Constructed wetlands are considered as an important tool for wastewater treatment, wastewater management and flooding control. In addition, one of the most promising technologies for application in many countries seems to be constructed wetlands, due to their properties such as utilization of natural processes, simple construction, operation and maintenance, process stability, cost effectiveness, etc. This study considered possibility of treatment of livestock wastewater using a constructed wetland. The removal efficiencies of $COD_{cr}$, TOC, TN, TP, SS, and color were 97.6%, 96.6%, 97.0%, 96.7%, 99.0%, and 85.6%, respectively. In particular, SS was completely removed. However, $Cl^{-}$ concentration of the constructed wetland effluent was higher than that in influent. In conclusion, constructed wetlands could be applied to livestock wastewater treatment if $Cl^{-}$ would be properly treated. Further, it needs time for stabilization to reduce the pollutants which were accumulated in soil.
The hybrid constructed wetland(HCW) as tertiary treatment process of a bio industrial wastewater treatment plant was employed to estimate applications for the reuse of final effluent. Raw wastewater was sequently treated through chemical and biological treatment processes and the biologically treated water was flowed into the HCW. The HCW system was composed of two constructed wetlands connected in series; The one is the aerobic constructed wetland with natural air draft system whose driving force for air supply was the difference between the temperature of the air inside the wetland and the ambient air, and the other is the anaerobic/anoxic constructed wetland. Average influent concentrations of BOD, SS, T-N and T-P in the HCW were 53mg/L, 48mg/L, 34mg/L and 3mg/L, respectively. After being treated at HCW, final effluent concentrations of BOD, SS, T-N and T-P were 2.3mg/L, 1.2mg/L, 7.95mg/L and 0.83mg/L, respectively. Referring to a reuse standard for a sewage wastewater, final effluent could sufficiently be reuse as landscaping, washing or agriculture water. HCW system with the aerobic/anaerobic combined constructed wetland could be achieved a high removal efficiency because each constructed wetland was functionalized to be removed efficiently organics, nitrogen and phosphorus. HCW system could be estimated to be successful application as tertiary treatment process of a various industrial and municipal wastewater.
Kim, Young Ryun;Kim, Sang Dan;Lee, Suk Mo;Sung, Kijun;Song, Kyo Ook;Son, Min Ho
Journal of Korean Society on Water Environment
/
v.29
no.3
/
pp.354-364
/
2013
The performance of the stormwater wetlands can be significantly influenced by antecedent stormwater in storage at the commencement of a stormevent. As inflows are intermittent and stochastic in nature, the evaluation of the treatment efficiency of a stormwater wetland should be considered by runoff capture and water treatment characteristics during interevent periods. In this study, analytical probabilistic model is applied to identity runoff capture rate and treatment efficiency of the stormwater wetland. To achieve this, continuous rainfall data recorded in Busan for 31 years has been analyzed to derive the runoff capture rate, and 1st order kinetic decay constants ($k_V$, 1/d) are calculated from regression analysis to identify pollutants removal during interevent periods. The results show that about 60.9% of annual average runoff is captured through the stormwater wetland. The annual average treatment efficiencies of SS, BOD, COD, TN and TP is about 11.4, 8.9, 9.8, 4.3 and 9.6%, respectively. The analytical model has been compared with the numerical model and it shows that analytical model is valid. Performance evaluation methods developed in this study has the advantages of considering characteristics of rainfall-runoff, facility type and pollutant removal.
Various development activities have lead to the destruction of the ecosystem such as natural wetlands. In order to protect these natural wetlands, the Ministry of Environment (MOE) in Korea enacted the Wetland Conservation Act in 1999 and designated protected areas for wetland conservation. The MOE adapted the use of Best Management Practices (BMP) such as retention ponds and constructed wetlands to treat the polluted water before entering the water system. One of these projects was a free-water surface flow (FWS) constructed wetland built as a secondary treatment unit for piggery wastewater effluent coming from a livestock wastewater treatment facility. Water quality monitoring for the constructed wetland was conducted during rainfall events. The results showed that the average removal efficiencies of TSS, BOD, TN, TP were 86, 60, 45, 70%, respectively. It was observed that the removal efficiency of particulate matter and phosphorus was high compared to nitrogen. Therefore, a longer hydraulic retention time was needed in order to improve the treatment efficiency of nitrogen. The results of this study can contribute to the wetland design, operation and maintenance of constructed wetlands.
A pilot study was performed to examine the feasibility of multiple stage of constructed wetland (CW) for nutrient removal. The system is composed of six wetland cells connected with water-ways. The hydraulic of wetland cells is designed as free water surface flow. The treatment capacity was $25m^3d^{-1}$ at HRT of about one day for each cell. The magnitude of nutrient removal was related with the length of wetlands and plant density. Total N and P removal rates were 1353 and $246mg\;m^{-2}d^{-1}$ respectively. The pilot-scale reactor was model as continuous flow system containing contribution of CSTR and PFR typed-reactors. The $k-C^*$ model equation was applied to predict N and P reduction. The result indicated the equation was well guided to estimate reduction of $NO_3-N$ and $PO_4-P$.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2000.10a
/
pp.490-499
/
2000
Several studies on development of water quality treatment systems by wetlands are on going because of their benefits of low construction cost and high efficiency of waste water treatment. The objectives of this study were to review the necessary contents of survey and design factors for constructing constructed wetlands and to examine the required wetland area to treat non-point source pollution through case studies. The measurement of water quality and quantity in precipitation period is needed to analyse the inflow characteristics of the non-point pollution and to determine the amount of design flow. The design inflow for constructing constructed wetland was determined to the total runoff from 30mm of daily rainfall in the AMC(III) condition of the SCS method and is similar 70% of the annual mean runoff. The natural type wetland system with 0.1m of water depth and 5 hours of detention time was applied. From the results of the case studies, 70% of inflow could be treated and 1∼3% of wetland area of the total basin is needed.
Constructed wetlands are established efficient technologies and provide sustainable solution for wastewater treatment. Similarly, biochar, which is an organic material, produced by means of pyrolysis, offers simple and low cost techniques to treat water and reduce carbon footprint. Combining both of these technologies can greatly augment the efficiency of the system. The objective of this study was to evaluate the efficiency of constructed wetlands by using biochar as media. Horizontal wetland beds with dimension ($1m{\times}0.33m{\times}0.3m$) were prepared using gravels and biochar, and cultivated with the Canna species. Synthetic wastewater was passed through these beds with average flow rate of $1.2{\times}10^{-7}m^3/sec$ achieving a retention time of three days. Pollutant removal performance was compared between the controlled and experimental wetland beds. This study reveals that the wetland with biochar were more efficient as compared to the wetland with gravels alone with average removal rate of 91.3% COD, 58.3% TN, 58.3% $NH_3$, 92% $NO_3-N$, 79.5% TP, and 67.7% $PO_4$.
Journal of the Korean Society of Environmental Restoration Technology
/
v.10
no.3
/
pp.1-7
/
2007
For waste water treatment, artificial wetland was constructed in 1998. The size of artificial wetland is 20m${\times}$200m, with sand and gravel as media and Phragmites japonica was implanted. The removal rate of BOD, TN, and TP were 86%, 33% and 25% from June 2004 to November 2005 respectively, while those were 88%, 38% and 55% in 1999. Organic materials and nitrogen compounds are still effectively removed, after 6 years of construction, but the removal efficiency of phosphorus compounds is reduced. So for sustaining of artificial wetland as waste water treatment system, the removal efficiency of phosphorus compounds must be elevated.
Magazine of the Korean Society of Agricultural Engineers
/
v.41
no.4
/
pp.37-46
/
1999
Field experimnet of constructed wetland for rural wastewater treatment was performed from July 1998 to April 1999 including winter to examine the seasonal effect on the wetland performance. The system worked without freezing even under $-10^{\circ}C$ of air temperature as long as watewater was flowing. BOD removal rates varied in similar pattern as the air temperature, and winter performance was relatively lower than that in the growing season. However, removing performance during winter was still significant, and BOD removal rates were almost the the same as in the growing season. SS removal rate was relativelyless affected by temmperature, but lower decay rate during the winter can result in accumulation of the SS in the system, which releases constituents in the next spring and can affect whole system performance. The winter removal rates of nutrients like T-N and T-P were decreased about half compared to the growing season and low temperature. To maintain stabilized wetland performanced including winter time, supplying minimum heating for plants could be an alternative in field application. Experimental data was compared with NADB(North Americal Wetlands for Water Quality treatment database), and general performance of the system was within the reasonable range. The pollutant loading and effluent concentration of the experimented system were in high margin. Base on the experiment and databases, the required effluent water quality could be achieved if loading rate adjusted as ilulstrated in the database.
This study was conducted to evaluate water treatment characteristics according to vegetated wetland(V) and open water(O) arrangements in free water surface constructed wetland. Three pilot-scale wetlands, V-V, O-V and V-O, were built and operated. $BOD_5$ was a slightly reduced at all the arrangements because the influent concentration was so low as background concentration of constructed wetlands. While T-N and T-P removal efficiency showed higher than 50% for all cases. The O-V arrangement showed the highest removal efficiency: 20% for $BOD_5$, 56% for SS, 59% for T-N and 72% for T-P. Effluent concentration of the O-V were significantly low compared with those from the V-O. O-V arrangement would be beneficial in the light of pollutant removal efficiency as well as construction cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.