A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis  

Jun, Gy-Chan (KOREA Engineering & Construction Co., Ltd.)
Kim, Dong-Hyun (KOREA Engineering & Construction Co., Ltd.)
Publication Information
Journal of Korean Tunnelling and Underground Space Association / v.17, no.3, 2015 , pp. 305-317 More about this Journal
Abstract
This paper is to perform 3-dimensional numerical analysis considering face pressure, backfill pressure, excavation length, soil model and element size for selecting key factors of ground surface settlement due to shield TBM advancement. According to the numerical analysis results, backfill pressure and soil model are governing factors inducing ground surface settlement. To complement this study, the ground conditions and characteristics of the boring machine will be considered using numerical analysis.
Keywords
Shield tunneling; 3-D numerical analysis; Backfill pressure; Soil model;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Cho, J.S. (2008), "Analysis of ground movements and lining segment in shield TBM based on three dimensional finite element method", Pukyong National University, pp. 15-25.
2 LIM KEN CHAI (2003), "Three-dimensional finite element analysisof earth pressure balance tunnelling", national university of singapore, pp. 121-198.
3 SVEN CHRISTIAN MO LLER. (2006), "Tunnel induced settlements and structural forces in linings", Eigenverlag des Instituts fur Geotechnik, pp. 108-111.