• Title/Summary/Keyword: tunnel support

Search Result 534, Processing Time 0.019 seconds

Design of Sedimentary Rock Slopes in River Diversion Works (가배수로 터널공사의 퇴적암 사면 안정화 설계)

  • Jee, Wang-Ruel
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.17-32
    • /
    • 1998
  • The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia, The power station will consist of a 210m height concrete faced rockfill dam. During the construction of the dam and the power facilities the Balui river has to be diverted by three diversion tunnels with a length of some 1,400m each. The inner diameter of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet and outlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four. defined Rock Mass Types (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each 'global' slope without any rock support and shotcrete system. In the second stage, it is calculated for each 'local'slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Flexural performance evaluation of fiber reinforced segments with GFRP plate (GFRP plate를 적용한 섬유보강세그먼트의 휨성능 평가)

  • Oh, Ri-On;Park, Sung-Ki;Sung, Sang-Kyung;Lee, Jae-Young;Kim, Hwang-Hee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.839-854
    • /
    • 2018
  • This study was performed to evaluate the performance of GFRP plate reinforced segments for TBM tunnel support. Recently, the SFRC segment has been applied to prevent local damage such as reduction of the amount of reinforcing bars of the segment, crack control and breakage. However, the steel fiber used in the SFRC segment has a problem of durability deterioration due to fiber corrosion. Compared with the RC segment, the maximum flexural load reduction of the SFRC segment hinders the broad application range of the TBM tunnel segment. Therefore, GFRP plate was considered as a stiffener for the maximum load increase of SFRC segment, and structural synthetic fiber without corrosive concern was used as a substitute for steel fiber. The flexural performance of the segment was evaluated by using the type of reinforcing fiber and GFRP plate thickness as the main parameters. As a result, the maximum load and the flexural toughness were increased by 21.78~23.03% and 0.5~7.96%, respectively, as compared with the segments reinforced with reinforcing fiber and GFRP plate of 3 mm thickness.

A Thermo-Hydro-Mechanical Coupled Numerical Simulation on the FE Experiment: Step 1 Simulation in Task C of DECOVALEX-2023 (Mont Terri FE 실험 대상 열-수리-역학 복합거동 수치해석: DECOVALEX-2023 Task C 내 Step 1 수치해석 연구)

  • Taehyun, Kim;Chan-Hee, Park;Changsoo, Lee;Jin-Seop, Kim
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.518-529
    • /
    • 2022
  • In Task C of the DECOVALEX-2023 project, nine institutes from six nations are developing their numerical codes to simulate thermo-hydro-mechanical coupled behavior for the FE experiment performed at Mont Terri underground rock laboratory, Switzerland. Currently, Step 1 for comparing the simulation results to field data is the ongoing stage, and we used the OGS-FLAC simulator for a series of numerical simulations. As a result, temperature increase depending on the heating hysteresis was well simulated, and saturation variation in the bentonite depending on phase change was observed. However, due to the suction overestimation, relative humidity and temperature change in the bentonite and the pressure variation in the Opalinus clay showed a difference compared to the field data. From the observation, it is confirmed that the effect of the bentonite capillary pressure is dominant to the flow analysis in the disposal system. We further plan to draw improved results considering tunnel support material and accurate initial water pressure distribution. Additionally, the thermal, hydrological, and mechanical anisotropy of the Opalinus clay was well simulated. From the simulation results, we confirmed the applicability of the OGS-FLAC simulator in the disposal system analysis.

Evaluation of bonding state of shotcrete lining using nondestructive testing methods - experimental analysis (비파괴 시험 기법을 이용한 숏크리트 배면 접착상태 평가에 관한 실험적 연구)

  • Song, Ki-Il;Cho, Gye-Chun;Chang, Seok-Bue;Hong, Eun-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.71-83
    • /
    • 2009
  • Shotcrete is an important primary support for tunnelling in rock. The quality control of shotcrete is a core issue in the safe construction and maintenance of tunnels. Although shotcrete may be applied well initially onto excavated rock surfaces, it is affected by blasting, rock deformation and shrinkage and can debond from the excavated surface, causing problems such as corrosion, buckling, fracturing and the creation of internal voids. This study suggests an effective non-destructive evaluation method of the tunnel shotcrete bonding state applied onto hard rocks using the impact-echo (IE) method and ground penetration radar (GPR). To verify previous numerical simulation results, experimental study carried out. Generally, the bonding state of shotcrete can be classified into void, debonded, and fully bonded. In the laboratory, three different bonding conditions were modeled. The signals obtained from the experimental IE tests were analyzed at the time domain, frequency domain, and time-frequency domain (i.e., the Short- Time Fourier transform). For all cases in the analyses, the experimental test results were in good agreement with the previous numerical simulation results, verifying this approach. Both the numerical and experimental results suggest that the bonding state of shotcrete can be evaluated through changes in the resonance frequency and geometric damping ratio in a frequency domain analysis, and through changes in the contour shape and correlation coefficient in a time-frequency analysis: as the bonding state worsens in hard rock condition, the autospectral density increases, the geometric damping ratio decreases, and the contour shape in the time-frequency domain has a long tail parallel to the time axis. The correlation coefficient can be effectively applied for a quantitative evaluation of bonding state of tunnel shotcrete. Finally, the bonding state of shotcrete can be successfully evaluated based on the process suggested in this study.

Development of an Improved Point Load Apparatus (개량형 점하중강도시험기의 개발)

  • Kim, Yong-Phil;Um, Jeong-Gi
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.473-478
    • /
    • 2009
  • The accuracy of point load apparatus is depend on point to point coaxial fitting. Also, the estimation of applied point load using the pressure gauge frequently lead to erroneous results. An improved point load apparatus has been developed in this study by mounting linear bearing on polished support rod, and eccentric error of point to point axis has been sustained less than 0.1 mm even under series of extreme work load conditions. Two digital displacement gauges are attached to measure the distance from point to point with sample specimen. A load cell mounted at the end of upper conical platen measure the applied net load on sample instead of preassure gauge. Total of 107 point load tests has been achieved to assure the quality and performance of developed apparatus. This exercise turned out to be successful.

Hierarchical GMPLS Label Merging Implementation methods Using ns-2 simulator (ns-2 시뮬레이터를 이용한 계층 구조를 갖는 GMPLS 레이블 머징 구현 방안)

  • Kim, Kyoung-Mok;Oh, Young-Hwan
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.43 no.11 s.353
    • /
    • pp.200-209
    • /
    • 2006
  • In recent years, studies on effective data services based on GMPLS are introduced so as to support excessive internet traffic. and filled operation can reduce transmission effectiveness. In this thesis we proposed merging algorithm with hierarchical structure and implementation procedure using ns -2 simulator. The structure composed of tunnel nodes and general nodes. Each node has threshold processing time. Result of that, the operation labels can be calculated. In order to evaluate the performance, we used ns-2 network simulator tool and used variable time parameters. The evaluated values can be used in surplus wavelength and be Possible to process additional traffic. Label merging will bring a decrease in the cost of channel sources for future network configuration.

Determination of Critical Slope Height for Large Open-pit Coal Mine and Analysis of Displacement for Slope failure Prediction (대규모 노천 석탄광산의 한계사면높이 결정과 사면파괴 예측을 위한 계측자료 해석)

  • Jung, Yong-Bok;SunWoo, Choon;Lee, Jong-Beom
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.447-456
    • /
    • 2008
  • Open-pit mine slope design must be carried out from the economical efficiency and stability point of view. The overall slope angle is the primary design variable because of limited support or reinforce options available. In this study, the slope angle and critical slope height of large coal mine located in Pasir, Kalimantan, Indonesia were determined from safety point of view. Failure time prediction based on the monitored displacement using inverse velocity was also conducted to make up fir the uncertainty of the slope design. From the study, critical slope height was calculated as $353{\sim}438m$ under safety factor guideline (SF>1.5) and $30^{\circ}$ overall slope angle but loom is recommended as a critical slope height considering the results of sensitivity analysis of strength parameters. The results of inverse velocity analysis also showed good agreement with field slope cases. Therefore, failure of unstable slope can be roughly detected before real slope failure.

Influence of Blast Furnace Slag and Anhydrite on Strength of Shotcrete (고로슬래그와 무수석고가 숏크리트의 강도에 미치는 영향)

  • Ryu, Sung-Hee;Shin, Kyung-Joon;Kim, Yun-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.1
    • /
    • pp.87-95
    • /
    • 2012
  • This study investigated the compressive strength, flexural strength, setting time, and rebound when blast furnace slag and anhydrite, which are widely used mineral admixtures for concrete, are applied to shotcrete. When Ordinary Portland Cement (OPC) was replaced at a rate of 10% with blast furnace slag and anhydrite, the initial and final setting time requirements were all satisfied. However, when OPC was replaced at a rate of 20%, final setting was delayed, revealing that this mixture was not suitable for shotcrete. Compressive strength test results showed that the mixture with 10% OPC replacement rate met the target strength at 1 day and 28 days for permanent tunnel support usage. Particularly, the mixture designed with OPC replacement by blast furnace slag and anhydrite at rates of 5% showed the highest compressive strength. Rebound measurements revealed that this mixture exhibited excellent performance with 23% reduction in the rebound compared to the shotcrete that was produced with only OPC binder.

Design of Fast Handover Mechanism in Proxy Mobile IPv6 Networks (Proxy Mobile IPv6 네트워크에서 Fast Handover 기법 설계)

  • Park, Byung-Joo;Han, Youn-Hee;Kim, Bong-Ki
    • Journal of KIISE:Information Networking
    • /
    • v.35 no.4
    • /
    • pp.301-310
    • /
    • 2008
  • In the existing literature, the handover process reveals numerous problems manifested by high movement detection latency. FMIPv6 can reduce packet loss using a tunnel-based handover mechanism. However, this mechanism may cause performance degradation due to the out-of-sequence packets. Recently. Proxy Mobile IPv6 is proposed for network-based mobility management to reduce overhead in mobile node. PMIPv6 can decrease handover latency which related overhead in MN by using network agent. In this paper, we proposed optimized fast handover scheme called Fast Proxy Mobile IPv6 (EF-PMIPv6). The proposed EF-PMIPv6 can support fast handover using fast IAPP and ND schemes. Further, a mathematical analysis is provided to show the benefits of our scheme. In the analysis, various parameters are used to compare our scheme with the current procedures, while our approach focuses on the reduction of handover latency.

Theoretical solutions for displacement and stress of a circular opening reinforced by grouted rock bolt

  • Zou, Jin-Feng;Xia, Zhang-Qi;Dan, Han-Cheng
    • Geomechanics and Engineering
    • /
    • v.11 no.3
    • /
    • pp.439-455
    • /
    • 2016
  • This paper presented solutions of displacement and stress for a circular opening which is reinforced with grouted rock bolt. It satisfies the Mohr-Coulomb (M-C) or generalized Hoek-Brown (H-B) failure criterion, and exhibits elastic-brittle-plastic or strain-softening behavior. The numerical stepwise produce for strain-softening rock mass reinforced with grouted rock bolt was developed with non-associative flow rules and two segments piecewise linear functions related to a principle strain-dependent plastic parameter, to model the transition from peak to residual strength. Three models of the interaction mechanism between grouted rock bolt and surrounding rock proposed by Fahimifar and Soroush (2005) were adopted. Based on the axial symmetrical plane strain assumption, the theoretical solution of the displacement and stress were proposed for a circular tunnel excavated in elastic-brittle-plastic and strain-softening rock mass compatible with M-C or generalized H-B failure criterion, which is reinforced with grouted rock bolt. It showed that Fahimifar and Soroush's (2005) solution is a special case of the proposed solution for n = 0.5. Further, the proposed method is validated through example comparison calculated by MATLAB programming. Meanwhile, some particular examples for M-C or generalized H-B failure criterion have been conducted, and parametric studies were carried out to highlight the influence of different parameters (e.g., the very good, average and very poor rock mass). The results showed that, stress field in plastic region of surrounding rock with considering the supporting effectiveness of the grouted rock bolt is more than that without considering the effectiveness of the grouted rock bolt, and the convergence and plastic radius are reduced.