Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

플랜트 EPC 해외 사업을 위한 입찰단계 시 AI 기반의 ITB Risk 관리 모델 개발 (Development of ITB Risk Mgt. Model Based on AI in Bidding Phase for Oversea EPC Projects)

  • 이돈희;윤건호;김정준
    • 한국인터넷방송통신학회논문지
    • /
    • 제19권4호
    • /
    • pp.151-160
    • /
    • 2019
  • EPC 회사들이 해외에서 계속 사업을 운영하기 위해서는 위험이 더 이상 피할 수있는 것이 아니라 관리 대상이된다는 것이 점점 더 분명 해지고 있다. 입찰 단계에서 입찰 패키지 내의 요구 사항, 사양 및 프로젝트 광고 항목을 자세히 조사하여 비용 초과를 방지하기 위해 다양한 위험 요소를 분석해야한다. 그러나 막대한 양의 입찰 서류를 검토하는 것은 시간이 많이 걸리고 노동 집약적이며 쉬운 작업이 아니며 자동화 된 정보 기술이 도움이 될 수 있다. 이 연구에서는 짧은 시간에 방대한 양의 문서를보다 효과적으로 분석하고 적용 할 수있는 Watson AI 기반의 ITB 분석 모델을 구축하였다. AI 기반 ITB 위험 관리 모델 연구, 학습 절차 및 분석 대상 선택, 성능 평가 기준을 위한 Watson Explorer AI 아키텍처의 구성을 정의하고 시험 연구를 수행하기위한 테스트 베드를 구축하였다. 결과적으로 분석 시간 단축의 효과와 전문가의 결과 및 VOC 운영 품질을 확인하였다.

3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구 (Productivity Analysis for Strutural Formwork Using 3D BIM)

  • 최창훈;박영진;소지윤;김성연;이준복
    • 한국건축시공학회지
    • /
    • 제14권4호
    • /
    • pp.292-300
    • /
    • 2014
  • 건설 프로젝트에 BIM기술이 적용되기 시작하면서, BIM은 전 생애주기 동안 다양한 분야의 정보를 생산하고 활용될 수 있도록 활발한 연구가 진행되고 있다. 따라서 본 연구는 BIM기반의 물량산출 데이터를 활용하여 생산성을 분석할 수 있는 방안을 제시할 목적으로 진행되었다. 본 연구에서는 3D BIM기반 모델을 기반으로 부재의 물량정보를 활용하여 물량을 산출하였으며, 이를 활용하여 현장 생산성을 도출하여 통합 생산성 기준과 비교 분석하였다. 향후 본 논문의 연구 결과를 기반으로 생산성 저하요인을 분석하여 현장생산성을 향상시킬 수 있는 관리방안 도출이 가능할 것으로 사료된다.

비정형구조의 3차원 좌표제어를 위한 CNC Twisted Tube 공법 적용 -대구 대표물문화관(The ARC)를 중심으로- (CNC Twisted Tube Method for 3D Coordinate Control Technology for Freeform Structure -Focused on The ARC in DaeGu-)

  • 류한국;김성진
    • 한국건축시공학회지
    • /
    • 제13권5호
    • /
    • pp.434-440
    • /
    • 2013
  • 최근 건축은 정형의 건축물의 외관과 설계 범위를 벗어난 비정형의 설계, 시각화, 3차원 모델 구현이 이루어지고 있다. 일반 정형건축물과는 달리 비정형건축물의 지붕과 외벽은 디자인 중심의 외벽시스템과 배수, 방수의 성능을 지닌 지붕마감시스템으로 설계되고 시공되었다. 그러나 비정형 건축물은 외벽과 지붕의 구분이 없어지고 외피로의 개념으로 통합된다. 또한 건축설계의 디자인 트렌드가 정형에서 비정형의 자유로운 형태로 급변하고 있어 각종 현상설계 및 턴키 등 설계경기의 당선을 위하여 비정형의 건축물이 자주 등장하고 있다. 기존 비정형 건축구조물의 곡면외피를 시공하기 위해서는 스틸 각파이프나 C형강으로 비정형 형태를 만들고 거기에 외장을 시공한다. 그러나 이는 공사 기간 지연과 높은 공사비용이 소요되는 문제점이 있다. 제작, 설치, 검측 후 비정형 패널의 부착 오류, 줄눈의 불일치, 곡면의 직선 시공 등의 오류가 매우 빈번히 발생하고 있다. 이에 본 연구는 3차원 좌표제어 기술의 하나인 CNC Twisted Tube 공법을 적용한 구조체의 시공과정을 면밀히 검토하여 3차원 좌표제어 기술로 비정형 건축물의 구현 방안을 제시한다.

Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective

  • Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권2호
    • /
    • pp.1-24
    • /
    • 2019
  • Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.

Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea

  • 김영목;김수용;르드롱반
    • 한국건설관리학회논문집
    • /
    • 제9권5호
    • /
    • pp.214-226
    • /
    • 2008
  • Construction delay caused considerable losses to project parties. Avoiding construction delays is important to save costs for project stakeholders. The main objective of this paper is to identify major causes of construction delays of apartment construction projects in Vietnam. Sixteen causes of delay were identified through a questionnaire survey of 166 professionals. Factor analysis was employed to categorize these causes. The results of the survey revealed the main causes of delay of apartment projects in Vietnam are: (1) owner's and contractor'S financial difficulties; (2) lack of experienced contractors; (3) late delivery of materials; (4) late construction site handover; (5) owner's late payments for completed works; (6) low bid prices; (7) inappropriate construction method; and (8) defective works and unnecessary reworks. Factor analysis uncovered that causes of delay can be grouped under five categories labeled the five INs: incompetence, ineffectiveness, inadequateness, inapplicableness and inconceivableness. Comparative analysis between the Vietnam construction industry (VCI) and the Korea construction industry (KCI) has been performed to infer valuable lessons for researchers and practitioners in the VCI and the KCI. Comparative analysis indicated that main causes of delay in the VCI somewhat differ from main causes of delay in the KCI. However, "contractor'S financial difficulties", "late construction site handover", "unnecessary rework", "incapable designers", "site clearance difficulties" are common causes of delay in the VCI as well as the KCI. The findings of this research can be used as a guideline to overcome problems in the VCI as well as in other construction industries. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in Korea.

도로건설사업 시공단계 성과평가 프레임워크 연구 (Analysis on Performance Assessment Framework of Construction Phase for Road Construction Projects)

  • 문준부;이강욱;윤성민
    • 대한토목학회논문집
    • /
    • 제43권6호
    • /
    • pp.801-809
    • /
    • 2023
  • 대규모로 진행되는 도로건설사업에서 비용 초과와 공기 지연이 지속적으로 발생하고 있지만 이를 사전에 관리하고 대비할 수 있는 성과평가 체계 연구는 미흡한 실정이다. 또한 긴 공기를 가진 도로건설사업은 시공과정에서 많은 요인들에 영향을 받기 때문에 도로만의 특성을 고려한 성과 평가를 실시하고, 추후 유사한 사업에 대비할 필요가 있다. 따라서 본 연구는 도로건설사업의 시공단계 성과평가 프레임워크를 개발하여 도로건설사업의 성과관리 방안을 제시하고자 한다. 본 연구는 각종 유관기관에서 도로건설사업 시공단계의 정보를 수집하고 속성정보에 따라 데이터베이스를 구축하였다. 또한 사업의 착공·준공시점 간 시간차에 대해 비용 표준화를 실시하였고, 성과평가를 위한 지표를 도출하여 분석을 실시하였다. 본 연구는 도로건설사업 시공과정의 절대적, 상대적 비용·일정 성과를 정량적으로 분석함으로써 성과평가 연구의 고도화 가능성과 신규 도로건설사업 계획 시 활용방안을 보여준다.

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

SysML 기반 모델링 및 시뮬레이션 기법을 활용한 무기체계 정비도 지수 산출 (Computation of Maintainability Index Using SysML-Based M&S Technique for Improved Weapon Systems Development)

  • 유연용;이재천
    • 한국산학기술학회논문지
    • /
    • 제19권11호
    • /
    • pp.88-95
    • /
    • 2018
  • 정비도는 시스템에 고장이 발생하였을 때 얼마나 쉽게 정상 상태로 복구할 수 있는가를 나타내는 것으로서, 좋은 정비도를 갖도록 개발된 시스템은 정비시간, 정비인력 및 소요자원 등의 절감을 통해 무기체계의 운용유지비용 관점에서 경쟁력을 갖게 된다. 시스템설계 후반기에서의 정비도 반영을 위한 설계변경은 비용 초과와 일정 지연을 초래할 수 있어서 설계 초기단계부터 정비도를 고려할 필요가 있다. 정비도는 평균수리시간, 평균실정비시간 등으로 정량화할 수 있으나, 이는 시제품 제작 이후 또는 이력데이터가 있는 경우에만 추정가능하고 시스템 구성품의 물리적 특성을 나타내지 못하는 제약이 있다. 이점을 해결하기 위해 기존 논문에서는 그래프 이론을 활용하였으나, 일련의 과정이 개별적으로 독립된 환경에서 수행되어 전체과정에 대한 관리의 효율성이 부족하다. 또한 3D 모델 데이터를 활용하여 설계단계에서 정비도 평가방법을 제시하였으나, 새로운 시스템 설계시 또는 설계초기에 적용할 때 제약이 있다. 이 문제를 해결하기 위해 본 논문에서는 SysML 기반 모델링 및 시뮬레이션 기법을 활용하여 무기체계의 정비도 지수를 산출하는 방법을 연구하였다. 특히, 시스템 설계 및 정비도 추정을 동시에 고려하기 위해서, 시스템공학 도구 상의 정비속성 및 속성간 관계 값을 SysML 구조 다이어그램에 반영하여 구성품의 정비도를 모델링하였다. 그리고 나서 SysML Parametric 다이어그램을 생성하고 MATLAB과 연계한 시뮬레이션을 통해 정량적인 정비도 지수를 산출하였다. 본 연구결과를 활용하면, 설계초기부터 시스템 모델과 정비도 모델의 통합으로 효율적 관리가 가능하고, 정비도 지수가 낮은 구성품을 조기에 식별하여 설계 후반기에서의 설계변경에 따른 비용 및 일정에 대한 위험을 감소시킬 수 있다.