• 제목/요약/키워드: technical proposal bidding

검색결과 11건 처리시간 0.03초

파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안 (BIM-Based VE Proposal Management Using Parametric Modeling)

  • 김다인;최재현;이진강
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

A study on evaluation element of technical proposal tendering for apartment remodeling business

  • Park, Min-Young;Lim, Sooyoung
    • KIEAE Journal
    • /
    • 제15권1호
    • /
    • pp.61-68
    • /
    • 2015
  • Method of remodeling builder selection for remodeling is competitive bidding. also metropolitan city, megalopolis city, city more than 50million have to do basic plan for remodeling before establishment of a housing cooperative. Purpose of basic plan is improvement of living conditions & the Quality of Life for resident. Technical Proposal Tendering in spite of being the a reasonable bidding system, institutional part, appraisal standard and the item part, consider procedure pard is performed in a similar way to the existing bidding system. so, technical proposal tendering is appropriate for future Method of builder selection of remodeling. therefore, the study purpose is a evaluation element of technical proposal tendering for apartment remodeling business The methods of study is understanding concept through review of precedent literature. Next, case investigation through Analysis of focal points. Lastly, evaluation element deduction of technical proposal tendering for apartment remodeling business through specialist conversation. As a result, Alteration of a right & move management is added to evaluation element's professional field. And detail item is alteration of a right & move management.

최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도 (Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing)

  • 조건희;강승희;이정석;손정락;방종대
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.94-105
    • /
    • 2010
  • 최근 도시내 기반시설이 노후화된 불량지구에 거주하는 사회적 약자(저소득층, 도시빈곤층)가 도시재생과정에서 지불능력한계 등에 의하여 재정착하지 못하고 있는 문제는 사회적 이슈로 부각되고 있다. 이에 본 연구에서는 사회적 약자의 재정착을 위한 방안 중 하나로 '입찰가격 최적화 및 생산비용 절감', '공기단축을 통한 비용절감', '적정 품질 만족'을 목적으로 한 '최저통합환산가격(입찰가격+공사기간환산가격) 개념의 기술제안 기반 입찰제도'를 제시하였으며, 이는 프로젝트단위 기술제안, 공종단위 기술제안, 공기단축 기술제안을 기반으로 이루어진다. 본 연구에서 제안한 최저통합환산가격 개념의 기술제안 기반 입찰제도는 공기단축에 의한 추가적인 인력 및 장비의 투입과 품질향상 등에 의하여 직접비는 상승되나 공기단축에 의한 발주자 비용, 감리비, 원주민 보상비에 대한 이자비용, 간접비, 이자 지급비, 물가 상승비 등의 절감이 기대된다. 이와 더불어 공기단축 및 공사비 절감 관련 기술 지식의 축적은 향후 프로젝트 공사비 및 공사기간 최적화가 가능함은 물론 국가 및 기업 경쟁력 향상이 기대된다.

공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석 (Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding)

  • 이정웅;이성욱
    • 아태비즈니스연구
    • /
    • 제13권1호
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구 (A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method)

  • 여상구;이건;이현철;고성석
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2009년 춘계학술발표대회 논문집
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

기술제안입찰의 효율적 운영방안에 관한 연구 - 공공건설공사를 중심으로 - (Study on the Effective management plan of Technical proposal bid.Business)

  • 최현상;조용;조성;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.107-111
    • /
    • 2009
  • This research provided the technology for the proposed bids to the efficient operation conditions for the application of the existing system of bids and bid proposal, the current technology of the institutional, problems were analyzed. The results of the technical proposal, the current bidding system has been exposed very early points, as ways to overcome these problems and to suggest effective operating plan was to define the details.

  • PDF

공공건설공사의 기술제안형 입찰 운영모델 개발 (Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects)

  • 유일한;김경래
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.136-145
    • /
    • 2008
  • 공공건설사업의 발주방식을 다양화하려는 차원에서 재정경제부는 2007년 10월 $\ulcorner$국가계약법시행령$\lrcorner$ 개정을 통해 기술제안형 입찰인 '기술제안입찰', '설계공모 기술제안입찰'을 새로이 도입하였다. 이러한 입찰은 사업의 특성 및 목적에 맞게 입찰자들에게 기술제안서를 요구한 후 이를 평가하여 낙찰자를 선정하는 방식이다. 본 연구는 국내에 처음 적용되는 기술제안형 입찰제도의 효과적인 운영을 위한 가이드라인을 제공하는 것을 목적으로 하고 있다. 이를 위해 국내외 관련 문헌 및 사례를 분석하여 운영모델의 틀을 구축하였으며, 이후 수차례의 전문가 자문을 통해 표준적인 운영 프로세스, 기술제안서 작성기준, 기술제안서 평가기준, 그리고 낙찰자 결정방법을 개발하였다. 발주자의 중요한 의사결정 요소인 낙찰자 결정방법은 가상 사례를 이용한 시뮬레이션을 수행하여 '기준적합최저가', '가중치', '가격조정입찰', '기술조정점수'의 4가지 낙찰방식이 갖는 정량적 인 특성과 적용기준을 시사점으로 도출하여 제시하였다.

성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 - (The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects)

  • 서재필;류한국;손보식;최윤기
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.76-86
    • /
    • 2016
  • 2014년까지 지속적인 증가세를 보이던 해외건설사업 수주가 2015년에는 하향세가 뚜렷한 모습을 보이고 사업 운영 실적도 감소했다. 이러한 추세의 이유로 저가수주, 사업관리 Know-How 부족과 부실한 사업관리, 클레임 관리 능력 부실 등 여러 이유를 찾을 수 있다. 이에 수주 질적 향상의 필요성이 대두 되고 있다. 반복되는 실패에 대한 교훈을 삼고 입찰과정에서 기술, 상업, 계약적인 사항을 면밀히 검토하고, 사업 초입 단계에서 입찰 업무 시스템의 체계화가 필요하다. 또 사업지역 정보력 등 영업적인 측면의 경쟁력도 키운다면 질 높은 입찰을 제안함으로써 성공적인 사업으로 이끌어 낼 수 있을 것이다. 입찰 기술 고급화 전력이 해외건설사업의 리스크와 원가율, 추후 사업 확장 등 여타 전략적 측면에서 사업 성공의 열쇠(Key)가 되고 있다. 본 연구는 입찰 업무 프로세스 분석과 입찰업무 단계의 핵심성공인자(Critical Success Factor)를 도출하고 업무상의 리스크(Risk)인자를 찾아 핵심성공요인과 연계하여 종합적으로 관리함으로써 리스크 수준을 낮출 수 있는 프로세스 모델을 제시하고자 하는데 목적이 있다.

기술제안입찰형 최고가치 낙찰제도 입찰자 평가체계에 관한 연구 (A Study on the Bidder Evaluation System Using the Technology Proposal-Based Best Value System)

  • 여상구;이현철;고성석
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.124-136
    • /
    • 2010
  • 2000년 이후 국제적 건설시장의 이례적인 침체기가 지속됨에 따라 글로벌 무한경쟁체제 속에 국가경쟁력을 확보하기 위해서는 독보적인 기술력 보유와 더불어 선진화된 건설관리기법의 도입이 절실하게 요구되는 시점이다. 반면 국내 공공공사 입 낙찰제도는 1951년 최저가낙찰제 도입을 시작으로 그 동안 제도 개선이란 명분아래 수차례의 개정을 거듭해 왔지만 그때마다 정책적 이슈와 기대감에 빗대어 괄목할만한 성과를 가져다주지 못했음이 현실이다. 본 연구에서는 2007년 10월 도입이 결정된 최고가치 낙찰제도의 성공적인 국내정착 및 시행의 활성화를 위해 유럽, 미국, 일본 등 선진국의 성공사례를 분석하여 국내실정에 적합한 입찰자 평가체계를 구축하였고 실제 평가에서 활용이 용이한 평가 Tool을 고안하여 제시하였다. 본 연구는 선진국의 동일제도와 국내 유사제도 분석을 토대로 평가요소를 정립하였기에 제시되는 결과물들이 다소 일반적인 건설공사에 국한되는 한계점을 가지며 향후 본 연구에서 보다 발전하여 해당 사업유형에 적합한 특성화된 평가기준의 정립이 필요할 것으로 사료된다.