This study focuses on making recommendations for the improvement of poor emergency medical services or EMS in Korea. Problems of the current EMS system is widely reviewed. As an alternative of the current system, a franchises system is introduced to EMS. A feasibility study of the new system is carried out as follows. 1) The current EMS system shows such problem as; - Inadequacy of emergency medical fee schedule, - Shortage of emergency medical resources, - Concentration of emergency medical facilities in metropolitan area, - Unestablishment of training program for emergency personnel, - Inappropriateness of patients' behvaviro pattern in emergency care system. 2) Recommendations for the improvement of EMS are as follows: - Well organized communication and transportation system needs to be established by utilizing all the availabl EMS is to be devised for the provision of appropriate emergency care. - A franchises system can be widly adopted so that private organizations are willing to establish a free standing emergency center. - Emergency care fee schedule of the franchises system needs to be appropriate for the system to provide high standard medical services.
For the productivity improvement, it is necessary to analyze problem of the system and evaluate alternative plans. But, it if hard to experiment and evaluate alternative plans in real existing system. Therefore, it is necessary to synthetically analyze and evaluate alternative plans using simulation and statistical analysis method. In this case study, as a simulation language, Promodel is used to compare and evaluate four alternatives which are considered to improve the productivity of an object system. The object system is constituted of a pretreatment line and a painting line. The purpose of this study is to analyze whether the decrease of the down time in pretreatment line can be effective to the productivity improve comparing with exiting system and other alternatives. The other purpose is to choose an alternative that has the best productivity improvement. The results of the simulation show that the possibility of improvement in productivity by decreasing the down time of pretreatment line. Two-Stage Bonferroni Procedure is used to choose the best alternative.
The purpose of this study was to derive practical improvement measures for the food traceability system that could improve food reliability and secure food safety. To this, in our survey May-June, 2019, 567 adult males and females were analyzed for recognition and experience of the food traceability system, measures to improve the system, and intention to make additional payments to improve the system. In the case of a food safety accident, 2.54 of 5 points were given on if the food was recalled or not. Approximately 77.4 percent of the respondents had never seen indication of a food traceability system, and approximately 93.8 percent had no access to, or experience with, using the system. Most respondents said that the food traceability system should be applied to items that need to be applied. As the volume of data that is recorded and managed by the government is recognized as high, improvement is needed. Finally, it was analyzed that the company intends to pay an additional 1.34% on average to expand its food traceability system. A more sophisticated cost analysis is needed to apply the improvements proposed to complement the plans that are acceptable to consumers and the industry.
International conference on construction engineering and project management
/
2007.03a
/
pp.279-288
/
2007
Attempts to achieve a higher productivity have led studies to focus on process improvement. Information has been found as an essential element for process improvement. This research has introduced and focused on two types of information, namely: related jobsite information along the process and feedback information. Related jobsite information along the process which needs to be processed and delivered in a timely manner, accurate, and real time is required to streamline the decision making process. Whereas feedback information about process' current practices which have to be captured and stored is a useful for continuous improvement in identifying the problem origin and determining corrective action. In the current practices, although these two types of information are essential for process improvement, construction process has faced barriers in obtaining that information. Therefore, this research will propose a new information system to overcome the aforementioned barriers. The new information system consists of RFID as an automatic identification and data collection device integrated with database to support construction processes. The new system attempts to provide related jobsite information along the process and feedback information to support decision making process and continuous process improvement respectively. A case study of prefabrication installation process in housing projects has been selected to be implemented in conceptual model of RFID application in construction industry. Conceptual model will be presented in this paper as an initial stage of this ongoing research. Expected outcomes of the new system and future works will be discussed briefly.
Kim, Hyung Mi;Yang, Il Sun;Park, Eun Cheol;Lim, Hyun Sook
Quality Improvement in Health Care
/
v.7
no.2
/
pp.244-261
/
2000
Background : In order to cope with changes in the management environment at hospitals, increased interests are drawn in patient foodservice system on Continuous Quality Improvement Activity as the method of approaching a quality food service and effective management. Thus, as a part of this activity, this study was conducted to evaluate job flow improvement that was already performed and the results of that process at the dietetic department of a university hospital, focusing on improving management. Method : On February 15 of 1998. the dietetic department formed a job flow-improvement to decide on the priority of job flow improvement, and prepared specific action strategies and schedule of the priority: after a 5 month process period, job improvement achieved on June 15. 1998. Also, economic achievement of the task was evaluated through labor productivity analysis and cost-benefit analysis. Results : The patient food service system which was managed decentralized at the present hospital was centralized, some steps of the food service process were integrated, and quality of patient food was improved. Also, as a solution of the problems expected when conducting job flow improvement was made on food service equipments and utensils. The result of evaluating the job flow improvement that labor productivity improved by 18.2% compared to before the improvement and the result of the analysis of cost-benefit showed that Benefit-Cost (B/C) ratio was 2.22. showing financial merit on the investment. Conclusions : Continuous Quality Improvement Activity needs to be initiated and conducted in the future in various areas of hospital foodservice system in order to actively adopt to ever changing hospital management environment. In order to achieve this goal, many researches and more efforts need to be put in by people in charge of hospital food service management, and interests and support are needed from hospital policy makers.
Journal of Korean Society of Industrial and Systems Engineering
/
v.24
no.69
/
pp.107-119
/
2001
In this paper, we propose a model of improvement of quality system level using system FMEA. The system FMEA is developed to a system analysis technique using the concepts of conventional FMEA. This is know what is important factor to manage the ISO 9000 Quality System. Therefore, it is used the system FMEA as the main method of the proposed model. The important factors of this model are internal quality audits, corrective and preventive action, customer claim review management review. This model is considered to be guideline for improvement of quality system level. We show the efficiency of the proposed model by means of a case study.
The Bidding System of the public IT project in Korea is fallen behind, because of the ordering habitual practice based old system, overcompetition based sealed bid and subcontract practice. To innovate this old-fashioned practice for public IT project bidding, this paper wants to generate a proper improvement direction of the public IT project contract law and the related policy through the literature review about the ordering and receiving system in Korea, the practical survey about bidding marketplace in Korea, and competition between bidding system and/or policy of major countries: USA, UK, France and Japan. As a result of practical survey, many problems of the current public IT project bidding system came out and improvement ideas toward future situation turned up. These outputs implicate that the current law and system related public IT project demands better improvement work for the future ubiquitous Korea. Therefore, this paper, to solve these problems about bidding systems and practice, propose the new public IT project contract law and the related policy, reflecting these improvement ideas by the practical survey and the literature review, and benchmarking points from bidding system of other countries.
Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.
This study analyzes the importance-performance analysis (IPA) of the 10 dimensions of the smart construction safety management system, and analyzes which dimensions are important and which dimensions are performing to determine key improvement tasks, incremental improvement tasks, Maintenance and reinforcement tasks and continuous maintenance tasks were derived. Among the 10 dimensions of the smart construction safety management system, the dimensions that are recognized as important by all field managers and field workers and have high performance are the automatic risk displacement measurement system, smart environmental sensor system, and heavy equipment seizure prevention system. However, areas that were perceived as having high importance but low performance were worker location tracking systems, smart safety helmet chin muscles, and smart safety ring fastening. Among the smart construction safety management systems perceived by field managers, areas for key improvement with high importance and low performance included worker location tracking system and smart safety ring fastening. Among the smart construction safety management systems perceived by field workers, the area for key improvement with high importance and low performance was the automatic risk displacement measurement system.
This writing is for the purpose of investigating the specific character and problem point of China arbitration system which has near 90 years history and overviewing the drift of system improvement which happens recently. The arbitration system of China which traditionally does not acknowledge ad hoc arbitration, unlike most of the other nations that employ The UNCITRAL model law and make it their own legislation, is restrictive to the parties concerned principle of private autonomy considerably. Also the independence of arbitration is delicate, because of a civil characteristic weakness of the arbitral institutions and the intervention of the courts on the arbitration procedure and award. The dual system of domestic and international arbitration which maintains after enforcement of 1994 arbitration law is often to be a primary factor interrupting the development of Chinese arbitration system and making it vulnerable to challenges. The system improvement demand of the recent time reflects this point and makes the arbitration system of China to a international standard rather than now, so it is a desirable direction for China to be as the member of the world economy to be globalization.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.