• 제목/요약/키워드: the w-operation

검색결과 2,473건 처리시간 0.036초

τw-LOEWY MODULES AND THEIR APPLICATIONS

  • Kim, Hwankoo;Lim, Jung Wook;Zhou, Dechuan
    • 대한수학회보
    • /
    • 제56권6호
    • /
    • pp.1617-1642
    • /
    • 2019
  • In this paper, we study a theory for the structure of ${\tau}_w$-Loewy series of modules over commutative rings, where ${\tau}_w$ is the hereditary torsion theory induced by the so-called w-operation, and explore the relationship between ${\tau}_w$-Loewy modules and w-Artinian modules.

Two Extensions of a Star Operation on D to the Polynomial Ring D[X]

  • Chang, Gyu Whan;Kim, Hwankoo
    • Kyungpook Mathematical Journal
    • /
    • 제61권1호
    • /
    • pp.23-32
    • /
    • 2021
  • Let D be an integral domain with quotient field K, X an indeterminate over D, ∗ a star operation on D, and Cl∗ (D) be the ∗-class group of D. The ∗w-operation on D is a star operation defined by I∗w = {x ∈ K | xJ ⊆ I for a nonzero finitely generated ideal J of D with J∗ = D}. In this paper, we study two star operations {∗} and [∗] on D[X] defined by A{∗} = ∩P∈∗w-Max(D) ADP [X] and A[∗] = (∩P∈∗w-Max(D) AD[X]P[X]) ∩ AK[X]. Among other things, we show that Cl∗(D) ≅ Cl[∗](D[X]) if and only if D is integrally closed.

ANALYSIS ON THE AVAILABILITY OF COMS GS

  • Park, Durk-Jong;Lim, Hyun-Su;Ahn, Sang-Il
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2006년도 Proceedings of ISRS 2006 PORSEC Volume I
    • /
    • pp.212-215
    • /
    • 2006
  • This paper describes several reliability models to estimate COMS ground segment availability and shows assessed availability according to GS function. Due to a back-up concept among three ground center, SOC will have all H/W and S/W module to be installed in MSC and KOSC site. Therefore, all configurations and availability parameters for H/W and S/W modules in MSC and KOSC are assumed as equal with those in SOC, if related modules have same function. Prior to access availability over COMS GS function, Availability related to fundamental configuration such as series, parallel, partial operation, and module combined H/W and S/W is described. Consequently, all functions are expected to operate with more than 99% of availability.

  • PDF

1kW급 고체산화물 연료전지 발전시스템 자열운전 (Self-sustainable Operation of a 1kW class SOFC System)

  • 이태희;최진혁;박태성;유영성
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.57-60
    • /
    • 2008
  • KEPRI has studied planar type SOFC stacks using anode-supported single cells and kW class co-generation systems for residential power generation. A 1kW class SOFC system consisted of a hot box part, a cold BOP part and a water reservoir. A hot box part contains a SOFC stack made up of 48 single cells and ferritic stainless steel interconnectors, a fuel reformer, a catalytic combustor and heat exchangers. Thermal management and insulation system were especially designed for self-sustainable operation. A cold BOP part was composed of blowers, pumps, a water trap and system control units. When a 1kW class SOFC system was operated at $750^{\circ}C$ with hydrogen after pre-treatment process, the stack power was 1.2kW at 30 A and 1.6kW at 50A. Turning off an electric furnace, the SOFC system was operated using hydrogen and city gas without any external heat source. Under self-sustainable operation conditions, the stack power was about 1.3kW with hydrogen and 1.2kW with city gas respectively. The system also recuperated heat of about 1.1kW by making hot water.

  • PDF

25 kW급 전력사업용 MCFC 발전시스템 구성 및 운전평가 (Constitution and Operation of the 25 kW Molten Carbonate Fuel Cell Power Generation System for Power Utility)

  • 임희천;안교상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.687-689
    • /
    • 2000
  • Molten Carbonate Fuel Cell (MCFC) with high electrical efficiency and low environmental effect has been developed for the commercial application of power generation fields. Recently we have built a 25 kW molten carbonate fuel cell power generation system and tested it. The MCFC system is composed of diverse peripheral units such as reformer, pre-heater, water purifier. electrical loader, gas supplier, and recycling systems. The stack itself was made of 40 cells of $6.000 cm^2$ area each. The stack showed an output of 28.6 kW power and a reliable performance at atmospheric operation. while in pressurized operation the stack showed an output 25.6 kW lower than the atmospheric operation. The reason of lower performance of pressurized operation was caused from a gas cross over shown in few cells in the stack.

  • PDF

*-NOETHERIAN DOMAINS AND THE RING D[X]N*, II

  • Chang, Gyu-Whan
    • 대한수학회지
    • /
    • 제48권1호
    • /
    • pp.49-61
    • /
    • 2011
  • Let D be an integral domain with quotient field K, X be a nonempty set of indeterminates over D, * be a star operation on D, $N_*$={f $\in$ D[X]|c(f)$^*$= D}, $*_w$ be the star operation on D defined by $I^{*_w}$ = ID[X]${_N}_*$ $\cap$ K, and [*] be the star operation on D[X] canonically associated to * as in Theorem 2.1. Let $A^g$ (resp., $A^{[*]g}$, $A^{[*]g}$) be the global (resp.,*-global, [*]-global) transform of a ring A. We show that D is a $*_w$-Noetherian domain if and only if D[X] is a [*]-Noetherian domain. We prove that $D^{*g}$[X]${_N}_*$ = (D[X]${_N}_*$)$^g$ = (D[X])$^{[*]g}$; hence if D is a $*_w$-Noetherian domain, then each ring between D[X]${_N}_*$ and $D^{*g}$[X]${_N}_*$ is a Noetherian domain. Let $\tilde{D}$ = $\cap${$D_P$|P $\in$ $*_w$-Max(D) and htP $\geq$2}. We show that $D\;\subseteq\;\tilde{D}\;\subseteq\;D^{*g}$ and study some properties of $\tilde{D}$ and $D^{*g}$.

A GORENSTEIN HOMOLOGICAL CHARACTERIZATION OF KRULL DOMAINS

  • Shiqi Xing;Xiaolei Zhang
    • 대한수학회보
    • /
    • 제61권3호
    • /
    • pp.735-744
    • /
    • 2024
  • In this note, we shed new light on Krull domains from the point view of Gorenstein homological algebra. By using the so-called w-operation, we show that an integral domain R is Krull if and only if for any nonzero proper w-ideal I, the Gorenstein global dimension of the w-factor ring (R/I)w is zero. Further, we obtain that an integral domain R is Dedekind if and only if for any nonzero proper ideal I, the Gorenstein global dimension of the factor ring R/I is zero.

농업용 트랙터의 주요 농작업 소요동력 분석 (Analysis of Power Requirement of Agricultural Tractor by Major Field Operation)

  • 김용주;정선옥;박승제;최창현
    • Journal of Biosystems Engineering
    • /
    • 제36권2호
    • /
    • pp.79-88
    • /
    • 2011
  • The purpose of this study was to analyze power requirement of an agricultural tractor by major field operations. First a survey was conducted to obtain annual usage ratio of agricultural tractor by field operation. Plowing, rotary tillage, and loader operations were selected as major field operations of agricultural tractor. Second, a power measurement system was constructed with strain-gauge sensors to measure torque of four driving axles and a PTO axle, speed sensors to measure rotational speed of the driving axles and an engine shaft, pressure sensors to measure pressure of hydraulic pumps, an I/O interface to acquire the sensor signals, and an embedded system to calculate power requirement. Third, the major field operations were experimented under fields with different soil conditions following planned operation paths. Power requirement was analyzed during the total operation period consisted of actual operation period (plowing, rotary tillage, and loader operations) and period before and after the actual operation (3-point hitch operating, forward and reverse driving, braking, and steering). Power requirement of tractor major components such as driving axle part, PTO part, main hydraulic part, and auxiliary hydraulic part were measured and calculated to determine usage ratio of agricultural tractor power. Results of averaged power requirement for actual field operation and total operation were 23.1 and 17.5 kW, 24.6 and 19.1 kW, and 14.9 and 8.9 kW, respectively, for plowing, rotary tillage, and loader operations. The results showed that rotary tillage required the greatest power among the operations. Averaged power requirement of driving axles, PTO axle, main hydraulic part, and auxiliary part during the actual field operation were 8.1, 7.8, 3.4, and 1.5 kW, respectively, and the total requirement power was about 70 % (20.8 kW) of the rated power. Averaged power requirement of driving axles, PTO axle, main hydraulic, and auxiliary hydraulic for the total operation period were 6.5, 6.0, 2.1, 0.9 kW, respectively, and total requirement power was about 52 % (15.5 kW) of the rated power. Driving axles required the greatest amount of power among the components.

전기자동차용 80[kW] IPMSM 구동 시스템 개발 (Development of an 80[kW] IPMSM Drive System for an Electric Vehicle)

  • 김상훈;박내춘
    • 산업기술연구
    • /
    • 제33권A호
    • /
    • pp.61-66
    • /
    • 2013
  • This paper is about the development of 80[kW] IPMSM(Interior Permanent Magnet Synchronous Motor) drive system for an electric vehicle. MTPA(Maximum Torque per Ampere) operation and flux-weakening operation for the optimal torque control of the IPMSM are presented. In this system, the torque control of the IPMSM is achieved by using the look-up table, which gives d- and q-aixs current references for the given torque command in the MTPA operation and flux-weakening operation regions. This look-up table is made by current injection tests, and from which the motor parameters are also estimated. The proposed system is verified by the experiment on the electric vehicle drive system, which consists of an 80[kW] IPMSM and an IGBT inverter.

  • PDF

배전운영 시스템에서 상시개방 연계 스위치 투입에 의한 루프 운전 중 구간전압 계산 방법 (Section Voltage Calculation while a Loop Operation by Tie-Switch Close in a Distribution Management System)

  • 서정수;임일형;박종호;신용학;최면송
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.397-403
    • /
    • 2016
  • Generally, an electrical distribution configuration is a radial system with one-way current in a distribution management system (DMS). All feeders in a DMS have tie-switches to make radial system. Sometimes, DMS should change a tie-switch for operation. In that case, the tie-switch has to be closed first; then a switch is opened as another tie-switch in order to prevent blackout for customers. At the moment when the tie-switch is closed, distribution system is operated in a loop state, not radial. Before the loop operation, DMS operator has to check any expected events for stable distribution system operation; and the most important event is a mis-operation of a protection relay. In addition, DMS operator should check voltage profile violation but a calculation method of section voltages had not been used. Thus, this paper proposes a calculation method of section voltages at a loop operation in a DMS. The proposed calculation algorithm is verified by Matlap Simulink.