A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method  

Kim, Han-Eol (Dept. of Civil and Environmental Engineering, Hanyang University)
Nam, Kyoung-Min (Dept. of Civil and Environmental Engineering, Hanyang University)
Ha, Sang-Gui (Dept. of Civil and Environmental Engineering, Hanyang University)
Yoo, Han-Kyu (Dept. of Civil and Environmental Engineering, Hanyang University)
Publication Information
Journal of Korean Tunnelling and Underground Space Association / v.22, no.4, 2020 , pp. 451-468 More about this Journal
Abstract
Aging tunnels with small cross-sections can cause chronic traffic jams. This problem can be solved by widening the tunnel. In general, when the tunnel is expanded, the outer portion of the existing tunnel is excavated through a mechanical or blasting method. Such excavation affects not only the surrounding ground but also the existing tunnel. The application of the pre-cutting method can be a solution to these problems effectively. Therefore, if the widening of tunnel is performed by applying pre-cutting method, analysis of the impact of this method must be performed. In this study, in order to analyze the effect of applying pre-cutting in tunnel widening, numerical analysis is performed at six ground grades, from grade I to weathered rock. The analysis is performed with the expanding lane and the excavation length of pre-cutting as variables. In addition, the analysis is focused on the displacement of crown of the existing tunnel and the enlarged tunnel. As a result, the crown displacement of the enlarged tunnel is confirmed to converge at the same value regardless of the excavation length of the pre-cutting when the tunnel widening is completed. In the case of existing tunnels, uplift of crown occurs within 5 m of the front of the tunnel surface, and the shorter the excavation length of pre-cutting is found to be effective in preventing the occurrence of uplift.
Keywords
Tunnel enlargement; Pre-cutting method; Crown settlement; Enlarged tunnel; Existing tunnel;
Citations & Related Records
Times Cited By KSCI : 10  (Citation Analysis)
연도 인용수 순위
1 Cha, Y.H., Cho, G.C., Hong, E.S. (2016), "The numerical study on the ground settlement behavior of box type tunnel enlargement", Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 1, pp. 83-94.   DOI
2 Doo, J.K., Yang, H.S. (2001), "Effects of burden and free surface on the blast vibration", Explosives and Blasting, Vol. 19, No. 3, pp. 59-65.
3 Khan, B., Jamil, S.M., Jafri, T.H., Akhter, K. (2019), "Effects of different empirical tunnel design approaches on rock mass behaviour during tunnel widening", Heliyon, Vol. 5, No. 12, pp. 1-20.
4 Ki, K.C., Kim, I.J. (2002), "A study on the ground vibration of the front and the back direction of the free face in the bench blasting", Explosives and Blasting, Vol. 20, No. 2, pp. 21-31.
5 Kim, D.K. (2006), "Study on Mohr-Coulomb and Duncan-Chang models in tunnel analysis", Journal of the Korea Academia-Industrial Cooperation Society, Vol. 7, No. 3, pp. 414-419.
6 Kim, W.K., Baek, K.H., Seo, K.W. (2008), "The behavior characteristics of a working tunnel by the type of enlargement and ground strength", Proceedings of the 2008 Convention of Korea Society of Civil Engineers, Vol. 2008, No. 10, Daejeon, pp. 4152-4155.
7 Lee, H.B., Koh, S.Y., Jun, J.H., Yoon, H.T., Yi, N.H., Choi, H.S. (2020a), "Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 1, pp. 59-76.   DOI
8 Lee, J.H., Jin, H.S., An, J.S., Baek, Y., Yoon, H.S. (2020b), "A study on the suitability of the Mohr- Coulomb model for numerical analysis of ground excavation", The Journal of Engineering Geology, Vol. 30, No. 1, pp. 1-15.   DOI
9 Lee, K.K., Kim, G.S., Yang, K.J., Kang, D.W., Hur, W.H. (2012), "A study on movement of the free face during bench blasting", Explosives and Blasting, Vol. 30, No. 2, pp. 29-42.
10 Cho, G.C., Joo, G.W., Oh, T.M., Hong, E.S. (2016), "New hydro-mechanical tunnel excavation method using an abrasive waterjet system", Japanese Geotechnical Society Special Publication, Vol. 4, No. 6, pp. 132-137.   DOI
11 Lee, M.H., Kim, B.J., Jang, Y.S., Yun, J.N., Park, H.G. (2013), "Behavior and pillar stability of enlarged existing parallel tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 5, pp. 537-546.   DOI
12 Lunardi, G., Agresti, S., Basta, D. (2016), "The widening of the "Montedomini" A14 motorway tunnel in the presence of traffic", Proceedings of the ITA-AITES World Tunnel Congress 2016 (WTC 2016), San Francisco, pp. 1-10.
13 Lunardi, G., Belfiore, A., Selleri, A., Trapasso, R. (2014), "Widening the "Montedomini" tunnel in the presence of traffic: the evolution of the "Nazzano" method", Proceedings of the ITA-AITES World Tunnel Congress 2014 (WTC 2014), Foz do Iguacu, pp. 1-10.
14 Oh, S.W., Min, G.J., Park, S.W., Park, H., Noh, Y.S., Suk, C.G., Cho, S.H. (2018), "A study on the effect of artificial cutting slot on the fragmentation and vibration propagation in the full-scaled concrete block blasting", Tunnel and Underground Space, Vol. 28, No. 6, pp. 692-705.   DOI
15 Oh, T.M., Cho, G.C., Ji, I.T. (2013), "Effects of free surface using waterjet cutting for rock blasting excavation", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 1, pp. 49-57.   DOI
16 Oh, T.M., Joo, G.W., Cho, G.C., Ji, I.T., Jeong, S.Y. (2012), "Vibration reduced rock excavation using waterjet technology", Proceedings of the 2012 World Congress on Advances in Civil, Environmental, and Materials Research (ACEM' 12), Soeul, pp. 3318-3323.
17 Park, J.J. (2012), Analysis of tunnel loads by considering different soil conditions, Master Thesis, Yonsei University, pp. 38-39.
18 Seo, K.W., Baek, K.H., Kim, W.K. (2008), "A study on the ground behavior by the enlarged tunnel area", Proceedings of the 2008 Convention of Korea Society of Civil Engineers, Vol. 2008, No. 10, Daejeon, pp. 4180-4183.
19 Richart, F.E., Woods, R.E., Hall, J.R. (1970), Vibration of Soils and Foundations, Prentice-Hall, New Jersey, pp. 247-262.
20 Santamarina, J.C., Klein, K.A., Fam, M.A. (2001), Soils and Waves, John Wiley & Sons, New York, pp. 195-200.
21 Walsum, E.V. (1991), "Mechanical pre-cutting, a rediscovered tunneling technique", Rock Mechanics and Rock Engineering, Vol. 24, No. 2, pp. 65-79.   DOI
22 Wang, T., Wang, X., Tan, Z., Li, K., He, M. (2018), "Studies on ground settlement and pre-arching stress of pre-cutting tunnelling method", Tunnelling and Underground Space Technology, Vol. 82, pp. 199-210.   DOI
23 You, K.H., Jin, S.H., Kim, Y.J. (2017), "A stability study of deep and double-deck tunnels considering shape and reinforcing method of an enlarged section by using numerical analyses", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 1, pp. 41-56.   DOI
24 Zhang, X., Li, J., Xia, Y., Lin, L., Li, M., Chen, L. (2020), "Cutting characteristics and layout of pre-cutting machine cutter", Periodica Polytechnica Civil Engineering, Vol. 64, No. 1, pp. 188-197.