• Title/Summary/Keyword: time schedule

Search Result 1,364, Processing Time 0.028 seconds

Load Carrying Capacity of Top Down Prefounded Columns on Different Excavation Schedule (굴착순서에 따른 Top Down 선기둥 지지력 산정)

  • Rhim, Hong-Chul;Hwang, Hee-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.45-52
    • /
    • 2006
  • Top Down method is more widely used in downtown construction, recently. As underground construction constitutes a significant portion of the total construction cost and time in Top Down construction, it is important to develop a construction method to reduce the time required in underground works. The purpose of this study is to analyze load carrying capacity of Top Down prefounded columns on different excavation schedule. When several floors are excavated, the valid buckling length of prefounded column is increased and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3 story whether 2 or 3 stories are excavated. However, several columns are not safe from B4 story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that the first three stories in the basement are excavated, and then excavate B4 story after placing concrete on B1 and B2 floor.

Development of a Scheduling System for Mould and Die Manufacturing Factory Using Microsoft Project 98 (Microsoft Project 98을 이용한 금형공장의 일정계획 시스템 개발)

  • Ju, Sang-Yoon;Ok, Kyung-Jin
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.246-252
    • /
    • 2000
  • As moulds and dies are manufactured through complex processes under the make-to-order production environment, it is very difficult that the manufacturing activities as like observance of the due date, trace of the progress, etc are controlled with a real time. In this paper, a schedule-planning system using the commercial software Microsoft Project 98 is developed to control the procedures of mould and die manufacturing with real time. Once an initial schedule is planned from the BOM information in the intranet, it is rescheduled by data collected from machines on the shop floor. The system is suitable to medium- or small-sized manufacturing companies as well as large-sized ones, because it can be installed with a low cost.

  • PDF

A JIT Production Scheduling in Multi-Level Parallel Machine Flow Shops (다단계 병렬기계(多段階 竝列機械) 흐름생산에서 JIT 일정계획)

  • Yoo, Chul-Soo;Lee, Young-Woo;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.171-180
    • /
    • 1994
  • Defined is a Multi-level Parallel Machine Flow-Shop (MPMFS) which reflects some real world manufacturing situations. Just-In-Time (JIT) philosophy is applied to the MPMFS scheduling in order to achieve lowering work-in-process inventory level as well as meeting due dates. A schedule generating simulator is developed. The latest start time of each operation is determined by a backward simulation followed by another forward simulation to analyze the schedule feasibility and actual inventory level. Reasonable schedules are available through adjusting some parameters for allowance factors such as set-up times of machines and other environmental changes. The SLAMSYSTEM under Window is employed for this processing with some input/output data handling processes devised under DOS.

  • PDF

Duplication with Task Assignment in Mesh Distributed System

  • Sharma, Rashmi;Nitin, Nitin
    • Journal of Information Processing Systems
    • /
    • v.10 no.2
    • /
    • pp.193-214
    • /
    • 2014
  • Load balancing is the major benefit of any distributed system. To facilitate this advantage, task duplication and migration methodologies are employed. As this paper deals with dependent tasks (DAG), we used duplication. Task duplication reduces the overall schedule length of DAG along-with load balancing. This paper proposes a new task duplication algorithm at the time of tasks assignment on various processors. With the intention of conducting proposed algorithm performance computation; simulation has been done on the Netbeans IDE. The mesh topology of a distributed system is simulated at this juncture. For task duplication, overall schedule length of DAG is the main parameter that decides the performance of a proposed duplication algorithm. After obtaining the results we compared our performance with arbitrary task assignment, CAWF and HEFT-TD algorithms. Additionally, we also compared the complexity of the proposed algorithm with the Duplication Based Bottom Up scheduling (DBUS) and Heterogeneous Earliest Finish Time with Task Duplication (HEFT-TD).

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Automatically Registering Schedules from SMS Messages on Handheld Devices (휴대전화에서 단문 메시지로부터 일정 자동 등록)

  • Kim, Jae-Hoon;Kim, Hyung-Chul
    • Korean Journal of Cognitive Science
    • /
    • v.22 no.1
    • /
    • pp.1-18
    • /
    • 2011
  • With rapid spread of handheld devices like cellular or smart phones, a short message service (SMS) comes on the public as a communication means. SMS is very cheap and can be easily written down on the storage in order not to forget it, hence it is widely used to inform schedules (time and place). In this paper, we develop a system for automatically registering schedules extracted from SMS text messages. SMS text messages are very short and concise, but include a lot of Internet words like slangs and abbreviations. These have made it difficult to extract information on schedules from them. Also handheld devices have some limitations on computing power and storage and then applying general natural language processing modules like morphological analysis to the devices are somewhat hard. To relax these burdens, we extract schedule informations from SMS messages using machine learning methods like condition random field (CRF) without using any language processing modules and register the informations on the schedule management system of handheld devices. Our proposed automatic schedule registration system has implemented on Samsung Omnia phone for experiments.

  • PDF

A Development of Evaluation Index for Bus Demand-Elastic Schedule Management (수요탄력적 버스배차관리를 위한 평가지표 개발 및 적용)

  • Lee, Ho-Sang;Chang, Hyun-Ho;Kim, Young-Chan;Hwang, Kyong-Soo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.8 no.2
    • /
    • pp.1-13
    • /
    • 2009
  • Although enormous data have been collected in major cities (Korea) by APTS(Advanced Public Transit Systems), most of studies related to bus schedule management evaluation have confined to headway adherence and on-time performance. Therefore, bus operation management have been very lack of using APTS data. This study uses coefficient of correlation to evaluate bus company's schedule management level. However, direct application of coefficient of correlation has inequitable problem because of many limitation(number of vehicle, headway, etc). and so variable calibration method was developed and applied to cope with these problems. Thus, demand-elastic management evaluation index was developed. For verifying the equity of developed index, it is applied to Seoul bus routes. It is expected for the developed index to contribute into the demand-elastic management of bus schedule.

  • PDF

Design of Protocol for Collaborative Multimedia Applications (협동적 멀티미디어 응용을 위한 프로토콜의 설계)

  • Hwang, Een-Jun
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.1
    • /
    • pp.25-35
    • /
    • 2002
  • Many multimedia presentation applications involve retrieval of objects from more than one collaborating server. Presentations of objects from different collaborating servers might be interdependent. This implies that objects should be retrieved from remote servers and delivered continuously according to given time constraints. Such applications need an estimate of the avaliable network resources to each of the collaborating servers and local system resources in order to identify a schedule for retrieving the objects composing the presentation. A collaborating server can suggest modifications of the retrieval schedule depending on its load. these modifications can potentially affect the retrieval schedule for other collaborating applications. Hence, a sequence of negotiations has to be carried out with the collaborating servers in order to commit for a retrieval schedule of the objects composing the presentation. In this paper, we propose an application sub-layer protocol, RLCP(Resource Lock Commit Protocol), for handling the negotiation and commitment of the resources required for a collaborative multimedia presentation and apply it to distributed video presentation application.