Case Study of Carbonation on Lining Concrete in Vehicular Tunnel as Ventilation System (도로터널의 환기방식에 따른 라이닝 콘크리트의 중성화 사례 연구)

  • Choo, Jin-Ho;Maeng, Doo-Young;Hwang, In-Baek;Noh, Eun-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.417-422
    • /
    • 2005
  • The appropriate ventilation system in vehicular tunnel should be the most economical solution with regard to both construction and maintenance. The damages on tunnel lining was affected by formula of ventilation system in long vehicular tunnel. In this study, carbonation, one of main experimental items in precision safety diagnosis, was analyzed by contouring damage area with ventilation system. Considerations of carbonation were also given to the design and maintenance which manage the long-term safety in tunnel.

  • PDF

An Experimental Study of Smoke Movement and Evacuation in Road Tunnel (도로터널내 연기거동 및 피난에 관한 실험적 연구)

  • Kang Hyun-Wook;Lee Ho-Seok;Shin Young-Wan;Lee In-Ki
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.335-340
    • /
    • 2005
  • Recently, According to increased tunnel accident, a matter of concern in tunnel fire safety is on an interesting trend. In case of tunnel fire, Evacuation is a primary factor for refugee safety. Therefore safety measures should be taken to increase capability of evacuation. Evacuation walking speed and characteristics of movement in tunnel is differ from building or outdoor site so, these characteristics must be considered in tunnel safety planning. In this study has performed to evaluate the smoke movement and characteristics of evacuation by full-scale test method. and aimed for basic data establishment in characteristics of evacuation for tunnel safety system design.

  • PDF

A Method of Tunnel Analysis for Automatic Concrete Lining Construction Method (자동 터널라이닝 공법에 대한 해석기법)

  • 정한중;강석화;장성욱;이승욱
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1993.10a
    • /
    • pp.32-37
    • /
    • 1993
  • A method of tunnel analysis for a new type of tunnel construction method (ACLCM, Automatic Concrete Lining Construction Method) is presented here. ACLCM is an unique tunnel construction method which provides concrete lining at the end of shield machine by extruding concrete into the space between the excavated ground surface and the inner form (Automatic Concrete Lining Machine). Since behaviors of tunnel and the surrounding soils are greatly influenced by the construction method, existing tunnel design methods may not be applicable to the design of ACLCM tunnel. In this study, a method of ACLCM tunnel analysis is suggested to provide the prediction of behavior of ACLCM tunnel and surrounding soils as well as to check up the safety during the construction and after the completion of ACLCM tunnel

  • PDF

Development of Inspection System for Crack on the Lining of Concrete Tunnel (콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구)

  • 고봉수;손영갑;신동익;김병화;한창수
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.1
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

Structural Analysis of Tunnel Structures by Two and Three Dimensional Modeling (2차원 및 3차원 모델링에 의한 터널구조물의 구조해석)

  • Kim, Rae-Hyun;Chung, Jae-Hoon;Yhim, Sung-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.97-102
    • /
    • 2002
  • Two dimensional Analysis has been applied to most of tunnel lining design in these days. Two dimensional analysis uses beam or curved beam element for finite element method. But because the behaviors of tunnel concrete lining structure is near to shell, it is required to model the tunnel lining as shell structure for safety design of tunnel lining structure. In this paper, two dimensional analysis by beam element and the three dimensional analysis by shell element of tunnel concrete lining are studied, in which 3 type of tunnel lining and lateral pressure factors are considered. As results of the study, three dimensional analyses of the behavior of tunnel concrete lining structure considering lateral pressure factor shows that the moment of three dimensional analysis is greater than those of two dimensional analysis. The results shows that three dimensional analysis is necessary for safety design of tunnel lining.

Numerical Study of Reduction of Pressure variation and Micro-Pressure Wave for high-speed train in narrow tunnel (협소터널 고속 주행시 압력변동 및 미기압파 저감을 위한 수치해석적 연구)

  • Lee, Jung-Uk;Yun, Su-Hwan;Kwak, Min-Ho;Lee, Dong-Ho;Kwon, Hyeok-Bin;Ko, Tae-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.70-77
    • /
    • 2011
  • When a train passes a conventional tunnel at high speed, an environmental noise issue arises by pressure variation and micro-pressure waves at the exit of the tunnel. It is known that this issue can be reduced by using dummy tunnel duct on the tunnel entrance. We studied the variances of micro-pressure waves at the exit of tunnel and pressure variation within the tunnel, by altering surface area and length of the dummy tunnel duct. For analyze this train-tunnel relation problem, axi-simmetric steady compressible flow solver was used. Changing the length of the dummy tunnel duct can adjust pressure variation, changing the surface area of the dummy tunnel duct can adjust volume and pressure variation of the micro-pressure wave. Thus, optimized surface area and length of the dummy tunnel duct can simultaneously reduce environmental noise pollution by micro-pressure wave and issues by the pressure variation.

  • PDF

Development of Inspection and Diagnosis System for Safety and Maintenance in Tunnel (터널 유지관리를 위한 안전진단시스템 개발에 관한 연구)

  • Kim, Young-Geun;Baek, Ki-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.37-50
    • /
    • 2001
  • Recently, as tunnel structure is getting old, many deformations and defects have been occurred. As tunnel has the characteristics of underground structure, the estimation of the cause of deformation is very difficult. Then, it is necessary to investigate the state of tunnel lining and to estimate the deformation cause and safety for tunnel. In this study, inspection and diagnosis system for effective maintenance in tunnel was researched. Firstly, non-destructive techniques such as GPR (ground penetrating radar), impact echo test, and infrared thermal techniques were applied to tunnel lining inspection. Tunnel lining analysis system was developed to analyze the stability of tunnel. And, tunnel soundness evaluation system was developed to find the probable causes and indicate the method for repair and reinforcement for tunnel.

  • PDF

Stability of A Surcharged Tunnel under the Effect of Pre-Loading on the Adjacent Braced Wall (근접한 흙막이벽체에 가하는 선행하중의 영향을 받는 상재하중 재하 터널의 안정)

  • Kim, IL;Lee, Sang Duk
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.2
    • /
    • pp.10-27
    • /
    • 2008
  • When the ground is excavated adjacent to the existing tunnel, which is loaded by the surcharge on the ground surface, the tunnel stability would be very sensitive to the deformation of the ground induced by the horizontal displacement of braced wall. The stability of the existing surcharged tunnel could be controlled by pre-loading on the braced wall. In this paper, it was investigated, if it would be possible to keep the existing surcharged tunnel stable by preventing the horizontal displacement of a braced wall by imposing the pre-loading during the ground excavation. For this purpose, large scale model tests were performed in a scale 1/10 at the test pit which was 2.0m in width and 6.0m in height and 4.0m in length. Isotropic test ground was constructed homogeneously by wet sand. Model tunnel was constructed in the test ground. Surcharge was loaded on the ground surface above the tunnel. During the tests, the behavior of model tunnel and model braced wall was measured. Numerical analyses were also performed in the same condition as the tests. And their results were compared to that of the model tests. Consequently, the effect of a surcharge could be compensated by imposing the pre-loading on the braced wall. The existing tunnel and the braced wall could be kept stable by preventing the horizontal displacement of the braced wall through pre-loading, although the tunnel is surcharged.

  • PDF

A Study on Development of Lightweight Foam Filling Material for the Voids behind Tunnel Liner using Stone-dust and Application to the Old Tunnel (석분을 이용한 터널 뒤채움용 경량기포 충전재의 개발과 현장적용에 대한 연구)

  • Ma, Sang-Joon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.139-147
    • /
    • 2003
  • The most tunnel damage such as cracks or leakage which exist in tunnel lining commonly, is caused by the voids where exist behind the tunnel lining, through the tunnel safety inspections. These voids were analysed to affect to a stability of a running-tunnel seriously. The aim of this paper is to develope the lightweight foam concrete for tunnel backfilling material using stone-dust of cake state and to apply the lightweight foam concrete developed to the old tunnel. This paper shows the basic properties of lightweight foam concrete mixed with stone-dust including flow rate, unit volume weight, absorption rate and compressive strength. In addition, according to the designed compound ratio, the lightweight foam concrete was applied to the ASSM tunnel for an application assessment. The engineering application of the lightweight foam concrete as the old tunnel's backfilling material was confirmed in this assessment.

Numerical Study on the Effects of Pressure Wave Propagation for Tunnel Entrance Shape Change in High-Speed Railways (고속철도의 터널입구 형상변황에 따른 압력파동 현상에 관한 수치적 연구)

  • 목재균;백남욱;유재석;최윤호
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.2
    • /
    • pp.50-59
    • /
    • 1997
  • When a front head of train enters a tunnel at a high speed, compression wave is generated at tunnel entrance due to the confinement effect and propagated along the tunnel with sound of speed. The propagated compression wave is reflected at tunnel exit due to abrupt pressure change at passage. The reflected wave is expansion pressure wave. And when the rear head of train goes through the tunnel entrance, another expansion pressure wave is generated and propagated along the tunnel. The pressure drop occurs seriously around train when the two expansion pressure waves come cross on train in the tunnel. In order to reduce the pressure drop, the compression wave front must be controlled because the intensity and magnitude of pressure drop is nearly proportional to that of compression wave at tunnel entrance. This study relates to reduction of the pressure wave gradient with respect to tunnel entrance shape change with various kind of angle and rounding. The results show characteristics of wave propagation in tunnel, usefulness of characteristic curve to estimate proper time domain size in numerical study and measuring time in actual experiment. Also rounding is contributed to improve pressure wave front even if its radius is very small at tunnel entrance. In order to improve of pressure wave front at tunnel entrance, proper angle is prefered to rounding with big radius and an angle of around 14$^{\circ}$ is recommended according to this simulations, And it is expected to reduce additional pressure drop in tunnel when the location and the size of the internal space for attendant equipment are considered in advance.

  • PDF