• Title/Summary/Keyword: time schedule

Search Result 1,354, Processing Time 0.038 seconds

The Effects of new Work Schedule on the Allocation of Time by Married Couple (조기출퇴근제 실시에 따른 부부의 생활시간에 관한 연구)

  • 홍향숙
    • Journal of the Korean Home Economics Association
    • /
    • v.32 no.2
    • /
    • pp.49-60
    • /
    • 1994
  • Recently there has been new work schedule developed in some companies which means starting the work at 7 and finishing at 4 This article studied on the effects of new work schedule on the time allocation by married couples. It was compared with the time spent by married couples in group of old work schedule. And it studied whether the change of work schedule affects the time allocation and satisfaction of couples. This survey was conducted from November to December 1993 One hundred and twenty none couples were considered to be valid sample for this study. The findings of this study are as follows: 1. Couples with new work schedule did perceive changes in the time allocation. 2. The total time for transportation and market work of husbands was decreased and leisure time showed a increase when there is new work schedule. 3. Husbands with new work schedule perceived that they spent more time in the household work leisure sharing with their children and sharing with spouses than husbands with old work schedule. 4. Couples with new work schedule showed higher marital satisfaction and family life satisfaction than couples with old work schedule.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Prevention of delay in implant services using time schedule (타임스케줄을 이용한 임플란트 수술의 지연 개선)

  • Ji-Yeon, Park
    • Journal of Korean Academy of Dental Administration
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2022
  • This study introduces research on the quality of medical services, optimization of medical services, dental medical services, implant medical services, and time schedules, as well as the effective process of dental implant medical services, which is expensive and requires a long treatment period. For improvement, it is suggested to evaluate using a time schedule. In this method, a time schedule is prepared in which each step, starting from the patients appointment until the completion of the treatment process, is allotted a certain time. This schedule was finalized in consultation with the employees. When performing all implant operations, the starting time of each item was checked to evaluate the degree of compliance and to understand any reasons for delay in each step. After identifying the causes for delay at each step, suitable steps to rectify the drawbacks were developed, and an optimal plan for patient management was determined. Changes in waiting time and human resource utilization were shown as concrete data, suggesting that such a schedule is meaningful as a decision-making support tool.

Improvement of Drying Schedule for Domestic Red Pine Lumber (국산 소나무재 건조스케줄 개량에 관한 연구)

  • Lee, Hyoung-Woo;Kim, Kyung-Yong
    • Journal of the Korean Wood Science and Technology
    • /
    • v.33 no.6 s.134
    • /
    • pp.25-30
    • /
    • 2005
  • This experiment was carried out for the improvement of drying schedules for 50 mm-thick Japanese red pine (Pinus densiflora Sieb. et Zucc.) lumber. Drying rates were analyzed comparatively after drying to 15% of final moisture content through the applications of conventional kiln drying schedule, time schedule, continuously rising temperature schedule, and drying rate schedule. As results drying rate of 50 mm-thick red pine lumber was 0.53%/hr with conventional kiln drying schedule, 0.9%/hr with time schedule, 2.29%/hr with continuously rising temperature schedule, and 1.52%/hr with drying rate schedule, respectively.

A Genetic Algorithm for Route Guidance System in Intermodal Transportation Networks with Time - Schedule Constraints (서비스시간 제한이 있는 복합교통망에서의 경로안내 시스템을 위한 유전자 알고리듬)

  • Chang, In-Seong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.2
    • /
    • pp.140-149
    • /
    • 2001
  • The paper discusses the problem of finding the Origin-Destination(O-D) shortest paths in internodal transportation networks with time-schedule constraints. The shortest path problem on the internodal transportation network is concerned with finding a path with minimum distance, time, or cost from an origin to a destination using all possible transportation modalities. The time-schedule constraint requires that the departure time to travel from a transfer station to another node takes place only at one of pre-specified departure times. The scheduled departure times at the transfer station are the times when the passengers are allowed to leave the station to another node using the relative transportation modality. Therefore, the total time of a path in an internodal transportation network subject to time-schedule constraints includes traveling time and transfer waiting time. In this paper, a genetic algorithm (GA) approach is developed to deal with this problem. The effectiveness of the GA approach is evaluated using several test problems.

  • PDF

A Study on The Novel Switch Architecture with One Schedule at K-Time Slots (K-Time 슬롯당 한번의 스케줄을 갖는 독창적인 스위치 아키텍쳐에 관한 연구)

  • Sohn, Seung-il
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.7 no.7
    • /
    • pp.1393-1398
    • /
    • 2003
  • In this paper, we propose a new switch architecture with one schedule at k-time slots, which k means the allocated time slots for each schedule. A conventional switch system uses a single time slot per each schedule but the proposed switch system uses multiple time slots per each schedule. Both the conventional switch md the proposed switch have same throughput but our switch system occupies multiple cell time slots per each schedule and hence can be implemented in scheduler of simple circuitry compared to the conventional switch. The proposed scheduling method for switch system will be applicable in switch system with high-speed data link rate.

Rescheduling algorithms considering unit failure on the batch process management (회분공정의 장치 고장을 고려한 동적생산계획 기법)

  • Ko, Dae-Ho;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Study on the Propriety of the Medical Insurance Fee Schedule of Surgical Operations - In Regard to the Relative Price System and the Classification of the Price Unit of Insurance Fee Schedule - (수술수가의 적정성에 관한 연구 - 상대가격체계와 항목분류를 중심으로 -)

  • Oh Jin Joo
    • Journal of Korean Public Health Nursing
    • /
    • v.2 no.2
    • /
    • pp.21-44
    • /
    • 1988
  • In Korea, fee-for service reimbursement has been adopted from the begining of medical insurance system in 1977, and the importance of the relative value unit is currently being investigated. The purpose of this study was to find out the level of propriety of the difference in the fees for different surgical services, and the appropriateness of the classification of the insurance fee schedule. For the purpose of this study, specific subjects and the procedural methodology is shown as follows: 1. The propriety of the Relative Price System(RPS). 1) Choice of sample operations. In this study, sample operations were selected and classified by specialists in general surgery, and the number of items they classified were 32. For the same group of operations the Insurance Fee Schedule(IFS) classified the operations into 24 separate items. In order to investigate the propriety of the RPS, one of the purpose of this study, was to examine the 24 items classified by the IFS. 2) Evaluation of the complexity of surgery. The data used in this study was collected The data used in this study was collected from 94 specialists in general surgery by mail survey from November I to 15, 1986. Several independent variables (age, location, number of bed, university hospital, whether the medical institution adopt residents or not) were also investigated for analysis of the characteristics of surgical complexity. 3) Complexity and time calculations. Time data was collected from the records of the Seoul National University' Hospital, and the cost per operation was calculated through cost finding methods. 4) Analysis of the propriety of the Relative Price System of the Insurance Fee Schedule. The Relative Price System of the sample operation was regressed on the cost, time, comlexity relative ,value system (RVS) separately. The coefficient of determination indicates the degree of variation in the RPS of the Insurance Fee Schedule explained by the cost, time, complexity RVS separately. 2. The appropriateness of the classification of the Insurance Fee Schedule. 1) Choice of sample operations. The items which differed between the classification of the specialist and the classification of medical, Insurance Fee Schedule were chosen. 2) Comparisons of cost, time and complexity between the items were done to evaluate which classification was more appropriate. The findings of the study can be summarized as follows: 1. The coefficient of determination of the regression of the RPS on-cost RVS was 0.58, on time RVS was 0.65, and on complexity RVS was 0.72. This means that the RPS of Insurance Fee Schedule is improper with respect to the cost, time, complexity separately. Thus this indicates that RPS must be re-shaped according to the standard element. In this study, the correlation coefficients of cost, time, complexity Relative Value System were very high, and this suggests that RPS could be reshaped I according to anyone standard element. Considering of measurement, time was thought to be the most I appropriate. 2. The classifications of specialist and of the Insurance Fee Schedule were compared with respect to cost, time, and complexity separately. For complexity, ANOVA was done and the others were compared to the different values of different classifications. The result was that the classification of specialist was more reasonable and that the classification of Insurance Fee Schedule grouped inappropriately several into one price unit.

  • PDF

A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays (계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석)

  • Yun Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.426-429
    • /
    • 2003
  • In the construction process, there are many change orders differing to the initial contracts came from the social needs and environmental changes. Most of them will impact to the construction process so that its effects occur project delays. Time extension and liquidated damage in the construction process come from schedule delay whether it is excusable or not non-excusable by the owner. However, those become the delay claims if the owner and the contractor are not agreed on this situation. One of the most important thing on the delay claims is the calculation of delay. The purpose of this study is to present the method of the time delay calculation by comparison of As-Planned schedule, As-Built schedule including all delay and As-Built schedule absent owner delay.

  • PDF