• Title/Summary/Keyword: timber frame

Search Result 47, Processing Time 0.026 seconds

A study on the wooden joinery technique of building members excavated at Donggung Palace and Wolji Pond (동궁과 월지 출토 건축 목부재의 현황과 결구 제작기술의 수준)

  • Seo, Hyowon;Son, Eunmi;Lee, Sunah
    • Journal of architectural history
    • /
    • v.29 no.6
    • /
    • pp.67-77
    • /
    • 2020
  • The purpose of this study is to reveal the wood joinery technique in the ancient era. Joinery is one of the core techniques in constructing timber frame architecture in the Korean peninsula. These techniques can be revealed by examining wooden members of ancient buildings. The members were excavated at the Donggung Palace and Wolji Pond, the historic site in Gyeongju. This study collects the data of 284 members excavated at the Donggung Palace and Wolji Pond and analyzes the details such as length, thickness, width, joint types, joint shapes. With the result of the analysis, this study tries to indicate the level of wood joinery techniques in ancient buildings.

A Study on the Fire Resistance Performance of Wood Framed Lightweight Wall which Including a Middle Lintel (중인방을 포함한 목골조 경량벽체의 내화성능에 관한 연구)

  • Yeo, In-Hwan;Cho, Bum-Yean;Min, Byung-Yeol;Yoon, Myung-O
    • Fire Science and Engineering
    • /
    • v.25 no.3
    • /
    • pp.91-98
    • /
    • 2011
  • This study is about fire resistance performance of wood framed lightweight wall including a middle lintel as a traditional wall form in Korea. The target wall is non-loadbearing system which constructed with $38{\times}89$ mm ($2"{\times}4"$) wood frame and fireproof gypsum board covering, including a middle lintel made of $150{\times}150$ mm section glue-laminated timber. As a test results, all specimens have showed fire resistant performance over 90 minutes and tests were maintained until flame occuring on Specimen-l, 2, 3 at 91 min, 97 min and 98 min respectively. Fire resistance of the heat side gypsum board was 45 minutes and charring rate of middle lintel was equivalant with that of usual timber. The wood stud inside wall system showed relatively quick combution characteristic when exposed to high temperature with no temperature rising delaying time caused by moisture evaporation because of the dehydration preceded during the early period of fire side gypsum board resist to heat.

Possibility of Substituting Softwoods for Tropical Hardwoods of Door Frames (침엽수재(針葉樹材)의 남양활엽수(南洋闊葉樹) 문틀재(材) 대체(代替) 가능성(可能性) 조사(調査))

  • Kang, Ho-Yang;Jang, Sang-Sik;Lee, Hwa-Hyoung
    • Korean Journal of Agricultural Science
    • /
    • v.21 no.2
    • /
    • pp.103-110
    • /
    • 1994
  • Since the supply of the Southeast Asian tropical timber decreases and its price steeply increases in the international lumber market, door and window frame manufacturers in this country are eagerly searching for their substitutes. This is the first step to replace Southeast Asian tropical timber by low grade North American softwoods, whose reliable and steady supply is expected, but their appearances are not as good as the tropical timber. In this study, knot distribution on the softwood boards and their warp were examined The yield and production cost were also calculated. The average numbers of knots on a door frame were 7.2 for Douglas-fir and 3.4 for Western hemlock. Only 11% of the knots of Douglas-fir door frames are larger than 5cm in diameter, while are 35% of the knots of Western hemlock. The deformations of door frames, after 2 months air-drying, were measured with a warp table. The deformations of Western hemlock door frames were mostly less than 6mm, while those of Douglas-fir distributed in the range of 0.5 and 9.5mm. The yield of Western hemlock is higher than that of Douglas-fir. It can be concluded that the door frames made of the softwoods are compatible with those made of the tropical timber in most aspects except appearance.

  • PDF

Lateral Load Performance Evaluation of Larch Glulam Portal Frames Using GFRP-Reinforced Laminated Plate and GFRP Rod (GFRP 보강적층판 및 GFRP rod를 이용한 낙엽송 집성재 문형라멘 구조의 수평가력 성능평가)

  • Jung, Hong-Ju;Song, Yo-Jin;Lee, In-Hwan;Hong, Soon-Il
    • Journal of the Korean Wood Science and Technology
    • /
    • v.44 no.1
    • /
    • pp.30-39
    • /
    • 2016
  • The evaluation of the lateral load performance for larch glulam portal frames was carried out using glass fiber reinforced plastic (GFRP) as connector in two different systems: the GFRP-reinforced laminated plates combined with veneer, and GFRP rod joints glued with epoxy resins to replace usual metal connectors for the structural glulam rahmen joints. As a result the yield strength, ultimate strength, initial stiffness of glulams of GFRP rod joints glued with epoxy resin decreased to 49%, 52% and 61% compared to those of the conventional metal connector. This connector will be a stress device where the bonding strength between the GFRP rod and glued laminated timber is important. Thus, there will be a high possibility that a problem may occur when it is applied to the field. On the other hand, the GFRP-reinforced laminated plates and wood (Eucalyptus marginata) pin were measured all within 3% for all measurements of the yield strength, ultimate strength, initial strength and ductility factor, regardless of high cross sectional loss on the glued laminated timber slit joint. In addition, the variation of stiffness on the cycle was 35%, which was the lowest, confirming that it was almost the same performance as the specimen prepared with the metal connector.

A Study on the Joint and Splice of wooden Structure at Geunjeongjeon Hall of Gyeongbok Palace in the late Joseon Dynasty (조선후기 경복궁 근정전 주요 구조재의 맞춤과 이음에 관한 연구)

  • Jung, Yun-Sang
    • Journal of architectural history
    • /
    • v.16 no.1
    • /
    • pp.83-99
    • /
    • 2007
  • This study examines the joint and splice of wooden structure at Geunjeongjeon Hall of Gyengbok Palace, which was constructed in the late Joseon Dynasty. The scope of the study is on the part of columns, the bracket sets, and the frame structure. This research also deals with the relationship between vortical load and horizontal load. Firstly, the examination of the joint and splice methods between the pillar and penetrating ties is on the joint and splice methods of the outer and corner. Through the investigation, it is verified that the joint methods between pillar and penetrating tie on the outer and corner pillars is the method of Sagal joints(cross joints, 사개맞춤). Joints used between pillar and penetrating tie are dovetailed tenon joints, between columns and Anchogong(안초공), between columns and Choikgong(초익공) are tenon joint(장부맞춤). Secondly, the examination of the joint and splice methods of the bracket set is on that of Salmi and Cheomcha(첨차), and Salmi and Janghyeo(장혀). Joints used between Salmi and Cheomcha, Salmi and Janghyeo are halved joint, and between each Janghyeo are stepped dovetailed splice. It is Cheomcha that is used the Jujang-Cheomcha(주장첨차) on center line. Therefore it is connected with each bracket set, which gets to is the strong system, easy and convenient on the construction of that. Thirdly, the frame structure of wooden architecture in royal palace is consist of purlins and beams, Janghyeo(장혀, timber under purlin), tall columns, king posts, etc. Through the investigation, it is verified that the joint and splice methods between purlins and beams are used with the methods of Sungeoteok joint(숭어턱맞춤). It is verified that the joint and splice methods between beams and high columns are used with methods of mortise and tenon joint(장부맞춤), is highly related with tensile force. To reduce the separation of parts, sangi(산지) and tishoi(띠쇠) are used as a counterproposal, which were generally used for architecture in royal Palaces in the late Joseon Dynasty and continued to be used until these days common wooden architecture.

  • PDF

Structural Design of Box Beam Header

  • Jang, Sang-Sik;Park, Young-Ran;Kim, Yun-Hui
    • Journal of the Korea Furniture Society
    • /
    • v.18 no.4
    • /
    • pp.287-295
    • /
    • 2007
  • To obtain a design data for box beams used as headers in light-frame timber construction, $2{\times}6\;(38{\times}140mm),\;2{\times}8\;(38{\times}184mm),\;2{\times}10\;(38{\times}235mm)\;and\;2{\times}12\;(38{\times}286mm)$ members were built as box beam specimens for bending tests. The allowable bending stresses for box beams were obtained through bending tests of these specimens, and span tables were calculated for various loading conditions based on the allowable bending stresses obtained. The allowable bending stresses were determined as the bending stresses at 10mm deflection of specimens from the results of bending tests of box beam specimens. Span tables for box beams were obtained assuming five loading conditions for headers used in exterior walls and two loading conditions for headers used in interior walls. Among these 7 loading conditions, 5 loading conditions applied to headers in exterior walls included the dead loads, the live loads and the snow loads and 2 loading conditions applied to headers in interior walls included the dead loads and the live loads.

  • PDF

Analysis of Airtightness and Air Leakage of Wooden Houses in Korea

  • Kim, Sejong;Chang, Yoon-Seong;Park, Joo-Saeng;Shim, Kug-Bo
    • Journal of the Korean Wood Science and Technology
    • /
    • v.45 no.6
    • /
    • pp.828-835
    • /
    • 2017
  • Airtightness of buildings is one of critical aspects of its energy performance. To build up references of airtightness of wooden houses built in Korea, blower door tests have been carried out in 42 houses since 2006. Causes of air leakage were investigated recently. The average value of air change rate was $3.7h^{-1}$ for light frame house and $5.5h^{-1}$ for post-beam construction at ACH50 (air change per hour at 50 Pa air pressure difference). Foam type insulation was more advantageous in ensuring building airtightness than glass fiber batt. Airtightness of wooden houses which were constructed after 2010 was improved to have less than $1.5h^{-1}$ of ACH50, threshold for application of artificial air change. The average air change rate of CLT (cross laminated timber) houses showed the lowest value, $1.1h^{-1}$, among the tested structures.

'Modularised' Closed-Form Mathematical model for predicting the bracing performance of plasterboard clad walls

  • Liew, Y.L.;Gad, E.F.;Duffield, C.F.
    • Structural Engineering and Mechanics
    • /
    • v.20 no.1
    • /
    • pp.45-67
    • /
    • 2005
  • This paper presents a new approach to predict the racking load-displacement response of plasterboard clad walls found in Australian light-framed residential structures under monotonic racking load. The method is based on a closed-form mathematical model, described herein as the 'Modularised' Closed-Form Mathematical model or MCFM model. The model considers the non-linear behaviour of the connections between the plasterboard cladding and frame. Furthermore, the model is flexible as it enables incorporation of different nailing patterns for the cladding. Another feature of this model is that the shape of stud deformation is not assumed to be a specific function, but it is computed based on the strain energy approach to take account of the actual load deformation characteristics of particular walls. Verification of the model against the results obtained from a detailed Finite Element (FE) model is also reported. Very good agreement between the closed form solution and that of the FE model was achieved.

Planning Method of Roof Framing through Inner Building of Changgyeonggung in 19th Century (19세기 창경궁(昌慶宮) 내전(內殿) 전각(殿閣)의 지붕가구(架構) 계획기법(計劃技法)에 관한 연구(硏究))

  • Kim, Ki Deoka;Han, Wook;Kim, Derk Moon
    • Korean Journal of Heritage: History & Science
    • /
    • v.42 no.2
    • /
    • pp.134-153
    • /
    • 2009
  • This study is to examine closely the frame structure of buildings in the royal palace of Josen dynasty, focused on inner buildings of Changgyeonggung(昌慶宮) which is built in 19th century, through considering the member size of main structure and analyzing the slope of a rafter. The plans of a size on main member are as follows ; firstly, a length of the perimeter column was accorded with Gunggwolji(宮闕誌) and the planning size of interior column was shown to a Chon(a Korean inch, 寸) unit. The slope of long common rafter that is formed between the perimeter and interior columns was grasped with limits of a definite value. This is that the perimeter column is trimmed to a Chon unit, as Yeongchunheon(迎春軒), In the roof frame of Korean traditional timber architecture, the slope of rafter, first of all, is to decide the slope of long common rafter and then to decide a height of ridge piece settled whole height of a building. And it is regulated with position and height of a post so as to set up middle rafter. Especially, the slope of long common rafter, it is not to be decide through scale of a building but through a length of the perimeter column and composition of bracket structure. And in case middle rafter, the process of its slope is to devide the central bay on the side of a building into equality, and then to adjust position and length of a post.

Moment Resistance Performance Evaluation of Larch Glulam Joints using GFRP-reinforced Laminated Plate and GFRP Rod (GFRP 보강적층판 및 GFRP rod를 이용한 낙엽송 집성재 접합부의 모멘트저항 성능평가)

  • Jung, Hong-Ju;Song, Yo-Jin;Lee, In-Hwan;Hong, Soon-Il
    • Journal of the Korean Wood Science and Technology
    • /
    • v.44 no.1
    • /
    • pp.40-47
    • /
    • 2016
  • Instead of metal connector generally used on the structural glued laminated timber rahmen joints, the GFRP reinforced laminated plates combining veneer and GFRP (Glass Fiber Reinforced Plastic) and bonded type GFRP rod were used as the connectors. As a result of moment resistance performance evaluation on the joint part applied with these connectors, the yield moment of specimen using the GFRP reinforced laminated plates and GFRP rod pin was measured 4 % lower in comparison to the specimen (Type-1) using the metal connectors, but the initial rotational stiffness was measured 29% higher. Also, the yield moment and rotational stiffness of the specimen using the GFRP-reinforced laminated plates and wood (Eucalyptus marginata) pin showed were measured 11% and 56% higher in comparison to the Type-1 specimen, showing the best performance. It was also confirmed through the failure shape and perfect elasto-plasticity analysis that it showed ductility behavior, not brittle fracture, from the shear resisting force by the pin and the bonding strength increased and the unification of member was carried out. On the other hand, in case of the specimen bonded with GFRP rod, it was impossible to measure the bonding performance or it was measured very low due to poor bonding.