• 제목/요약/키워드: transshipment

검색결과 157건 처리시간 0.026초

석탄류의 물류 프로세스 분석 (The Logistics Process Analysis of Coal Market)

  • 김경태;권용장;김영주;이석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3299-3305
    • /
    • 2011
  • Railroad is considered a representative echo-friendly mode, but there are many civil complaints due to dusts arising in the process of bulk cargo transportation. The freight station which is handling coal are slowly decreasing because of civil complaints. Generally gondolas and hopper cars kinds of freight cars have a role to carry coal such as anthracite and bituminous coal. The railroad competitiveness in the field of bulk cargo transportation is diminishing because there are cost increase and dust emission in the process of transshipment. In this study, we analysed the logistics process of bulk cargo transportation in the point of railroad and we could draw the problems from the logistics process. The results could be used to study various alternatives to improve the process of coal transportation.

  • PDF

절화류의 포장규격에 관한 연구 (A Research on Standard Dimensions for Fresh Cut Flower Packages)

  • 하영선;김종경
    • 한국포장학회지
    • /
    • 제12권1호
    • /
    • pp.1-5
    • /
    • 2006
  • Increasement of total cost during distribution chain requires packaging standardization to reduce extra handling and delays at transshipment point. In Korea, high valued agricultural products to export are most often shipped by air freight. Fresh flowers, in particular, the need to set package standard for air palletization are strongly recommended. This study tried to find an optimum standard dimensions for export packages. After extensive research on combinations of various flower dimensions, package dimensions and pallet sizes, we found that 96 inches pallet was most adequate for international air freight. Based on the results, new 40 standard package dimensions were introduced and stacking efficiencies were calculated.

  • PDF

환적화물의 이동경로 조사분석 및 비용에 관한 연구;일본 항만을 중심으로 (A Study on Analysis of Transshipment Routes and Cost;Based on Japanese Ports)

  • 김유나;안기명;김광희
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2007년도 추계학술대회 및 제23회 정기총회
    • /
    • pp.243-244
    • /
    • 2007
  • 부산항에서 환적되어 일본으로 향하는 화물을 대상으로 각 일본항만까지의 해상운송에 지역별 JR(Japan Rail) 컨테이너센터까지의 내륙운송을 합한 이동경로와 비용에 관한 측면을 조사하여 이를 시나리오 분석을 이용하여 연구를 수행하였다. 일본을 네 개의 지역으로 나누어 일본의 항만을 큐슈, 동부, 중부, 관서지역으로 구분하였으며, 일본 주요대형항만과 중소형항만을 비교하여 효율적인 운송루트를 찾는 것에 중점을 두고 분석을 수행하였다.

  • PDF

Some Considerations for a Regional Hub Port In Northeast Asia : with Particular Reference to Korea

  • Moon Seong-Hyeok
    • 한국항해항만학회지
    • /
    • 제28권9호
    • /
    • pp.783-790
    • /
    • 2004
  • For a nearly decade Busan has been the pre-dominant force in Northeast Asian port community, but during the last couple of years, several competitors have looked to directly challenge Busan's regional dominance, most notably, northern Chinese ports. Faced with this challenging and formidable trend, Busan has had to respond appropriately to ensure that Busan remains a regional hub well into the 21st century. The aim of this paper is to make some considerations for a regional hub container port in Northeast Asia in response to changes in the shipping industry with particular reference to Korea.

확정적 상황에서 컨테이너 재고량 분석을 위한 수리모형 (A Mathematical Model for an Analysis of Container Inventory under Deterministic Environment)

  • 배종욱;김기영
    • 경영과학
    • /
    • 제19권1호
    • /
    • pp.13-28
    • /
    • 2002
  • This Paper discusses how to estimate the container yard space of a port container terminal as well as how much the Inventory level of containers Is affected by related factors such as allowable dwell time for containers, handling volume per containership, and loading/unloading productivity of a port container terminal. Under the assumption of static relations among the factors, a model for estimating the container yard space is suggested. In terms of arrival patterns of containers, sub-models for export, import, and transshipment containers are constructed separately. A numerical example and the sensitivity analysis for some parameters are provided to help intuitive understanding the characteristics of the suggested model. The experimental results show that the allowable dwell time for containers is the most critical one of the factors to influence on the maximum Inventory level of containers.

교차분해법을 이용한 이단계유통체계에서의 중간창고의 입지선정 (Cross Decomposition Applied to the Intermediate Warehouse Location Problem)

  • 차동완;정기호;허원수
    • 한국경영과학회지
    • /
    • 제9권2호
    • /
    • pp.3-8
    • /
    • 1984
  • This paper considers the intermediate warehouse location problem in a two stage distribution system where commodities are delivered from the given set of capacitated factories to customers via uncapacitated intermediate warehouses. In order to determine the subset of warehouses to open which minimizes the total distribution costs including the fixed costs associated with opening warehouses, the cross decomposition method for mixed integer programming recently developed by T.J. Van Roy is used. The cross decomposition unifies Benders decomposition and Lagrangean relaxation into a single framework that involves successive solutions to a primal subproblem and a dual subproblem. In our problem model, primal subproblem turns out to be a transshipment problem and dual subproblem turns out to be an intermediate warehouse location problem with uncapacitated factories.

  • PDF

효율적인 환적컨테이너 화물처리를 위한 정보시스템에 관한 연구 (A Study on Information System for Effective Transshipment Container Handling)

  • 최형림;박남규;박용성
    • 한국정보시스템학회:학술대회논문집
    • /
    • 한국정보시스템학회 2004년도 추계학술대회
    • /
    • pp.401-408
    • /
    • 2004
  • 본 연구는 환적화물을 처리하는 모선사, 피더선사, 하주 등의 항만물류주체의 업무처리 생산성과 효율성을 제고하기 위한 정보시스템, Transhipment Container Handling System (TCHS)을 제시하였다. 국내의 환적화물에 대한 업무처리는 일반적으로 선사와 피더선사간의 환적화물계약업무 모선사의 환적화물을 피더선사에게 할당하는 업무, 마지막으로 미처 할당되지 못한 모선사의 환적화물과 피더선박의 잔여 선복을 거래하는 업무와 같이 3부분으로 구분된다. 그런데, 현재 이러한 업무를 처리함에 있어 개별적인 접촉과 적절한 정보시스템이 지원되지 않아서 많은 비용, 노력, 시간이 소비되고 있다. 그래서 본 연구에서는 환적업무에 관련된 항만물류주체의 요구조사를 통해 환적화물업무를 처리함에 있어 생산성과 효율성을 제고할 수 있는 정보시스템을 제안하였다. 본 연구에서 제안한 시스템은 현행 거래를 유지하면서, 각 업무의 효율적으로 지원하기 위한 시스템으로 온라인 계약지원시스템, 자동할당시스템, 협상기반 e-Marketplace 시스템으로 구성된다.

  • PDF

동북아 국가의 항만 개발정책에 따른 우리나라 항만의 대응전략 (The Strategy of Korean Port to Cope with Port Development Policy of Northeast Asian Countries)

  • 임종섭
    • 통상정보연구
    • /
    • 제8권1호
    • /
    • pp.183-201
    • /
    • 2006
  • According to the result of this study, China and Japan, the competing countries of Korea are progressing their policy to develop port more intensively than ever. To cope with this situation, it is required for Korean port to prepare systematic and strategic measure as follows. First, the cooperation strategy is necessary to operate domestic port. Second, it is required to set strategy to construct infrastructure for physical distribution in the port. Third, it is necessary to consider inducing transshipment cargo and development of strategy for connected transportation network. Fourth, the system of international physical distribution centering around complex behind ports shall be constructed.

  • PDF

오일허브 항만의 경쟁력에 영향을 미치는 요인에 관한 연구 (A Study on Factors Influencing the Competitiveness of Oil Hub Port)

  • 백인흠
    • 수산해양교육연구
    • /
    • 제22권2호
    • /
    • pp.195-204
    • /
    • 2010
  • As the throughout of transshipment oil cargo in Korea has been increasing, the importance and competition of the oil hub port has also been increasing. The aim of this study is to suggest how the factors influence the competitiveness of the oil hub port based on the specialists' opinions. For doing this, the evaluating factors were obtained from both previous studies and brainstorming of the professionals from the oil hub port. These were divided into groups by the ‘KJ method' according to 5 criteria and were made into a 3 level hierarchy structure. The ‘AHP method' identified the relative importance of factors and trends from the preferences of the specialists. This study presents the factors influencing the competitiveness of the oil hub port.

수송단위에 의한 지연납기를 고려한 최적 수송량 결정 모형 (An Optimal Distribution Model under Consideration of Delivery Unit and Backlogging Costs)

  • 이양호;안준홍;최경현
    • 대한산업공학회지
    • /
    • 제29권3호
    • /
    • pp.206-212
    • /
    • 2003
  • In this paper, we propose a mathematical optimization model with a suitable algorithm to determine delivery and backlogging quantities by minimizing the total cost including the penalty costs for delay. The system has fixed transshipment costs and demands are fulfilled by some delivery units that represent the volume of delivery amount to be shipped in a single time period. Since, backlogging is allowed, demands could be delivered later at the expense of some penalty costs. The model provides the optimal decisions on when and how much to he delivered while minimizing the total costs. To solve the problem, we propose an algorithm that uses the Lagrangian dual in conjunction with some primal heuristic techniques that exploit the special structure of the problem. Finally, we present some computational test results along with comments on the further study.