-6 hours of suspension in excavation work. In this paper, multi-receiver and lesser shot array using side-wall attached 3 component geophones is to be described to prove the efficiency in terms of the survey time as well as the reliability of the method by comparison of the predicted weak points and the face mapping results. The predictions mostly agreed with the real fractures or joint developed zones which have been confirmed during the excavation. It also has been found that TSP method can be effectively applied to perform draining ground water ahead of tunnel face by imaging the geologic discontinuities.

  • PDF

Selection of Optimum Support based on Rock Mass Classification and Monitoring Results at NATM Tunnel in Hard Rock (경암지반 NATM 터널에서 암반분류 및 계측에 의한 최적지보공 선정에 관한 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.6 no.3
    • /
    • pp.197-208
    • /
    • 1996
  • Due to the constraints in pre site-investigation for tunnel, it is essential to redesign the support structures suitable for rock mass conditions such as rock strength, ground water and discontinuity conditions for safe tunnel construction. For the selection of optimum support, it is very important to carry out the rock mass classification and in-situ measurement in tunnelling. In this paper, in a mountain tunnel designed by NATM in hard rock, the selectable system for optimum support has been studied. The tunnel is situated at Chun-an in Kyungbu highspeed railway line with 2 lanes over a length of 4, 020 m and a diameter of 15 m. The tunnel was constructed by drill & blasting method and long bench cut method, designed five types of standard support patterns according to rock mass conditions. In this tunnel, face mapping based on image processing of tunnel face and rock mass classification by RMR carried out for the quantitative evaluation of the characteristics of rock mass and compared with rock mass classes in design. Also, in-situ measurement of convergence and crown settlement conducted about 30 m interval, assessed the stability of tunnel from the analysis of monitoring data. Through the results of rock mass classification and in-situ measurement in several sections, the design of supports were modified for the safe and economic tunnelling.

  • PDF

A case study of large - long tunnel using the charging mechanization system of the bulk emulsion explosives (Bulk Emulsion 기계화 장전시스템을 이용한 대단면 장대터널 시공사례연구)

  • Yoon, Ji-Sun;Jang, Young-Min;Lee, Sang-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.107-115
    • /
    • 2009
  • Lately, the length of tunnel, the number of large-long tunnel over three lanes are steeply increased because of the request for high speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. Bulk Emulsion explosives charging system is the spearhead equipment using the radio remote control $&$ mechanization system compare with a traditional method Cartridge type. This study introduced the bulk emulsion explosives which is new method in tunnel blasting and verified the efficiency of bulk emulsion explosives for long-large tunnel. And we tried to compare Cartridge type efficiency with bulk emulsion explosives efficiency by the field test.

Effect of size and slope angle of tooth-shaped asperity on shear fracturing characteristics (삼각형 돌출부의 크기 및 경사각이 전단파괴 형상 특성에 미치는 영향)

  • Kim, Won-Keun;Choi, Woo-Yong;Park, Jong-Deok;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.4
    • /
    • pp.431-442
    • /
    • 2013
  • Most of previous studies have insufficiently investigated the shear behavior and fracturing characteristics, experimentally in respect to the change of size of tooth-shaped surface asperity such as length and slope angle in a broad range. This study investigates the influence of the length and slope angle of a tooth-shaped surface asperity on the fracturing characteristics and the interface shear strength by using direct shear test apparatus. A total of 36 interface direct shear tests were conducted by changing the three types of slope angle of surface asperity, four type of length, and three types of normal stress. The shape of fractured surface after the test was quantified by using a three-dimensional surface roughness measurement apparatus. Through the experimental test results, the characteristics of fractured shape of surface asperity according to the normal stress were investigated. In addition, fractured length and height were quantified at each slope angle of surface asperity under a certain normal stress condition.

A Study on the Behaviour of a Single Pile to Adjacent Tunnelling Conducted in the Lateral Direction of the Pile (단독말뚝의 측면으로 시공되는 터널에 의한 말뚝의 거동 연구)

  • Lee, Cheolju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.1
    • /
    • pp.41-50
    • /
    • 2011
  • Three-dimensional(3D) numerical analyses have been conducted to study the behaviour of a single pile to adjacent tunnelling conducted in the lateral direction of the pile. In the numerical analyses, the interaction between the tunnel, the pile and the soil next to the pile has been analysed. The study includes the pile settlement, the relative shear displacement between the pile and the soil, the shear stresses at the soil next to the pile and the axial force on the pile. In particular, the shear stress transfer mechanism along the pile related to the tunnel advancement has been rigorously analysed. Due to changes in the relative shear displacement between the pile and the soil next to the pile during the tunnel advancement, the shear stress and the axial force distributions along the pile have been changed. Downward shear stress developed above the tunnel springline (Z/L=0.0-0.7~0.8), while upward shear stress is mobilised below the tunnel springline (Z/L=0.7~0.8-1.0) resulting in compressive force on the pile, where Z is the pile location and L is the pile length. Maximum compressive force of about $0.475P_a$ was developed on the pile after completion of tunnel advancement, where $P_a$ is the allowable pile capacity. Some insights into the pile behaviour to tunnelling obtained from the numerical analyses will be reported and discussed.

A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method (Pre-cutting 공법을 적용한 터널 확폭 시 기존 및 확폭터널의 거동에 관한 수치해석적 연구)

  • Kim, Han-Eol;Nam, Kyoung-Min;Ha, Sang-Gui;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.451-468
    • /
    • 2020
  • Aging tunnels with small cross-sections can cause chronic traffic jams. This problem can be solved by widening the tunnel. In general, when the tunnel is expanded, the outer portion of the existing tunnel is excavated through a mechanical or blasting method. Such excavation affects not only the surrounding ground but also the existing tunnel. The application of the pre-cutting method can be a solution to these problems effectively. Therefore, if the widening of tunnel is performed by applying pre-cutting method, analysis of the impact of this method must be performed. In this study, in order to analyze the effect of applying pre-cutting in tunnel widening, numerical analysis is performed at six ground grades, from grade I to weathered rock. The analysis is performed with the expanding lane and the excavation length of pre-cutting as variables. In addition, the analysis is focused on the displacement of crown of the existing tunnel and the enlarged tunnel. As a result, the crown displacement of the enlarged tunnel is confirmed to converge at the same value regardless of the excavation length of the pre-cutting when the tunnel widening is completed. In the case of existing tunnels, uplift of crown occurs within 5 m of the front of the tunnel surface, and the shorter the excavation length of pre-cutting is found to be effective in preventing the occurrence of uplift.

서울지하철 3,4호선 Tunnel 굴착과 진동대책 조사연구(1)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.2
    • /
    • pp.3-15
    • /
    • 1982
  • The study on prevention measures for vibration and excavation of tunnel for the #3, #4, Seoul Subway. In the Seoul subway tunnel blasting, the drilling pattern and prevention method to seismic vibration are as follows as well as for adaptions of NATM, the supportings of roof and wall holes are arranged with control blasting. 1. The blasting is executed basically using the low velocity explosive such as slurry, Nitrate ammonium explosive, and F-I and F-II explosive for control blasting substituting of existing dynamite. 2. The cut holes are arranged with burn cut pattern and also must be arranged with M/S electrical delay caps substituting of ordinary do]ay caps. 3. Jack leg drills are used in Five Job sites and a jumbo drill in one job site. 4. In performance of safety work and in maintenance of building safety. The drilling length for blasting will not exceed 1.20 meter for round so that the vibration value shall carry below 0.3cm/sec. The harmonizing of better powder, better drilling machine and better technique is only the way of improving tunnelling efficiency and less vibration will help the dereasing of accidence.

  • PDF