서울지하철 3,4호선 Tunnel 굴착과 진동대책 조사연구(1)

  • 허진 (광업기술사(채광))
  • Published : 1982.06.01

Abstract

The study on prevention measures for vibration and excavation of tunnel for the #3, #4, Seoul Subway. In the Seoul subway tunnel blasting, the drilling pattern and prevention method to seismic vibration are as follows as well as for adaptions of NATM, the supportings of roof and wall holes are arranged with control blasting. 1. The blasting is executed basically using the low velocity explosive such as slurry, Nitrate ammonium explosive, and F-I and F-II explosive for control blasting substituting of existing dynamite. 2. The cut holes are arranged with burn cut pattern and also must be arranged with M/S electrical delay caps substituting of ordinary do]ay caps. 3. Jack leg drills are used in Five Job sites and a jumbo drill in one job site. 4. In performance of safety work and in maintenance of building safety. The drilling length for blasting will not exceed 1.20 meter for round so that the vibration value shall carry below 0.3cm/sec. The harmonizing of better powder, better drilling machine and better technique is only the way of improving tunnelling efficiency and less vibration will help the dereasing of accidence.

Keywords