• Title/Summary/Keyword: transmission power

Search Result 5,780, Processing Time 0.041 seconds

A Method for Fault detecting on Power Transmission Network by use of M-sequence Correlation

  • Nishiyama, Eiji;Kuwanami, Kenshi;Owaki, Kosuke
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2570-2575
    • /
    • 2003
  • Monitoring a power transmission line is significant for power electric companies. In this paper, we propose a new method for detecting an fault point of power transmission line by use of M-sequence correlation technique. In this method, detecting signal is used as one or plural M-sequences ( same characteristic polynomial, including normal and reverse mark, synchronized ). In receiving point, we make same sequence with the input one and take crosscorrelation function between M-sequence and the received signal. We can see transfer fanctions of plural paths between inputs and a output taps separated from different of delay times on the crosscorrelation function, and from these transfer fanctions, so we compare them when fault occurred with in usual.

  • PDF

Identification of Correlative Transmission Lines for Stability Diagnosis of Power System (전력계통의 안정도 진단이 가능한 선로 선정에 관한 연구)

  • 조윤성;장길수;권세혁
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.5
    • /
    • pp.271-278
    • /
    • 2003
  • Power system stability is correlated with system structure, disturbances and operating conditions, and power flows on transmission lines are closely related with those conditions. This paper proposes a methodology to identify correlative power flows for power system transient and small-signal stability prediction. In transient stability sense, the Critical Clearing Time is used to select some dominant contingencies, and Transient Stability Prediction index is proposed for the quantitative comparison. For small-signal stability, this paper discusses a methodology to identify crucial transmission lines for stability Prediction by introducing a sensitivity factor based on eigenvalue sensitivity technique. On-line monitoring of the selected lines enables to predict system stability in real-time. Also, a Procedure to make a priority list of monitored transmission lines is proposed. The procedure is applied to a test system and the KEPCO systems in the year of 2003 and it shows capabilities of the proposed method

Protection Measure of Transmission Jumper Line by Gap Winds (협곡풍에 의한 송전선로점퍼선 횡진고장 방지대책)

  • Koh, Bong-Eon;Pyo, Gwang-Chan;Park, Jae-Hyung;Kang, Bum-Young;Jung, Hyun-Jong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1071-1077
    • /
    • 2009
  • Because several winds cause the a fault of transmission supply, KEPCO trys to protect the the trouble and supply the power stably. Kepco find out the weak mountains by winds and strengthen the power equipment annually. Power quality is the competition power in the international world and satisfy the customer using th power Therefore this paper deals with the fault relation between winds and transmission line.

Node Selection Algorithm for Cooperative Transmission in the Wireless Sensor Networks (무선 센서네트워크에서 협업전송을 위한 노드선택 알고리즘)

  • Gao, Xiang;Park, Hyung-Kun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1238-1240
    • /
    • 2009
  • In the wireless sensor network, cooperative transmission is an effective technique to combat multi-path fading and reduce transmitted power. Relay selection and power allocation are important technical issues to determine the performance of cooperative transmission. In this paper, we proposed a new multi-relay selection and power allocation algorithm to increase network lifetime. The proposed relay selection scheme minimizes the transmitted power and increase the network lifetime by considering residual power as well as channel conditions. Simulation results show that proposed algorithm obtains much longer network lifetime than the conventional algorithm.

Basic Design for the 500kV Transmission System In Myanmar (미얀마 500kV 송전망 기본설계)

  • Baek, S.D.;Kim, J.H.;Choi, Y.S.;Han, S.M.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.40-41
    • /
    • 2006
  • KEPCO conducted the project called the "Feasibility Study & Basic Designs for the 500kV Transmission System in Myanmar" as its second overseas project following the "Development Study on the Power System Network Analysis in Myanmar" as it first project. This paper deals with the design processes and results of 423 kilometers of the 500kV single circuit transmission lines and three substations. The main contents of the basic design include insulation design, transmission line design and substation design.

  • PDF

A Study on System Modeling, Capacity and Voltage rating to supply HTS Power Transmission Cable to Metropolitan Area (고온초전도 케이블의 대도시 계통적용을 위한 모델링 및 송전용량과 전압계급의 검토)

  • 최상봉;정성환;김대경;김학만;문영환;성기철
    • Progress in Superconductivity and Cryogenics
    • /
    • v.4 no.1
    • /
    • pp.61-65
    • /
    • 2002
  • It becomes difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. This paper presents possible applications of an HTS superconducting power cables for transmitting electric power in metropolitan areas. Reflected were its important distinction such as compactness for installation in underground ducts and considerably high efficiency compared with present underground cables. In this paper, system modeling, transmission capacity and voltage class of compact HTS cables which should be applied to existing ducts were reviewed. Based on this, the following items on urban transmission system are examined. (1) A method of constructing a model system to introduce high temperature superconducting cables to metropolitan areas is presented. (2)The maximum outer diameter of HTS cables to be accommodated in exiting ducts is calculated based on the design standards for current cable ducts. (3)The voltage level that can be accommodated by existing ducts is examined.

The Calculation of Lightning Flashover rate of 345kV/154kV Transmission Tower (345kV 및 154kV 송전철탑의 뇌사고율 예측계산)

  • Shim, E.B.;Woo, J.W.;Kwak, J.S.;Min, B.W.;Hwang, J.I.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.452-454
    • /
    • 2001
  • This paper described the calculation results of lightning flashover rate on the 345kV and 154kV transmission system of KEPCO. The back-flashover rate and shielding failure rate was calculated by FLASH(lightning flashover rate calculation program from IEEE) and KEPRI's own program which is based on the EGM(Electro Geometrical Model) method. The estimated lightning flashover late of 345kV transmission system of double circuit was 1.0 flash per 100km-year, and the lightning flashover rate of 154kV transmission line was 2.0 flash Per 100km-year approximately.

  • PDF

Effect of Phase Arrangement on Magnetic Field of Overhead Transmission Lines (송전선로의 상배열이 자계 크기에 미치는 영향)

  • Kim, Sang-Beom;Lee, Dong-Il;Shin, Koo-Yong;Kim, Jeong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1678-1680
    • /
    • 1998
  • The purpose of this study is to obtain optimum arrangement of phase conductors in minimizing magnetic field from overhead transmission lines. Data of the transmission lines rated 345 kV of the KEPCO(Korea Electric Power Company)'s system were used. For a three phase-double circuit transmission line, low-reactance arrangement is optimum in minimizing magnetic fields. For a three phase-four circuit, optimum phase arrangement is a-b-c-b-a-c(lower two circuits, clockwise)/b-c-a-c-a-b(upper two circuits, clockwise).

  • PDF

Measurement and Analysis of Electric and Magnetic Fields Near Overhead Transmission Lines (송전선로의 전자계 크기 측정 및 분석)

  • Kim, Sang-Beam;Cho, Seong-Bae;Shin, Koo-Yong;Lee, Dong-Il;Kim, Jeong-Boo
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1908-1910
    • /
    • 1997
  • The electric and magnetic fields (EMFs) near 345/154 kV overhead transmission lines were measured. The average values of maximum electric field and magnetic field for 44 transmission lines were 1.11 kV/m and 24.5 mG, respectively. These values were lower than any standards of advanced countries. The EMFs of distribution lines and substation, and electric appliances were also measured and compared with those of transmission lines.

  • PDF

Cooperative transmission protocol in the relay network (릴레이 네트워크에서의 협업전송 프로토콜)

  • Xiang, Gao;Park, Hyung-Kun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.1046-1048
    • /
    • 2009
  • Cooperative transmission is an effective technique to combat multi-path fading and reduce transmitted power. Relay selection and power allocation are important technical issues to determine the performance of cooperative transmission. In this paper, we proposed a new multi-relay selection and power allocation algorithm to increase network lifetime. The proposed relay selection scheme minimizes the transmitted power and increase the network lifetime by considering residual power as well as channel conditions. Simulation results show that proposed algorithm obtains much longer network lifetime than the conventional algorithm.

  • PDF