• 제목/요약/키워드: total project profit

검색결과 30건 처리시간 0.018초

A Study on the Feasibility analysis model for Housing Environment Improvement Project of Depressed region - Focused on the project by the public sector - (낙후지역 주거환경개선사업 타당성분석 평가모델 연구 - 공공(公共) 시행사업을 중심으로 -)

  • Choi, Jung-Min;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • 제14권1호
    • /
    • pp.83-90
    • /
    • 2012
  • The purpose of this study was to set and analyze the standard model for prioritizing and deciding to take part in housing environment improvement project in the perspective of the public sector. The results of this study were as follows. The location competitiveness, potential demand, marketability and competitive price, etc were selected by assessment indicators. And Various indicators, including of the size of the area, public transportation, accessibility, convenience of living and the influx of the population, were used by weights indexes. The profit of local residents and the public promoter, variability of earnings, sensitivity analysis and the ratio of money in reserve, etc were also established as detailed indexes for the profitability and business risk analysis. To analyze the cash flow of the project process and review the necessary capital in advance, the payback, total working expenses, gearing ratio and sensitivity of a risk, etc were also set as additional detailed indexes. Lastly, considering it is quasi-public projects, the measure to protect tenants, necessity need of redevelopment and local government's will were additionally used by indexes. And Points were distributed on the importance of each index and scored out of 100. It will allow for the public project promoter to decide rationally whether to come in on the project. The public project promoter like the Korea Land and Housing Corporation will be able to make use of various indexes are based on this study to make decision whether joining the housing environment improvement project in depressed region.

A Verification of the Project Manager-Oriented Model for Apartment Construction in the Public Sector (공공 아파트건설의 PMr형 사업관리모델에 대한 실증적 사레검증)

  • Sohn Jeong-Rak;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제5권6호
    • /
    • pp.191-202
    • /
    • 2004
  • In this study, the project manager-oriented organization model has been verified by analysing it with forming a clear definition of detailed unitary duty entity to develop current non-efficient CM system constituted by functional organization with the decentralized responsibility and apply the model As a result from verification that the model provides valid solutions by comparing it with the existing, the model is better than the existing in cost savings, target profit sales rate, total rate of new on sales. Moreover, various activities in cost savings and cases where improvement is feasible are executed. However, the model caused some problems in organizational operation, project management and in division of duties so this study proposed improving management method

A METHODOLOGY TO EVALUATE THE EFFECTIVENESS OF REGIONAL SCALE FOR NON-POINT SOURCE LOADS

  • Lee, Ju-Young;Choi, Jae-Young
    • Environmental Engineering Research
    • /
    • 제11권4호
    • /
    • pp.194-200
    • /
    • 2006
  • Recently, the population growth, industrial and agricultural development are rapidly undergoing in the Lower Rio Grande Valley (LRGV) in Texas. The Lower Rio Grande Valley (LRGV) composed of the 4 counties and three of them are interesting for Non-point and point source pollutant modeling: Starr, Cameron, and Hidalgo. Especially, the LRGV is an intensively irrigation region, and Texas A&M University Agriculture Program and the New Mexico State University College of Agriculture applied irrigation district program, projects in GIS and Hydrology based agricultural water management systems and assessment of prioritized protecting stream network, water quality and rehabilitation based on water saving potential in Rio Grande River. In the LRGV region, where point and non-point sources of pollution may be a big concern, because increasing fertilizers and pesticides use and population cause. This project objective seeks to determine the accumulation of non-point and point source and discuss the main impacts of agriculture and environmental concern with water quality related to pesticides, fertilizer, and nutrients within LRGV region. The GIS technique is widely used and developed for the assessment of non-point source pollution in LRGV region. This project shows the losses in $kg/km^2/yr$ of BOD (Biological Oxygen Demand), TN (total Nitrogen) and TP (total phosphorus) in the runoff from the surface of LRGV. Especially, farmers in Cameron County consume a lot of fertilizer and pesticide to improve crop yield net profit. Then, this region can be created as larger nonpoint source area for nutrients and the intensity of runoff by excess irrigation water. And many sediment and used irrigation water with including high nutrients can be discharged into Rio Grade River.

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권4호
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

An Empirical Study about Assessment of the JIT System: on korean semi-production firm

  • Lee, Eung-Kweon
    • International Commerce and Information Review
    • /
    • 제7권2호
    • /
    • pp.75-94
    • /
    • 2005
  • This study is focused on evaluating the computer-integrated just-in-time (CI-JIT) production system of a semi-conductor manufacturing firm in Korea. Approaching the mid-1980s, the emphasis was on low price, low-cost operations, and quality, especially in USA. American companies have shifted output to low-wage countries like the Philippines, Korea, Japan, Malaysia and allied countries that can make quality products at low prices. Korea and other Asian countries forego short-term profits to gain a solid foothold in a product market, recognizing that larger market share leads to lower cost and higher profit in the long run. They bring manufacturers and suppliers together to improve material management and operation management, using project teams that investigate topics, such as Just-In-Time(JIT)manufacturing, among others. The "Kanban" word means "card" in Japanese, and is used to indicate the desired final delivery schedule. The operation for a particular item produced is scheduled for a specific time. The same process is extended to the external suppliers. More recently, the cards are gradually being replaced by electronic procedures that follow the same concept. Its capacity must be capable of handling the various transactions required by the JIT coverage as well as some allowances for expanded applications.

  • PDF

The Economic Feasibility Analysis of Crop Cultivation Practice Project in Pirganj and Kurigram Districts, Bangladesh (작물재배기술의 경제적 타당성 분석 : 방글라데시 피르간즈군과 쿠리그람군 사례)

  • Tabassum, Nazia;Lim, Jae-Hwan;Gim, Uhn-Soon
    • Korean Journal of Agricultural Science
    • /
    • 제35권1호
    • /
    • pp.85-100
    • /
    • 2008
  • The United States Department of Agriculture (USDA) funded collaborative project on The Economic Feasibility Analysis of Crop Cultivation Practice Project in Pirganj and Kurigram Districts in Bangladesh will started during 2008-2012, for 4 years with total project cost of US$ 571,270. The project will be implemented in 6 villages; has 1,097 hectares areas which is divided into 948 hectares of agricultural land, 52 hectares of forest land and 345 hectares of other land, covered 1,059 households equal to 5,305 persons in Pirganj and Kurigram districts The project has proposed to be implemented in joint collaboration by Bangladesh Agricultural Research Council (BARC), Bangladesh Agricultural Research Institute (BARI) and Rangpur Dinajpur Rural Service (RDRS) Bangladesh with full participation of the farmers' groups of respective project site. The specific objectives of the project are: (1) to estimate the productivity of paddy, wheat, maize, tobacco and sugarcane (2) to determine the cost of production and returns to the above mentioned crops (3) to study the interrelationship between inputs and output of the above mentioned crops and (4) to examine the resource utilization patterns at farm level. In this project analysis, the net incremental profit is US$33,028. The expected incremental project benefit and incremented production cost are estimated as US$ 219,959 and US$ 186,931 respectively. The financial decision making criteria would be followed in this crop cultivation practice project. After the project implementation, the expected project benefits are assumed to be continued for 15 years. The benefit cost ratio (B/C) of the project is estimated at 1.077 (table 11) when using discount rate of 10% as an opportunity cost of capital in Bangladesh. FIRR of project is estimated at 26.15% which is bigger than the opportunity cost by more than double. So this project is financially feasible and acceptable. Therefore, this project should be extended to other areas to increase the farm income and economic growth of marginal poor farmers in Bangladesh.

  • PDF

A Decision Support Model for the Exchange Risk Management of Overseas Construction Projects (해외 건설 프로젝트의 환리스크 관리를 위한 의사결정 지원 모델)

  • An, Chi-Hoon;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • 제13권3호
    • /
    • pp.109-121
    • /
    • 2012
  • Overseas construction project orders have shown steady increase since 2001, and it took 44.5% of the total construction project orders in 2010. Overseas construction project needs more complex risk management because it is affected by more various circumstance factors than the domestic construction is. Previous studies have centered on the internal risk factors to assist the decision-making, but there are few researches on the importance and techniques of foreign exchange risk management. Inadequate management of foreign exchange risk has been found to cause huge damages due to the lacking recognition on the importance of foreign exchange risk management. Therefore, current study designed a foreign exchange risk manage model to help efficient management and decision-making. This model was developed as a technique to meet the demand of the increasing overseas construction projects for the efficient management of foreign exchange risk, and the technique will lower the risk with more and more accurate outcome by accumulating the data of profit-and-loss.

Graphs Used in ASEAN Trading Link's Annual Reports: Evidence from Thailand, Malaysia, and Singapore

  • Kurusakdapong, Jitsama;Tanlamai, Uthai
    • Journal of Information Technology Applications and Management
    • /
    • 제22권3호
    • /
    • pp.65-81
    • /
    • 2015
  • This study reports a preliminary finding of the types and numbers of graphs being presented in the annual reports of about thirty top listed companies trading publicly in the stock markets of three countries-Thailand (SET), Malaysia (BM), and Singapore (SGX)-that were chosen based on their inclusion in the ASEAN Stars Index under the ASEAN Trading Link project. A total of 6,753 graphs from nineteen sectors were extracted and examined. Banking, real estate, and telecommunications are ranked the three most condense sectors, accounting for 50.2% of the total number of graphs observed. The three most used graphs are the Conservative Bar, Donut graph and Stack Bar. Less than one percent of Infographic type graphs were used. The five most depicted graphed variables are Asset, Revenue, Net profit, Liability, and Dividend. Using rudimentary framework to detect distorted or misleading statistical graphs, the study found 60.6% of the graphs distorted across the three markets, SET, BM, and SGX. BM ranked first in percentages of graphs being distortedly presented (73%). The other two markets, SET and SGX, have about the same proportions, 53.88% and 53.03%, respectively. Likewise, the proportions of Well-designed versus Inappropriate-designed graphs of the latter two markets are a little over one time (SET = 1 : 1.17; SGX = 1 : 1.13), whereas the proportion is almost triple for the BM market (BM = 1 : 2.70). In addition, the trend of distorted graphs found is slightly increasing as the longevity of the ASEAN Stars Index increases. One possible explanation for the relatively equal proportion of inappropriate graphs found is that SET is the smallest market and SGX, though the largest, is the most regulated market. BM, on the other hand, may want to present their financial data in the most attractive manner to prospective investors, thus, regulatory constraints and governance structure are still lenient.

Economic Evaluation Method Based on Rate of Return for Multiple Investment Alternatives (다수의 투자대안들에 대한 수익률 기준의 경제성 평가방법)

  • Kim, Jin Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제42권1호
    • /
    • pp.137-142
    • /
    • 2019
  • There are two methods for evaluating two or more mutually exclusive projects. One is a total investment approach and the other is an incremental investment approach. The former can rank projects by the criterion of the net present value, but the latter can't do it. An incremental investment approach is only possible when all pairwise alternatives are compared. Thus an incremental investment approach is superior in ranking them over an incremental investment approach. To do so, a principle of comparison must be established. Comparisons of profitability are reasonable when operating the same amount of investment over the same period of time. One principle is that all projects are invested in the largest of the projects. Another principle is that all projects are invested during the longest project life of the projects. In this paper, even if the principle is followed, it will be shown that the external rate of return fails to rank them. However, the productive rate of return criterion would prove to be able to rank them like the net present value standard, provided that the principle of comparison is kept. In addition, rate of returns can be assessed so that all mutually exclusive projects can be compared at once, such as on the criterion of the net present value. That is, it can be also compared with many other returns, such as the profit rates on financial investments or real investments.

A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction (임시 활주로 건설공사의 위험영향 및 손실비용 사례분석)

  • Kang, Hyunwook;Lee, Wonbae;Kim, Minjung;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • 제21권1호
    • /
    • pp.32-39
    • /
    • 2020
  • The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.